Rev 7 to Ort 71, Electrical Penetration Leak Test for Unit 2
ML20138K523
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 01/31/1997
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20138K159 List: ... further results
References
ORT-71-01, ORT-71-1, NUDOCS 9702180401
Download: ML20138K523 (3)


Text

'

NUCLEAR POWER BUSINESS UNIT ORT 71 OPERATIONS REFUELING TESTS MINOR Revision 7 ELECTRICAL PENETRATION LEAK TEST January 31,1997 UNIT 2 m

Date RECORD DSS PROCEDURE VERIFIED CURRENT AND CHECKED FOR TEMPORARY CHANGE 5 IF FIELD CorrEs RECURRED. uSE par.co26. Aw up i : 4 AND Do tigI COMPLETE T1C5 BLOCK BY: DATE:

1.0 PURPOSE The purpose of ORT 71 is to perform a refueling interval leakage test of penetration E58 in Pipeway No. 4.

2.0 REFERENCES

IR 96-006, NRC Inspection Repon, NRC Commitment for Operations procedure PMT/QC reviews.

3.0 PRECAUTIONS AND LIMITATIONS All dectrical penetrations must be leak tested with nitrogen.

% 4.0 INITIAL CONDITIONS INITIALS 4.1 This test may be performed individually or in conjunction with ORT 80.

1 4.2 Permission to Perform Test The conditions required by this test are consistent with required plant

conditions including equipment operability. Permission is granted to i

perform this test.

DSS Time Date 5.0 PROCEDURE NOTE:

e-..y

, Thispenemaaion ang be leak tested with nitrogen.

5.1 Open the isolation valve downstream of pressure gauge for the penetration ..

to be tested and remove the test cap.

5.2 Remove the pressure gauge and valve assembly.

i I

9702180401 970210 Page1of3 CONTINUOUS USE ,

PDR ADOCK 05000301 ' " *

NUCLEAR POWER BUSINESS UNIT ORT 71 OPERATIONS REFUELING TESTS MINOR Revision 7 ELECTRICAL PENETRATION LEAK TEST January 31,1997 UNIT 2 INITIALS NOTE: Minimize the amount oftime the leak rate tester is connected to the mechanicalpenetration.

5.3 Connect the test rig to the penetration test connection and test per 01-58.

5.4 Upon completion of the test, vent the penetration per 01-58.

5.5 Disconnect the test rig and replace the pressure gauge and Whitey valve assembly.

5.6 Repressurize the penetration to 15 psig. Close the isolation valve and replace the test cap.

PMT 5.7 Snoop all disturbed fittings for leakage and tighten / initiate work order, as required.

6.0 EVALUATION To be completed by manager - Operations or his representative.

6.1 Individual leakages compared to allowable value and included in tabulation i of total leak rate.

l 6.2 Results acceptable, not exceeded.

Yes No If no, give details in the remarks section and notify the manager - Regulatory and Support Services to determine reportability.

6.3 Data Analyzed By Date ' ~ ~

Remarks:

l 9l Page 2 of 3 CONTINUOUS USE .

NUCLEAR POWER BUSINESS UNIT ORT 71 OPERNI1ONS REFUELING TESTS MINOR Revision 7 ELECTRICAL PENETRATION LEAK TEST January 31,1997 UNIT 2 L

LEAK TEST DATA SIEET Penetration E58 Pressure Leak Rate Ilms (pJig) (sccm)

Test Instrument ID Range (circle one): Low Mid High Comments:

O .