NUCLEAR POWER BUSINESS UNIT 0122G j
OPERATING INSTRUCTIONS MINOR Revision 5 CHANGING BORIC ACID EVAPORATOR FEED January 30,1997
(
FILTERS (F8) r Unit RECORD rkOCEDUKE VERIFIED CLRRENT AND C}ECKED FOR TEWORARY CilANGES IF FIELD Date coetrs RicerRED. css raroone, iAw sr : : 4 AxD Do sar countere Tirts etcru DSS BY:
D NTE:
l.0 PURPOSE To provide detailed instructions for charging the boric acid feed filters (F8).
2.0 REFERENCES
IR 96-006, NRC Inspection Report; NRC Commitment for Operations procedures PMT/QC reviews.
3.0 PIlECAUTIONS AND LIMITATIONS 3.1 A radiation work permit and continuous Health Physics coverage is required while changing filters as the filters are highly radioactive.
I b~
3.2 Ensure the spent filter tube's inlet and end caps are removed from the filter vessel before installing new filter tube.
INITIALS 40 INITI AL CONDITIONS in addition to the conditions of Section 3 0 of 01-22, ensure the following-4.1 The following tools are available:
I - 15/16" wrench 1 - 1 1/16" wrench 4.2 A step-off pad at the filter cubicle entrance has been established.
5.0 PROCEDURE 51 Open vessel drain and vent. Allow vessel to drain for 10 minutes 5.2 Loosen the four (4) head bolts and remove the vessel head.
('~x
(
5.3 Manually lift out the old element and place in a plastic bag.
I g21go Page1of2 REFERENCE USE D
K O O 01; P
NUCLEAR POWER BUSINESS UNIT OI 22G OPERATING INSTRUCTIONS MINOR Revision 5 CHANGING BORIC ACID EVAPORATOR FEED January 30,1997 FILTERS (F8)
INITIALS 5.4 Dispose of filter element per the radwaste supervisor.
5.5 Inspect the filter vessel for debris and damage to the seal surfaces, 5.6 Apply a light coat oflubricant (Dow Corning No. 4 I or equal) to the new O-ring and install filter in the vessel.
5.7 Clean and lubricate the closure bolts.
l NOTE:
QC Inspector must witness performance ofStep 5.8.
5.8 Tighten the flange closure bolts in a diagonal sequence, torquing each bolt to a finalload of 75 fVibs.
Torque Wrench No.
Cal Date:
5.9 Flange closure bolts are properly torqued.
QC l
5.10 Close drain valve and clear danger tags if necessary.
- 5. I 1 Fill and vent vessel l
PNIT 5.12 Apply system pressure to vessel and check for leaks 5.13 Clean up area and all tools.
5.14 llave HP perform a final contaminations survey.
5.15 Record test equipment ID's on the Champs Task Sheet.
Ol l