MONTHYEARML20217C0521999-10-0505 October 1999 Proposed Tech Specs 15.3.1.A,15.3.3.A & 15.3.3.C,eliminating Inconsistencies & Conflict Between TSs ML20210M6171999-08-0404 August 1999 Proposed Tech Specs 15.3.5,removing Word Plasma from Discussion of Type of Display Monitor for sub-cooling Info in CR & TS 15.3.7,removing Discussion That Allowed Delay in Declaring EDG Inoperable Due to OOS Fuel Oil Transfer Sys ML20210B5121999-07-15015 July 1999 Pbnp Simulator Four-Yr Rept ML20209C1831999-07-0101 July 1999 Proposed Tech Specs Page Re Amend to Licenses DPR-24 & DPR-27,removing Ifba Enrichment Curve Methodology from TS ML20205R6741999-04-12012 April 1999 Proposed Tech Specs Updating References to Reflect Relocation of Referenced Info in UFSAR ML20203A2261999-02-0202 February 1999 Proposed Tech Specs Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design ML20202F6521999-01-29029 January 1999 Proposed Tech Specs 15.6 & 15.7,reflecting Administrative Control Changes ML20154G5601998-10-0707 October 1998 Proposed Tech Specs Ensuring That 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility ML20154H4231998-10-0505 October 1998 Proposed Tech Specs Section 15.4.1,removing Requirement to Check Environ Monitors on Monthly Basis ML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20154C1941998-09-28028 September 1998 Proposed Tech Specs Table 15.4.1-1 Re Min Frequencies for Checks,Calibrations & Tests of Instrument Channels ML20153G7361998-09-23023 September 1998 Proposed Tech Specs Removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers) ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20236W7861998-07-30030 July 1998 Proposed Tech Specs Change 206,revising to Incorporate Changes to TS to More Clearly Define Requirements for Service Water Sys Operability ML20249C3811998-06-22022 June 1998 Proposed Corrected Tech Specs Pages Re Radiological Effluents ML20248C6651998-05-28028 May 1998 Proposed Tech Specs Providing Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses ML20248G1671998-05-27027 May 1998 Proposed Edited Tech Specs Pages Adding CR & Condenser Air Ejector Radiation Monitor SR & Correcting Errors in Notes of Table 15.4.1-1 ML20203K9571998-02-26026 February 1998 Proposed Tech Specs,Revising Sections 15.3.6, Containment Sys bases,15.3.12 CREFS Including bases,15.4.4 Containment Tests bases,15.4.11 CREFS Including Bases, 15.6.8 Plant Operating Procedures & 15.6.12 ML20203K2981997-12-15015 December 1997 Proposed Tech Specs Re Administrative Controls ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20247P2681997-09-23023 September 1997 Proposed Tech Specs Implementing Boron Concentration Changes Re Planned Conversion of Unit 2 to 18-month Fuel Cycles ML20210M5151997-08-14014 August 1997 Proposed Tech Specs,Removing Requirement in Plant TS to Perform Pbnp Unit 2 Containment Integrated Leak Rate 60-months from Previous Test ML20210J0331997-08-0707 August 1997 Proposed Tech Specs,Replacing Wording & Double Underlining of Revised Wording ML20140C9111997-06-0303 June 1997 Proposed Tech Specs,Modifying TS Section 15.3.3, Eccs,Acs, Air Recirculation Fan Coolers & Containment Spray, to Incorporate AOT Similar to Ones Contained in NUREG-1431,Rev 1 ML20141C5931997-05-0909 May 1997 Proposed Tech Specs Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140D7251997-04-14014 April 1997 Proposed Tech Specs,Changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President- Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c ML20140D7091997-04-14014 April 1997 Proposed Tech Specs,Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20137N6451997-04-0202 April 1997 Proposed Tech Specs 14.2.4, Steam Generator Tube Rupture ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20137C8331997-03-20020 March 1997 Proposed Tech Specs 15.2.2, Safety Limit,Reactor Coolant Sys Pressure ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 1999-08-04
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 ML20137P8441997-02-14014 February 1997 Rev 5 to Authorization of Changes,Test & Experiments (10CFR50.59 & 72.48 Reviews) ML20140G9351997-02-14014 February 1997 Rev 13 to ISTs IT 585, Leakage Reduction & Preventive Maint Program Test of Post-Accident Containment Atmospheric Sampling Sys (Refueling) ML20140G8921997-02-14014 February 1997 Rev 7 to ISTs IT 215, SI Valves (Cold Shutdown) ML20140G9401997-02-0707 February 1997 Rev 21 to TS Tests TS 10A, Containment Airlock Door Seal Testing ML20138K2991997-01-31031 January 1997 Rev 46 to OP 4D,Part 1, Draining RCS to CVCS Hut W/O Entering Reduced Inventory ML20138K2031997-01-31031 January 1997 Rev 6 to IT 380, Purge Valve Air Sys Check Valve (Quarterly) for Unit 1 ML20138K2551997-01-31031 January 1997 Rev 2 to IT 530B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) for Unit 1 ML20138K2411997-01-31031 January 1997 Rev 12 to IT 530, Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 1 ML20138K3231997-01-31031 January 1997 Rev 9 to RP 6A, SG Crevice Flush (Vacuum Mode) ML20137P8551997-01-31031 January 1997 Brine Tank Standpipe Mod ML20138K3071997-01-31031 January 1997 Rev 38 to OP 9C, Containment Venting & Purging ML20138K2901997-01-31031 January 1997 Rev 2 to IT 535A, Leakage Reduction & Preventive Maint Program Test of Train a HHSI & RHR Sys (Refueling) Unit 2 ML20138K2641997-01-31031 January 1997 Rev 12 to IT 535, Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 2 ML20138K4991997-01-31031 January 1997 Rev 9 to Ort 4, Main Turbine Mechanical Overspeed Trip Device for Unit 2 ML20138K3181997-01-31031 January 1997 Rev 33 to RP 1B, Recovery from Refueling ML20138K3031997-01-31031 January 1997 Rev 1 to OP 4D,Part 5, Draining RCS to CVCS Hut W/O Entering Reduced Inventory & W/O SG Tubes ML20138K2251997-01-31031 January 1997 Rev 7 to IT 385, Purge Valve Air Sys Check Valve (Quarterly) for Unit 2 ML20138K4791997-01-31031 January 1997 Rev 15 to Ort 67, Component Cooling Water to & from Excess Letdown Heat Exchanger-Refueling Shutdown for Unit 1 ML20138K4701997-01-31031 January 1997 Rev 17 to Ort 59, Train Spray Sys CIV Leakage Test for Unit 1 ML20138K5041997-01-31031 January 1997 Rev 7 to Ort 50, PRT to Gas Analyzer Sample Line for Unit 2 ML20138K5161997-01-31031 January 1997 Rev 18 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 2 ML20138K4751997-01-31031 January 1997 Rev 19 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 1 ML20138K5231997-01-31031 January 1997 Rev 7 to Ort 71, Electrical Penetration Leak Test for Unit 2 ML20138K7311997-01-31031 January 1997 Rev 9 to TS 80, Sampling of Emergency Fuel Oil Tank (T-72), Fuel Oil Storage Tanks (T-175A,B) & EDG Day Tanks (T-31A,B & T-176A,B)(Quarterly) ML20138K7171997-01-31031 January 1997 Rev 6 to TS 37, Containment Spray Nozzles Check (Frequency of Less than or Equal to Five Yrs) for Unit 1 ML20138K3121997-01-31031 January 1997 Rev 43 to RP 1A, Preparation for Refueling 1998-09-30
[Table view] |
Text
'
NUCLEAR POWER BUSINESS UNIT OI 22D
- OPERATING INSTRUCTIONS MINOR Revision 9 CHANGING SEAL WATER INJECTION FILTERS January 30,1997 p (F39A&B)
O Unit RECORD g3gg PROCEDt'RL VI.RIFIED CURRENT AND CIIECKED I OR T1.MfDRARY CllANGLS IF FIFLD COPILS RI. QUIRED. USL PDF 0026: LAW NP 1.2 4 AND DO M COMPLETI. Tills BLOCK DSS BY: DATE:
1.0 PURPOSE To provide detailed instructions for changing seal water injection filters (F39A&B).
2.0 REFERENCES
IR 96-006, NRC Inspection Report, NRC Commitment for Operations procedure PMT/QC reviews.
3.0 PRECAIITIONS AND LIMITATIONS 3.1 A radiation work permit and continuous Health Physics coverage is required while changing filters, as the filters are highly radioactive.
3 (d 3.2 Use extreme caution against falling or dropping tools when working around the shield plug opening.
3.3 As much work as possible should be performed remotely through the filter access / shield plug opening, to minimize radiation exposure.
INITIALS 4.0 INITI AL CONDITIONS 4.1 01-22, Section 3.0 parts have been obtained.
4.2 01-22, Section 3.0 conditions have been established.
4.3 Verify the desired filter vessel is tagged out and draining.
F-39A F39B 4.4 Obtain the following tools:
4.4.1 1 - 1" Drive, Long Extension (El. 46' Wall Storage)
/ 4.4.2 1 - 2" Socket (Maintenance Tool Room)
U)
$21pD 0 014 Page 1 of 6 REFERENCE USE P PDRg ,
NUCLEAR POWER BUSINESS UNIT 0122D OPERATING INSTRUCTIONS MINOR Revision 9 CilANGING SEAL WATER INJECTION FILTERS January 30,1997 (F39A&B) -
INITIALS -
4.4.3 1 - Filter Vessel Cover liandwheel Remote Operating Adapter 4.4.4 1 "S" liook and Rope (30 ft Rope) 4.4.5 1 - Torque Wrench (386 ft/lbs)(Maintenance) 4.4.6 1 5/8" Socket; 3/4" Drive 4.4.7 1 - 3/4" Combination Wrench 4.4.8 1 - 3/4" Drive Ratchet 4.4.9 Fall Protection (2 - Safety liarnesses) 4.5 Establish a step-off pad at the filter cubicle entrance.
4.6 Establish an equipment lay-down area adjacent to the filter cubicle access plug.
4.7 Route a DI water hose to the filter cubicle access plug.
4.8 Place the yellow filter cask adjacent to the filter cubicle access plug.
(Utilize the " heavy load" cart stored at the snubber test stand for transport.)
4.9 Verify the selected filter has been opened to drain for at least 30 minutes prior to unbolting the head. ;
4.10 In the case of a Unit I filter change, prohibit PAB traffic via PAB l
Door 261 to eliminate congestion and to reduce iha potential for spreading I contamination.
)
4.11 Obtain permission from the DSS to change F39A/B.
DSS 1
l 1
i O
Page 2 of 6 REFERENCE USE
NUCLEAR POWER BUSINESS UNIT 0122D OPERATING INSTRUCTIONS MINOR Revision 9 CHANGING SEAL WATER INJECTION FILTERS January 30,1997 m (F39A&B)
U INITIALS 5.0 PROCEDURE NOTE: Hourlyfire rounds must be established when shieldplug is removed.
5.1 Remove the shield plug using thejib hoist provided.
- ONCE SillELD PLUG IS REMOVED WORKING DIRECTLY AROUND PLUG HOLE MAY REQUIRE FALL PROTECTION 5.2 Using the large extension wrench and two inch socket, unscrew filter vessel closure bolts completely (12 turns). Do not remove the bolts from the flange. ,
- BE ALERT TilAT NOTIIING PROlllBITS RAISING Tile VESSEL llEAD WilEN TIIE IIANDWHEEL IS TURNED. EXCESSIVE FORCE WILL BEND THE DAVIT-ARM.
t 5.3 Using the large extension wrench with the filter vessel head handwheel operating tool attached, turn the handwheel clockwise to its stop to raise the vessel head and bolts clear of the vessel, then swing the head aside.
5.4 Remove the yellow filter cask top plate and open the lower access.
(1-1/2" nuts for tight closure. 3/4" square shaft to open or close lower access.)
5.5 Prepare the cask to receive the filter.
5.5.1 Position the cask above the filter access and pass the filter lifting rope through it.
5.5.2 Connect a three to four foot piece of rope, with a 1/4" "S" hook attached, to the end of the lifting rope which exits the bottom of the cask.
5.6 Catch the filter lifting ring with the "S" hook, then maintain a tight line to ensure the connection is not lost.
Page 3 of 6 REFERENCE USE e
OI 22D NUCLEAR POWER BUSINESS UNIT MINOR OPERATING INSTRUCTIONS Revision 9 January 30,1997 CilANGING SEAL WATER INJECTION FILTERS (F39A&B) 5.7 Lower the cask to a centered position over the filter vessel with the bottom of the cask well into the access opening to provide as much shielding as possible.
5.8 Raise the filter into the cask. Rotate the cask access closed and then secure the lower access for transport using the closure bolts.
5.9 Release the short length of rope into the cask.
5.10 Plastic bag the cask and remove it to the intended filter depository fbr disposal of all items in the cask.
5.10.1 When the filter has been discharged from the cask, rebag the cask and return the cask to the cask storage area on El. 46' of the PAB.
5.10.2 Retum the " heavy-load" cart to storage on El. 66' of the PAB, adjacent to the snubber test stand.
5.11 Flush the filter vessel with water to remove any dirt left behind.
5.12 Inspect the filter vessel seal areas for damage.
5.13 Apply a light coating of silicone lubricant (Dow Corning No. I1 I or equal) to the O-ring of the new filter.
5.14 Install the filter and attached spacer / lifting device by lowering on a line from above Guide to a mating with the stub tube.
NOTE: If 0-ring / backup ring replacement is required, place the new O-ring in the retainerplate groove and check thefit. If the outside diameter of the 0-ring contacts the outer edge of the retainerplate groove, the backup ring should not be used.
5.15 Remove the 0 ring retainer plate from the vessel head. Inspect the O-rings for excessive fiattening or other damage. Replace as necessary.
5.16 Lubricate the 0-rings. Reattach the 0-ring retainer plate to the vessel head. (The wide 0-ring groove should be next to the head.)
O Page 4 of 6 REFERENCE USE
NUCLEAR POWER BUSINESS UNIT 0122D OPERATING INSTRUCTIONS MINOR Revision 9 CHANGING SEAL WATER INJECTION FILTERS January 30,1997 q (F39A&B) {
V INITIALS !
NOTE: Take care not to disengage the head lifting handwheelfrom its
. threaded shaft when lowering the vessel head. +
i 5.17 Swing the filter vessel head into position above the vessel, then turn the handwheel counterclockwise to lower the head onto the vessel. (The .
linkage should be sufficiently free so as not to interfere with head bolt l torquing.)
5.18 Clean and lubricate the cover closure bolts. ;
l NOTE: QC inspector must witness performance ofStep 5.19 5.19 Tighten the head closure bolts in a diagonal sequence. Torque each to a final load of 386 ft/lbs.
l Torque wrench Id. No. Calib. Date 5.20 Filter cover bolts torqued.
QC 5.21 Inform the control room of your intent to fill and vent the filter vessel and ,
l get permission to clear the required Danger tags.
5.22 Select a method of filling and venting the filter vessel dependent on system conditions. Control the vent valve during venting to ensure the vent hose remains directed as desired.
5.22.1 If seal injection pressure (RCS pressure) is greater than 50 psig, then fill and vent with D1 water via the filter drain.
5.22.2 If seal injection pressure is less than 50 psig, then filling from !
, the system is permissible if the filter inlet is only slightly opened and RCP seal differential pressure can be maintained as required. ,
l PMT 5.22.3 Verify no leakage exists from the vessel flange using fitst the .
head of the filling source and then system pressure. (Ifless than normal system pressure exists, but the proper flange torque has been applied, it can be assumed the 0-rings will
.O maintain their seal at the higher pressure.)
U i
Page 5 of 6 REFERENCE USE ;
l
NUCLEAR POWER BUSINESS UNIT 0122D OPEP,ATING INSTRUCTIONS MINOR Revision 9 January 30,1997 Cl-IANGING SEAL WATER INJECTION FILTERS (F39A&B)
INITIALS 5.23 When the leak check is satisfactory, align the filter per the DSS.
5.24 Install shield plug.
5.25 Clean the area and tools.
5.26 Return all tools to their proper storage. (Initial Conditions location) 5.27 llave IIP perform a final contamination survey.
5.28 Record test equipment ID's on the CIIAMPS Task Sheet.
O I