MONTHYEARML20217C0521999-10-0505 October 1999 Proposed Tech Specs 15.3.1.A,15.3.3.A & 15.3.3.C,eliminating Inconsistencies & Conflict Between TSs ML20210M6171999-08-0404 August 1999 Proposed Tech Specs 15.3.5,removing Word Plasma from Discussion of Type of Display Monitor for sub-cooling Info in CR & TS 15.3.7,removing Discussion That Allowed Delay in Declaring EDG Inoperable Due to OOS Fuel Oil Transfer Sys ML20210B5121999-07-15015 July 1999 Pbnp Simulator Four-Yr Rept ML20209C1831999-07-0101 July 1999 Proposed Tech Specs Page Re Amend to Licenses DPR-24 & DPR-27,removing Ifba Enrichment Curve Methodology from TS ML20205R6741999-04-12012 April 1999 Proposed Tech Specs Updating References to Reflect Relocation of Referenced Info in UFSAR ML20203A2261999-02-0202 February 1999 Proposed Tech Specs Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design ML20202F6521999-01-29029 January 1999 Proposed Tech Specs 15.6 & 15.7,reflecting Administrative Control Changes ML20154G5601998-10-0707 October 1998 Proposed Tech Specs Ensuring That 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility ML20154H4231998-10-0505 October 1998 Proposed Tech Specs Section 15.4.1,removing Requirement to Check Environ Monitors on Monthly Basis ML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20154C1941998-09-28028 September 1998 Proposed Tech Specs Table 15.4.1-1 Re Min Frequencies for Checks,Calibrations & Tests of Instrument Channels ML20153G7361998-09-23023 September 1998 Proposed Tech Specs Removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers) ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20236W7861998-07-30030 July 1998 Proposed Tech Specs Change 206,revising to Incorporate Changes to TS to More Clearly Define Requirements for Service Water Sys Operability ML20249C3811998-06-22022 June 1998 Proposed Corrected Tech Specs Pages Re Radiological Effluents ML20248C6651998-05-28028 May 1998 Proposed Tech Specs Providing Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses ML20248G1671998-05-27027 May 1998 Proposed Edited Tech Specs Pages Adding CR & Condenser Air Ejector Radiation Monitor SR & Correcting Errors in Notes of Table 15.4.1-1 ML20203K9571998-02-26026 February 1998 Proposed Tech Specs,Revising Sections 15.3.6, Containment Sys bases,15.3.12 CREFS Including bases,15.4.4 Containment Tests bases,15.4.11 CREFS Including Bases, 15.6.8 Plant Operating Procedures & 15.6.12 ML20203K2981997-12-15015 December 1997 Proposed Tech Specs Re Administrative Controls ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20247P2681997-09-23023 September 1997 Proposed Tech Specs Implementing Boron Concentration Changes Re Planned Conversion of Unit 2 to 18-month Fuel Cycles ML20210M5151997-08-14014 August 1997 Proposed Tech Specs,Removing Requirement in Plant TS to Perform Pbnp Unit 2 Containment Integrated Leak Rate 60-months from Previous Test ML20210J0331997-08-0707 August 1997 Proposed Tech Specs,Replacing Wording & Double Underlining of Revised Wording ML20140C9111997-06-0303 June 1997 Proposed Tech Specs,Modifying TS Section 15.3.3, Eccs,Acs, Air Recirculation Fan Coolers & Containment Spray, to Incorporate AOT Similar to Ones Contained in NUREG-1431,Rev 1 ML20141C5931997-05-0909 May 1997 Proposed Tech Specs Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140D7251997-04-14014 April 1997 Proposed Tech Specs,Changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President- Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c ML20140D7091997-04-14014 April 1997 Proposed Tech Specs,Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20137N6451997-04-0202 April 1997 Proposed Tech Specs 14.2.4, Steam Generator Tube Rupture ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20137C8331997-03-20020 March 1997 Proposed Tech Specs 15.2.2, Safety Limit,Reactor Coolant Sys Pressure ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 1999-08-04
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 ML20137P8441997-02-14014 February 1997 Rev 5 to Authorization of Changes,Test & Experiments (10CFR50.59 & 72.48 Reviews) ML20140G9351997-02-14014 February 1997 Rev 13 to ISTs IT 585, Leakage Reduction & Preventive Maint Program Test of Post-Accident Containment Atmospheric Sampling Sys (Refueling) ML20140G8921997-02-14014 February 1997 Rev 7 to ISTs IT 215, SI Valves (Cold Shutdown) ML20140G9401997-02-0707 February 1997 Rev 21 to TS Tests TS 10A, Containment Airlock Door Seal Testing ML20138K2991997-01-31031 January 1997 Rev 46 to OP 4D,Part 1, Draining RCS to CVCS Hut W/O Entering Reduced Inventory ML20138K2031997-01-31031 January 1997 Rev 6 to IT 380, Purge Valve Air Sys Check Valve (Quarterly) for Unit 1 ML20138K2551997-01-31031 January 1997 Rev 2 to IT 530B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) for Unit 1 ML20138K2411997-01-31031 January 1997 Rev 12 to IT 530, Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 1 ML20138K3231997-01-31031 January 1997 Rev 9 to RP 6A, SG Crevice Flush (Vacuum Mode) ML20137P8551997-01-31031 January 1997 Brine Tank Standpipe Mod ML20138K3071997-01-31031 January 1997 Rev 38 to OP 9C, Containment Venting & Purging ML20138K2901997-01-31031 January 1997 Rev 2 to IT 535A, Leakage Reduction & Preventive Maint Program Test of Train a HHSI & RHR Sys (Refueling) Unit 2 ML20138K2641997-01-31031 January 1997 Rev 12 to IT 535, Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 2 ML20138K4991997-01-31031 January 1997 Rev 9 to Ort 4, Main Turbine Mechanical Overspeed Trip Device for Unit 2 ML20138K3181997-01-31031 January 1997 Rev 33 to RP 1B, Recovery from Refueling ML20138K3031997-01-31031 January 1997 Rev 1 to OP 4D,Part 5, Draining RCS to CVCS Hut W/O Entering Reduced Inventory & W/O SG Tubes ML20138K2251997-01-31031 January 1997 Rev 7 to IT 385, Purge Valve Air Sys Check Valve (Quarterly) for Unit 2 ML20138K4791997-01-31031 January 1997 Rev 15 to Ort 67, Component Cooling Water to & from Excess Letdown Heat Exchanger-Refueling Shutdown for Unit 1 ML20138K4701997-01-31031 January 1997 Rev 17 to Ort 59, Train Spray Sys CIV Leakage Test for Unit 1 ML20138K5041997-01-31031 January 1997 Rev 7 to Ort 50, PRT to Gas Analyzer Sample Line for Unit 2 ML20138K5161997-01-31031 January 1997 Rev 18 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 2 ML20138K4751997-01-31031 January 1997 Rev 19 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 1 ML20138K5231997-01-31031 January 1997 Rev 7 to Ort 71, Electrical Penetration Leak Test for Unit 2 ML20138K7311997-01-31031 January 1997 Rev 9 to TS 80, Sampling of Emergency Fuel Oil Tank (T-72), Fuel Oil Storage Tanks (T-175A,B) & EDG Day Tanks (T-31A,B & T-176A,B)(Quarterly) ML20138K7171997-01-31031 January 1997 Rev 6 to TS 37, Containment Spray Nozzles Check (Frequency of Less than or Equal to Five Yrs) for Unit 1 ML20138K3121997-01-31031 January 1997 Rev 43 to RP 1A, Preparation for Refueling 1998-09-30
[Table view] |
Text
{{#Wiki_filter:d ! NUCLEAR POWER BUSINESS UNIT IT325 V6 4
. INSERVICE TESTS ; - MAJOR J< -t Revision 8 March 21,1997 CVCS VALVES (COLD SHUTDOWN)
UNIT 2 Date RECORD PR Cm0RE VERFED CURRIM AND CHECNOR WPORARY CHANGE F HED DSS- COPIES REQUIRED, USE PBF 0026i 1AW NP 114 AND DO g COMP 1ETE THIS BLOCK.
BY: DATE:
'Isr PURPOSE. -
(G ;1.1. '
Thh purpose of this test is to perform a full stroke exercise test of the following valves as
* - required by ASME Boiler and Pressure Vessel Code, Section XI, Inservice Inspection of
. a., ' .., 4.QMNuclear Power Plant Components.
2CV-371 A . Letdown isolation valve 2CV-371'. Letdown isolation valve 2CV-112B RWST to charging pump suction MOV 2CV-112C VCT to charging pump suction MOV 2CV-142 Normal charging line flow control valve 2CV-357 RWST to charging pump suction check valve 2CV-384B Manual outlet isolation for 2CV-142 1.2 Testine of the Followine Valves Satisfies Environmental Oualification Reauirements:
2CV-371 A Letdown isolation valve 2CV-1296 Auxiliary charging valve l 1.3 Testing of the following valves satisfies the biennial position indicator verification (PIT) required by ASME, Boiler and Pressure Vessel Code, Section XI, Inservice Inspection of Nuclear Power Plant Components.
2CV-371 A - Letdown isolation valve 2CV-371 - Letdown isolation valve 2CV-12% : . Auxiliary charging valve 2CV-112B RWST to charging pump suction MOV >
, . 2CV-112C -VCT to charging pump suction MOV
_ 2CV-142 Normal charging line flow control' valve-d 4
1 Page 1 of 9 CONTINUOUS USE 9705120239 970505 PDR ADOCK 05000301 P
1
i~-{. , '. NUCLEAR POWER BUSINESS UNIT IT 325 w
i y h Y ; JINSERVICE TESTS, ' MAJOR i
Revision 8
- CVCS VALVES (COLD SHUTDOWN) March 21,1997 UNIT 2, l l
12.0 PRECAUTIONS AND LIMITATIONS 1
i l ~ 2.li i Do not perform this inservice test while the reactor coolant s'ystem is in the i l -
' solid condition.
,,..e
+ : 2.2: For the purposes of valve stroke testing, stroke time is the time it taides the
, 'f fvalyd to go from full open to full shut or full shut to full open; by the -
~ q ,
> control board indication.- The stopwatch should be started at the moment dj #2 Mthe'conirol switchis actusted. D i
y . ,m ., ,
1 aqdd $ M2.3MAYontainment entry is required to verify local position i dication on jQp . ., ;
> f valves 2CV-371 A and 2CV-1296. Verify RWP requirements are met. -
3
. , a "
' ' : 2.41 ; Pressurizer level will slowly ' increase during this procedure due to CVCS i
. f letdown'being secured with seal injection flow being maintained.
Consider placing the excess letdown heat exchanger in service.
72.5 Auxiliary charging line may be in service at times during the outage. This !
procedure will require the use of normal charging. !
3.0 INITIALS INITIAL CONDITIONS I z-3.1 - \
;This test is being done to satisfy: '
1 The normally scheduled callup. Task sheet No.
Post-maintenance operability test for (equip. ID)
)
-. MWR No.(s)
, ,. n . Task sheet No.(s)
Special test - no numbers .
- , u^ ; Explain; i29 [Thereacto isagt
. r at"a power condition; -
m :. , ,
't, '* *;, , '
1 43.3 _ iThe reactor coolant system is aqt in a solid condition..
A my - , 4
- e , . . . .
' ?.
33.4/ 3The associated letdown gas stripper is off-line 3.5 A stopwatch is available to time the stroking of valves.
- ID No.
i l? Page 2 of 9. CONTINUOUS USE I
JNUCLEAR POWERBUSINESS UNIT IT 325 INSERVICE TESTS MAJOR 0 1 Revision 8 1 m CVCS VALVES (COLD SHUTDOWN) March 21,1997 l UNIT 2 i INITIALS 3.6 RCS wide range pressure from 2PI-420C
,_ psig 3.7 Only applicable sections / steps need be performed. Sections / steps not to lie performed should be marked N/A by the DSS / DOS.
3.8 ; : Permission to Perform Test l
b ' The conditions r6 quired by this test are consistent with required plant l
-~~~cr conditions including equipment operability. Permission is granted to !
perform this test. )
i l
DSS' TIME DATE 4.0 PROCEDURE 4.1 Go offletdown by shutting or checking shut letdown orifice valves 2CV-200A. B and C, and RHR letdown valve,2CV-369A, if on RHR.
NOTE: Sec Trecautions and Limitations Step 2.3 concerning containment l entry requirements.
4.2 Check shut 2CV-323A, auxiliary charging line manual isolation.
4.3 Shut 2CV-371 A. Letdown isolation Valve 4.3.1 Time to shut. sec.
4.3.2 Check the local valve position indicator for shut indication.
% open
-4.3.3 Check the status light BRIGHT for 2CV-371 A on Unit 2 isolation Panel B.
- l[ : Page 3 of 9 CONTINUOUS USE
NUCLEAR POWER BUSINESS UNIT - IT 325 . ;
l : INSERVICE TESTS MAJOR
.t Revision 8 .
CVCS VALVES (COLD SHUTDOWN) March 21,1997 UNIT 2 INITIALS 4.4 Open 2CV-371 A. Letdown Isolation Valve 4.4.1 Time to open. sec.
l 4.4.2 Check the local valve position indicator for open indication.
j . % ogn 4.4.3 Check the status light OFF for 2CV-371 A on Unit 2 isolation
-PanelB.
- _c 4.5 ' Open 2CV-1296. Auxiliary Chargine Valve While Timine Same 4.5.1 Time to open. sec.
4.5.2 Check mechanical position indication for open indication.
% open 4.5.3 Check the status light OFF for 2CV-1296 on Unit 2 isolation PanelA.
4.6 Shut 2CV-1296. Auxiliary Charcina Valve While Timine Same 4.6.1 Time to shut. sec.
4.6.2 Check mechanical position indication for shut indication.
% open 4.6.3 Check the status light BRIGHT for 2CV-1296 on Unit 2 isolation Panel A.
4.7 Shut 2CV-371. Letdown Isolation Valve 4.7.1 Time to shut. sec.
4.7.2 Check the local valve position indicator for shut indication.
% open-4.7.3 ' Check the status light BRIGHT for 2CV-371 on Unit 2 isolation Panel B.'
l Page 4 of 9 CONTINUOUS USE
- NUCLEAR POWER BUSINESS UNIT IT 325 ,
. INSERVICE TESTS- ' MAJOR
'; *- i Revision 8
. CVCS VALVES (COLD SHUTDOWN) March 21,1997 UNIT 2 INITIALS 4.8' Open 2CV-371. Letdown Isolation Valve 4.8.1 Time to open. sec.
4.8.2 Check the local valve position indicator for open ind'ication.
m . % open
. 4.8.'3 Che'ck the status light OFF for 2CV-371 on Unit 2 isolation PanelB.
4 a w .7 al,_e NOTE: Steps 4.9 through 4.12 isolatesflow to the normal charging line.
Adjust chargingpump speed as required to maintain sealinjection flow to the RCPseals without hfting the chargingpump relief valves. i 4.9 Shut 2CV-142 charging line flow control valve via 2HC-142 at 2C04.
4.10 Check for Shut Indication for 2CV-142 4.10.1 2CV-142 position indicating lights on 2C04 indicate SHUT.
4.10.2 2CV-142 Local valve indicator. <
% open. t 4.11 Shut 2CV-384B, manual outlet isolation for 2CV-142.
'4.12 Open and Time Open 2CV-142 Via the Followine Steos '
4.12.1 Establish communications between Unit 2 control operator and the operator at 2CV-142.
4.12.2 Remove the plug on the vent line for IA-1664,2CV-142 operating air supply test valve.
',' a k
. Page 5 of 9 CONTINUOUS USE l?
- .- - . - . . . _ = _ - . - . .. . - -. .- -
i NUCLE'AR POWER BUSINESS UNIT IT 325 .
.INSERVICETESTS - MAJOR Revision 8 .
' CV_CS VALVES (COLD SHU1DOWN) March 21,1997 UNIT 2 INITIALS l ' NOTE: The time to openfor 2CV-142 is the time requiredfor the :
indicating lights on 2C04 to indicate valve 2CV-142 is open.
9.
~
- L4.12.3 Fail open and time 2CV-142 by placing IA-1664 to the vent ,
l- . position.
3 ,
. yj 'a(.? Time to open.;. sec.
- . m :
1 e b.fLocal position in'dication.
,4Ha.,4 ;.~4 m.; % open.. '
J c.. ; Valve position indicating lights on 2C04 indicate 2CV-142
~ is open.
- CAUTION
- DO NOT REPOSITION IA-1664 TO THE '
NORMAL POSITION UNTIL AFTER THE CHARGING LINE FLOW CONTROL,LER, 2HC-142, ON 2C04 IS PLACED IN OPEN.
4.12.4 Place the charging line flow controller,2HC-142, on 2C04 in OPEN.
4.12.5- Check 2CV-142 operating air pressure at or near 0 psig (gauge on right side). Then place IA-1664 in the normal position and red lock IA-1664 in NORMAL.'
.l_- Red Lock # /
;l.( :4.12.6 Replace the plug on the vent line for IA-1664. /
4.12.7- Shut 2CV-142 via 2HC-142 at 2C04.
4.13 Realien Chareine
,. <4.13.1 - - Open 2CV-384B, manual outlet isolation for 2CV-142.
u4 ,,
>c
,.", N.13.21 Position 2CV-142 as required for plant conditions. ,
_ y _.
7, ,
4
" f4.13.3 : Open 2CV-323A, auxiliary charging line manual isolation if -
E closedit Step 4.2.
j Page 6 of 9 CONTIMUbUS USE
1
"- ; NUCLEAR POWER BUSINESS UNIT IT 325 INSERVICE TESTS ~ MAJOR V ' Revision 8 I
CVCS VALVES (COLD SHUTDOWN) March 21,1997 UNIT 2 INITIALS 4.14_ Establish the letdown lineup as directed by the DSS. l l
NOTE: Steps 4.15 through 4.24.2 perform a stroke test of valves 2CV-112B, 2CV-112C, and check valve 2CV-357.
4.15 ' Record charging line flow.
2FI-128 - gpm
~
4:16" Open 2CV-l'12B. RWST to Charcine Pump Suction MOV 4.16.1 Time to'open. sec.
4.16.2 Check the local valve position indicator for open indication.
% open 4.17 Shut 2CV-112C. VCT to Charcine Pump Suction MOV 4.17.1 Time to shut. sec.
4.17.2 Check the local valve position indicator for shut indication.
% open 4.18 Place 2CV-112A, VCT divert valve, in the DIVERT position.
- CAUTION
- WHEN ADJUSTING CHARGING PUMP SPEED, ADJUST 2CV-142 AS NECESSARY TO ENSURE PROPER SEAL INJECTION FLOW TO THE RCPS AND PREVENT LIFTING THE CHARGING PUMP DISCHARGE RELIEF VALVES (S).
4.19 - Momentarily increase charging flow to 261 gpm by increasing charging pump speed and adjusting 2CV-142 as necessary.
4.20 Record charging line flow 2FI-128 gpm lr Page 7 of 9 CONTINUOUS USE
\
l-NUCLEAR POWER BUSINESS UNIT ' IT 325 .
~ INSERVICE TESTS-MAJOR l Revision 8 o H _ CVCS VALVES (COLD SHUTDOWN) March 21,1997 UNIT 2 l
INITIALS 4.21 Reduce charging flow to value recorded in Step 4.15 while adjusting 2CV-142 as necessary to ensure proper RCP seal injection flow.
l 4.22 Place 2CV-112A, VCT divert valve, in the AUTO position.
~
l 4.23 . Open 2CV-112C. VCT to Charaine Pumo Suction MOV l
, 4.23.1 : Time to open. sec.
,~~,2 4.23.2 - Check the local valve position indicator for open indication.
l % open l
4.24 Shut 2CV-1128. RWST to Chargine Pump Suction MOV i 4.24.1 Time to shut.- sec.
4.24.2 Check the local valve position indicator for shut indication.
% open i 4.25 Return the letdown gas stripper to service if required.
NOTE: Step 4.26 does not apply to valves 2CV-112B and 2CV-112C These valves will not be added to the standing order until adequate history is obtained.
l 4.26 - Check the valve operability by comparing the value data with the limits in l the IST Pump and Valve Acceptance Criteria Binder.
i i
l i
L l
7 1
I l
'll Page 8 of 9 CONTINUOUS USE
i- ' NUCLEAR POWER BUSINESS UNIT IT 325
.,; INSERVICE TESTS MAJOR A Revision 8 I -
CVCS VALVES (COLD SHUTDOWN) March 21,1997
! UNIT 2 INITIALS 5.0 . ANALYSIS TO BE COMPLETED WITHIN % HOURS BY OPERATIONS MANAGER OR HIS REPRESENTATIVE.
5.1 ' Comparisons with allowable ranges of test values and analysis of
, deviations complete.
~
5.2 : Any requirements for corrective action? -
- _ . . . . .,_._,,.m c-
' Yes
~
No (If yes, give details in the remarks section.) )
1
- 5.3 Data analyzed by Time and date Remarks- '
I i
J l
l l
- l Page 9 of 9 CONTINUOUS USE
\
r}}