NUCLEAR POWER BUSINESS UNIT ORT 60

- OPERATIONS REFUELING TESTS MINOR Revision 18 TRAIN B SPRAY SYSTEM CIV LEAKAGE TEST January 31,.1997 UNIT 2 1

Date RECORD DSS PROCEDURE VERMED CURRENT AND CHECKED TT meORARY CHMGE5 IF MELD COPIES REQUIRED. USE PBF6 IAW NP 1.24 AND DO M COMPLETE TH:3 BLOCK 1

BY; DATE:

' l.0 PURPOSE To perform a refueling shutdown seat leakage test of valves 2SI-862B, 862H, 864B and 868B as t

required by Appendix J.

2.0 REFERENCES

i IR 96-006, NRC Inspection Report, NRC Commitment for Operations procedure PMT/QC l

reviews.

4 t

3.0 PRECAUTIONS AND LIMITATIONS 3.1 Locate the Volumetrics tester in an area which will limit personal exposure.

)

3.2 Do not allow liquids to enter the Volumetrics tester or damage may occur 3.3 All liquids must be drained from piping subsystem prior to attaching the test rig.

+

3.4 During the test, the SI test line is removed from service. The SI pump control switches must be in the pull-out position, but one SI pump may be operable for reduced inventory l

operation or boration flow path. With the associated SI pump mini-recirc shut, a pump discharge flow path must be established prior to manually starting the pump.

I J

4.0 INITIAL CONDITIONS INITIALS 4.1 The RCS is in a cold or refueling shutdown and containment integnty is not l

required i

4.2 Permission to Perform Test i

n The conditions required by this test are consistent with required plant conditions including equipment operability. Permission is granted to i

perform this test.

DSS Time Date I

/.

9702180394 970210 Page1 of9 CONTINUOUS USE I

PDR ADOCK 05000301 l

p PDR s.

NUCLEAR POWER BUSINESS UNIT ORT 60 OPERATIONS REFUELING TESTS MINOR Revision 18 TRAIN B SPRAY SYSTEM CIV LEAKAGE TEST January 31,1997 UNIT 2 INITIALS 5.0 ISOLATE AND DRAIN SYSTEM FOR TESTING 5.1 Shut 2SI-870B,2P-14B RWST suction MOV.

5.2 Verify shut 2SI-871B, Train B RHR/ Spray X-conn MOV.

5.3 Position and red tag:

NOTE:

Tagging shut 2SI-868B satisfies " containment closure" requirements throughout this test.

POSITION 2SI-868B, B train spray CIV..

.. Shut 2B52-38.A,2P-14A bkr on 2B-03..

. Rack out 2B52-27A,2P-14B bkr on 2B-04..

.... Rack out

..... Rack out

. Rack out 2B52-423J,2SI-870B bkr on 2B-42....

. Open 2B52-423M,2SI-871B bkr on 2B-42..

.. Open 2SI-870B,2P-14B RWST suction MOV handwheel..

. Shut 2SI-871B,2P-14B/RHR X-conn MOV handwheel.

. Shut 2SI-874B, NaOH supply to eductor.

. Shut 2SI-864C,2P-14B 3/4" recire.

. Shut 2SI-873B,2P-14B 2" recirc.........

. Shut 2SI-831D, Spray additive test line isolation..

. Shut One SI pump breaker may be racked in with the respective pump control switch in " Pull-out," if required for reduced inventory operation.

Page 2 of 9 CONTINUOUS s SE

. =

NUCLEAR POWERBUSINESS UNIT ORT 60 OPERATIONS REFUELING TESTS MINOR Revision 18 TRAIN B SPRAY SYSTEM CIV LEAKAGE TEST January 31,1997 l(

UNIT 2

(

INITIALS 5.4 Shut the following valves:

2SI-862E, 2FT-963 sensing line isolation 2SI-862F, 2FT-963 sensing line isolation 2SI-864A, 2P-14A test line isolation 2SI-864D,2P-14A 3/4" recirc 2SI-873A, 2P-14A 2" recirc 2SI-879B, containment SI test line 2SI-897B, test line AOV aCAUTION" IF AN SI PUMP BREAKER IS RACKED IN, THE CONTROL ROOM OPERATOR SHALL BE INFORMED WHEN THE ASSOCIATED 2P-15A OR B MINI-RECIRC IS SHUT.

2SI-876A,2P-15A mini-recirc 2SI-876B,2P-15B mini-recire 1

5.5 Attach drain hoses from 2SI-883, D25 and D31 to a floor drain.

5.6 Open the following valves to drain system:

2SI-860C,2P-14B discharge MOV 2SI-860D,2P-14B discharge MOV 2SI-884, test line manualisolation 2SI-883, test line sample / drain 2SI-864B, 2P-14B test line isolation 2SI-D12,2P-14B casing drain

.d 2SI-D25, 2P-14B discharge check valve bonnet drain 2SI-D31, high flow recire orifice drain 2SI-862H, high flow recirc manual isolation 2SI-869B, Train B air test conn / vent

~

9 Page 3 of 9 CONTINUOUS USE, 4

NUCLEAR POWER BUSINESS UNIT ORT 60 OPERATIONS REFUELING TESTS hENOR Revision 18 TRAIN B SPRAY SYSTEM CIV LEAKAGE TEST January 31,1997 UNIT 2 INITIALS 5.7 Remove 1/2" pipe plug from the 2" pipe tee in the eductor line above the eductor to facilitate draining at D12 and D25.

NOTE:

Ifpost-maintenance or operability testing of2SI-862B, 862H, or 864B is not required, then N/A all ofSection 6.0.

6.0 SEAT LE_AKAGE TEST OF 2SI-862B. 862H AND 864B 6.1 When drainage ceces at 2SI-D31, then shut 2SI-862H and D31.

6.2 Open 2SI-V21 as a vent path for 2SI-862H.

6.3 When drainage ceases at 2SI-D12, then reinstall the 1/2" pipe plug at the eductor 2" suction line tee and shut 2SI-D12.

6.4 Attach SA to the test connection for 2PI-933B and pressurize slightly

(<10 psig) to blow water downstream of 2SI-860C&D out the 2SI-D25 drain connection.

6.5 When drainage ceases at 2SI-D25, then remove the SA connection from 2PI-933B. Shut and cap the 2PI-933B test connection.

6.6 Attach the Volumetrics test rig to 2SI-869B.

6.7 Shut 2SI-D25.

6.8 Verify valve alignment per Dwg. B-IVLT-SSP.

l 6.9 Pressurize the system to 54-57 psig, then crack open 2SI-D25 and verify that there is no water on the seat of 2SI-862B. Reshut 2SI-D25 and cap.

6.10 Test the system per 01-58 and record data on the data sheet.

6.11 If total system leakage is >1500 sccm, then quantify individual valve leakage as follows:

6.11.1 To measure 2SI-862B leakage, connect an Omega rotameter at 2SI-D12 and record flow.

secm i

Page 4 of 9

. CONTINUOUS USE 4

= -. -

NUCLEAR POWER BUSINESS UNIT ORT 60 OPERATIONS REFUELING TESTS MINOR Revision 18 TRAIN B SPRAY SYSTEM CIV LEAKAGE TEST January 31,1997 UNIT 2 '

INITIALS 6.11.2 To measure 2SI-862H leakage, connect an Omega rotameter at 2SI-V21 and record flow.

sccm 6.11.3 To measure 2SI-864B leakage, connect an Omega rotameter at 2SI-883 and record flow.

seem 6.11.4 To quantify 2SI-868B leakage, total the previous three rotameter readings and subtract from the Volumetrics rig value.

Record seem 6.12 When the test is complete, shut 2SI-869B and detach the test rig.

6.13 Open 2SI-869B and vent the test volume to atmospheric pressure s

6.14 Perform post-test valve alignment

]

POSITION i

2SI-884, test line manual isolation.........

. Shut 2SI-883, test line sample / drain..

....... Shut 2SI-D12,2P-14B casing drain....

. Shut 2SI-V21, high flow recire line vent.......

....... Shut 2SI-869B, header air test connection................................... Shut 2SI-862E, 2FT-%3 sensing line........................................... Open 2SI-862F, 2FT-%3 sensing line............................................ Open 2SI-860C, 2P-14B discharge MOV......................................... Shut 2SI-860D, 2P-14B discharge MOV........................................ Shut 2SI-864D, 2P-14A 3/4" recirc..................................... LO 2SI-876A, 2P-15 A mini-recirc........................................... LO 2SI-876B, 2P-15B mini-recirc........................................... LO

~

2SI-897B, test line AOV................................... Gag Open j

l l

Page 5 of 9 CONTINrJOUS USE,

)

i

i NUCLEAR POWER BUSINESS UNIT ORT 60 l

OPERATIONS REFUELING TESTS MINOR Revision 18 TRAIN B SPRAY SYSTEM CIV LEAKAGE TEST January 31,1997 UNIT 2 INITIALS NOTE:

Ifpost-maintenance or operability testing of 2SI-868B is not required, then N/A allofSection 7.0.

7.0 SEAT LEAKAGE TEST OF 2SI-868B 7.1 Verify 2SI-868B is tagged shut for " containment closure."

NOTE:

Attaching to and opening 2SI-868D does not violate " containment closure. "

7.2 Attach the Volumetrics test rig to the stem leak-off test connection of 2SI-868B.

7.3 Open 2SI-869B as a vent path.

l 7.4 Pressurize to 61-65 psig.

7.5 Open 2SI-868D and test per 01-58. Record test data on the data sheet.

e 7.6 When the test is complete, depressurize and disconnect the test rig.

7.7 Shut and red lock 2SI-868D.

/

7.8 Cap or plug the 2SI-868B stem leak-off test connection.

/

7.9 Shut and cap 2SI-869B.

8.0 RESTORATION OF SPRAY SYSTEM. TRAIN B NOTE:

CL-7B will beperformed as afinal venfication ofsystem alignment for criticality.

8.1 Clear the ORT 60 red tag series and align the tagged components per the DSS.

8.2 Lock open 2SI-868B. Lock No.

8.3 Fill and vent 2P-14B. If 2P-14B cannot be filled and vented at this time, then leave a turnover note with the DSS and DOS to fill and vent prior to operation of 2P-14B.

Page 6 of 9 CONTINUOUS USE d

~.

NUCLEAR POWERBUSINESS UNIT ORT 60 OPERATIONS REFUELING TESTS MINOR Revision 18 TRAIN B SPRAY SYSTEM CIV LEAKAGE TEST January 31,1997 UNIT 2 gj INITIALS rar 8.4 Leak check the %" pipe plug at the educator 2" suction line tee when system is filled.

9.0 EVALUATION TO BE COMPLETED BY OPERATIONS MANAGER OR HIS REPRESENTATIVE.

9.1 Individual leakages compared to allowable value and included in tabulation of total leak rate.

9.2 Results acceptable, no limits exceeded.

Yes No

  • (If no, give details in the remarks section and notify the Regulatory Services manager to determine reportability).

9.3 Data Analyzed By:

l Date:

Remarks:

6 J

(

l Page 7 of 9 CONTINUOUS USE

NUCLEAR POWER BUSINESS UNIT ORT 60 OPERATIONS REFUELING TESTS MINOR Revision 18 TRAIN B SPRAY SYSTEM CIV LEAKAGE TEST January 31,1997 UNIT 2 LEAK TEST DATA 2,SI-8628. 862H. 864B IJms Pressure (osig)

Leak Rate (sccm)

Test Instrument ID Range: Lo, Med, Hi (circle one) 2SI-868B IJme Pressure (osig)

Leak Rate (sccm)

Test Instrument ID Range: Lo, Med, Hi (circle one)

Comments:

Test Operator Date Page 8 of 9 CONTINUOUS USE 4

g g

O

NUCLEAR POWERBUSINESS UNIT ORT 60 OPERATIONS REFUELING TESTS MINOR Revision 18 TRAIN E SPRAY SYSTEM CIV LEAKAGE TEST January 31,1997 t]

UNIT 2 _

v

][*so-u 3

~ obis f v

E**'

,t, r

osar{

w e

Xes2x O

Kvkt ya

--4l,$,u

,f a

.f.

6

,u p

a ta_

e-> m.

saoe.o ou TO TEST 2SI-862B. 862H AND 864B INITIALS SHUT 2SI-868B 2SI-862E 2SI-862F 2SI-862H 2SI-864B 2SI-D25 OPEN:

2SI-V21 2SI-860C

~

2SI-860D 2SI-D12 2SI-884 2SI-883 2SI-869B Dwg. V-IVLT-SSP Page 9 of 9 CONTINUOUS USE l