ML20138K544
| ML20138K544 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/25/1997 |
| From: | WISCONSIN ELECTRIC POWER CO. |
| To: | |
| Shared Package | |
| ML20138K159 | List:
|
| References | |
| PC-1, NUDOCS 9702180411 | |
| Download: ML20138K544 (3) | |
Text
--
NUCLEAR POWER BUSINESS UNIT PC 1 PART 3 OPERATIONS PERIODIC CHECKS NNSR 1/
Revision 21
(
MONTHLY HEATING AND VENTILATION January 25,1997 SYSTEM CHECKS, UNIT 2 TURBINE HALL 6 ' -
- l Date RECORD DSS PROCEDURE VERIFIED CURRENT AND CHECKED FOR TEMPORARY CHANGE 5 IF FIELD i
CoPrEs REoUIRED. usE PaF.com IAw NP 124 AND DO MI COMPLETE TH!s BLOCK BY:
DATE:
i 1.0 PURPOSli To check the condition of filters in the heating and ventilation systems for replacement or cleaning.
)
2.0 PRECAUTIONS AND LIMITATIONS Use gloves while handling filters.
3.0 INITIAL CONDITIONS None INITIALS 4.0 PROCEDURE Check condition of the following disposable filters and replace as i
4.1 necessary
)
NOTE 1: Allfilter material receivedfrom the storeroom must have a completed storeroom requisitionform, Form 1633.
NOTE 2: All disposablefilters are stored in No.2 warehouse.
4.1.1 Unit 2 rod control electric equipment room supply (2W-51, 2F-97) l (24) 16 X 20 X 2 fiberglass filters (911-7695) l 4.1.2 Water treatment supply (W-52, F-98) l (12) 16 X 25 X 2 fiberglass filters (911-7687) i 1
4.1.3 Units 1 and 2 circulating water pump (P30A&B) motor, air intake openings.
l (8 per pump) 14 X 42 X 1 fiberglass filters (911-9621) 9702180411 970210 Page1of3 INFORMATION USE PDR ADOCK 05000301 i
P PDR
NUCLEAR POWER BUSINESS UNIT PC 1 PART 3 OPERATIONS PERIODIC CHECKS NNSR
- f Resision 21 MONTHLY HEATING AND VENTILATION January 25,1997 SYSTEM CHECKS. UNIT 2 TURBINE HALL INITIALS NOTE:
Change bus ductfilters regardless of appearance during months ofMay through October.
4.1.4 Generator bus duct cooling unit (2W-45A&B,2F-95) l (1) 16 X 20 X 2 (911-7695) 4.1.5 D-305/l&2 D-205 battery room recirc and supply fans (F-143/F-144) l (4) 16 X 25 X 2 (915-3402) 4.1.6 Work control center heating and air conditioning Unit (HX-299)
(4) 16 X 20 X 2 (911-7695 4.2 Clean the following industrial heater washable filters and reinstall (months of February and August only).
NOTE:
Ifreplacement mediafor HX-71 is required, measure old media to determine applicable lot number.
16 X 20 X 2 (911-8101) 20 X 25 X 2 (911-8110) 4.2.1 2HX-71 A (El. 46')
4.2.2 2HX-71B (El. 46')
4.2.3 2HX-71C (El. 46')
4.2.4 2HX-71D (El. 26')
4.2.5 2HX-71G (El. 8')
4.2.6 2HX-71H (El. 8')
4.2.7 2HX-71J (El. 8')
4.2.8 2HX-71K (El, 8')
4.2.9 2HX-71M (El. 26')
4.2.10 2HX-71L (El. 26').
Page 2 of 3 INFORMAT'ON USE 9
NUCLEAR POWER BUSINESS UNIT PC 1 PART 3 OPERATIONS PERIODIC CHECKS NNSR 9
Resision 21 MONTHLY HEATING AND VENTILATION January 25,1997 SYSTEM CHECKS. UNIT 2 TURBINE HALL INITIALS 4.3 2HX-259 Ion Chromatocraoh A/C Filter Across From Secondary Samole Eas]
4.3.1 Remove filter retainer and filter media.
4.3.2 Clean filter media with soap and water.
4.3.3 Blow dry and apply a light coat of oil.
(LPS-3 recommended) 4.3.4 Replace filter media and retainer.
4.4 Check WI1 A SA/IA compressor room air circu!ation fan. Brush offdirt from guard and motor Remarks:
4 i
Page 3 of 3 INFORMATION USE
,