Rev 7 to OI 22E, Changing Letdown Gas Stripper Filters (F60A&B)
ML20138K393
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/30/1997
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20138K159 List: ... further results
References
OI-22E, NUDOCS 9702180240
Download: ML20138K393 (4)


Text

NUCLEAR POWER BUSINESS UNIT 0122E OPERATING INSTRUCTIONS MINOR Revision 7 CHANGING LETDOWN GAS STRIPPER FILTERS January 30,1997

(

\

(F60A&B)

Unit RECORD PR CE URE VERIFIED CURRENT AND CHECKED FOR TEMPORARY CilANGES IF FIELD Date COPIES REQUIRED, USE PDF.002oi1AW NP 1.2 4 AND DOM COMPEFTE T1115 flLOCK DSS BY: DATE:

1.0 - PURPOSE 1.1 To provide detailed instructions for changing the letdown gas stripper filters (F60A&B).

2.0 REFERENCES

IR 96-006, NRC Inspection Report, NRC Commitment for Operations procedure PMT/QC reviews.

3.0 PRECAUTIONS AND I IMITATIONS 3.1 A radiation work permit and continuous Health Physics coverage is required while changing filters, as the filters are highly radioactive.

O V 3.2 Use extreme caution against falling or dropping tools when working around the shield plug opening.

i l

3.3 Ensure the small yellow lead filter removal cask is in a plastic bag with blotting paper prior to transporting cask to prevent spread of contamination. )

l 3.4 As much work as possible should be performed remotely through the filter access / shield plug opening, to minimize radiation exposure.

l 3.5+ Depending on expected radiation exposure, some steps that involve remotely operated l tools may be eliminated in favor of direct operation (pending HP approval).

3.6 Review Precautions and Limitations of 01-22.

3.7 Weight of small yellow cask - 1325 pounds.

3.8 Weight of shield plug - <3450 pounds.

INITIALS 4.0 INITI AL CONDITIONS  !

A 4.1 01-22, Section 4.0 parts have been obtained.

4.2 01-22, Section 4.0 conditions have been established. l 9702190240 970210 .

PDR ADOCK 05000301<

P PDR '

' + Refer to Step 3.3 Page1of4 REFERENCE USE M0 .

NUCLEAR POWER BUSINESS UNIT 0122E OPERATING INSTRUCTIONS MINOR Revision 7 CilANGING LETDOWN GAS STRIPPER FILTERS January 30,1997 (F60A&B)

INITIALS 4.3 Verify the desired filter vessel is tagged out and draining.

F60A F60B 4.4 Obtain the fbliowing tools:

4.4.1 1 - 1/2" drive long-extension and long-handled ratchet 4.4.2 1 - 15/16" socket 4.4.3 1 100 ft-lb torque wrench 4.4.4 Hose-to-drain filter 4.4.5 1 "S" hook and rope (30 ft.)

4.5 Establish a step-off pad at the filter cubicle entrance.

4.6 Establish an equipment laydown area adjacent to the filter cubicle access plug.

4.7 Route a D1 water hose to the filter cubicle.

4.8 Verify the selected filter has been opened to drain for at least 30 minutes prior to unbolting the head.

l 4.9 Obtain DSS pennission to change F60A&B.

DSS 5.0 PROCEDUitE I 5.1 Remove the shield plug using the PAB crane. I 5.2 Loosen three (3) turns, but do not remove the vessel closure nuts using the small extension wrench with 15/16" socket attached. Swing each nut and I bolt assembly aside, free from vessel cover.

5.3 Using the small extension wrench and the special lifting tool, lift hinged l cover out of way. l 5.4 + Suspend the yellow filter cask over the filter plug hole with gate open.

5.5 + From El. 66', lower a rope with attached "S" hook through the filter cask l and catch the bail on the separator plate. I

+ Refer to Step 3.5 Page 2 of 4 REFERENCE USE i 1

.._______1

NUCLEAR POWER BUSINESS UNIT O!22E OPERATING INSTRUCTIONS MINOR Revision 7 CilANGING LETDOWN GAS STRIPPER FILTERS January 30.1997 (F60A&B)

/3 -

V INITIALS 1

5.6+ While standing on El. 66', lift the separator plate and attached filter out of the filter room and into the filter cask and close the gate.

5.7+ Suspend the filter inside the cask by tying off the rope to the sling or crane hook.

5.8+ Place the steel supports across the shield plug opening and place the small lead cask on the supports in line over the filter vessel.

5.9 Transfer the filter element to an " empty" resin liner or designated area in accordance with the radwaste supervisor. (Cut the rope leaving the S hook with the filter when transferring to resin liner.)

5.10 Flush filter vessel with demineralized water to remove all dirt left behind. _

5.11 Inspect filter vessel seal areas for damage. t h 5.12 Guide the filter into the filter housing.

1 5.13 Install new flexitallic gasket on filter vessel flange ensuring flange and cover surfaces are clean.

5.14 Swing filter vessel cover into position.

l NOTE: QC Inspector must witness performance ofStep S.15.

i 5.15 Clean and lubricate cover closure bohs. Tighten the flange bolts in i diagonal sequence torquing each to a final load of 75 ft-lbs.

l Torque Wrench Id. No. Calibration Date 5.16 Filter vessel flange bolts are torqued to 75 ft-lbs.

QC 5.17 Close the drain valve.

5.18 Attach a D1 water nose to the drain connection and fill and vent filter vessel using DI water.

.(%JO) l PMT 5.19 Apply D1 header pressure to tilter vessel and check for leaks.

+ Refer to Step 3.5 Page 3 of 4 REFERENCE USE

-~.m.

l NUCLEAR POWER BUSINESS UNIT 0122E l OPERA 7 ING INSTRUCTIONS MINOR l Revision 7 l CilANGING LETDOWN GAS STRIPPER FILTERS January 30,1997 I (F60A&B)

INITIALS i

5.20 Close and cap filter vessel vent and drain.

l 5.21 Obtain permission and remove Danger tags.

5.22 Align system per DSS.

l PMT 5.23 Perfbrm final leak check of filter vessel when placed on line.

5.24 Install the shield plug and clean the area and all tools.

5.25 Install thread protectors in shield plug lifting holes.

5.26 Return all tools to their proper storage.

5.27 llave HP perform a final contamination survey.

5.28 Record test equipment ID's on the CliAMPS Task Sheet.

O

+ Refer to Step 3.5 Page 4 of 4 REFERENCE USE

- - _ - _ - _ . - _ - _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ . - . - _ _ - _ . _ . _ _ _ _ _ . _ - _ _ _ _ _ . - . _ . _ . _ _ - _ _ _ . - - - _ _ . _ _ _ _ _