Rev 7 to IT 385, Purge Valve Air Sys Check Valve (Quarterly) for Unit 2
ML20138K225
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 01/31/1997
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20138K159 List: ... further results
References
IT-385, NUDOCS 9702180058
Download: ML20138K225 (14)


Text

_. _ _ _ _ . . . _ _ . - - . _ _ _ _ . _ . _ _ _ _ _ _ . . . __ _.

NUCLEAR POWER BUSINESS UNIT IT 385 [

INSERVICE TESTS MAJOR - ,

Revision 7  !

PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997 I (QUARTERLY)

O UNIT 2 i

Date RECORD  !

DSS rnoCr. DURE vEsunED CURRENT MlD CHECKED FOR TEMPORARY CHANGES IF FIELD CortEs amourRED. vst Par.oa26e 1AW NP l.24 AND DO E2I COMPLETE TlB3 BLOCK i BY: DATE: l 1.0 i PURPOSE l

4 The purpose of this test is to perform a quarterly open and shut exercise test and a biennial seat j leakage test of the following valves as required by ASME Boiler and Pressure Vessel Code,  !

Section XI, " Rules for Inservice Inspection of Nuclear Power Plant Components."

l IA-876 2VNPSE-3244 Purge Supply Accumulator Check Valve IA-877 2VNPSE-3212 Purge Exhaust Accumulator Check Valve i IA-1401 2VNPSE-3245 Purge Supply Accumulator Check Valve  :

IA-1402 2VNPSE-3213 Purge Exhaust Accumulator Check Valve j

2.0 REFERENCES

O IR 96-006, NRC Inspection Repon; NRC Commitment for Operations procedures PMT/QC reviews.

3.0 PRECAUTIONS AND LIMITATIONS 3.1 The unit must be in a condition which does not require the purge system to be in operation. The purge supply and exhaust valves must remain shut during this test.

3.2 . Conditions which require the performance of TS-36 subsequent to IT-385:

{

3.2.1 When containment integrity is being established after a period ofpurge supply ,

and/or exhaust system operation, TS-36 shall be performed following the IT.

3.2.2 When containment integnty is established and T-ring pressure decreases to

<65 psig, TS-36 for the associated purge supply or exhaust valves shall be performed.

3.3 If RCS temperature is greater than 200 F, then only the check valves outside. containment, Sections 5.2and 5.3 should be performed.

O -

$21gDO O O 01 s8e 1 of14 REFERENCE USE P PDR ~

NUCLEAR POWER BUSINESS UNIT IT 385 INSERVICE TESTS MAJOR Revision 7 PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997 )

(QUARTERLY)

UNIT 2 INITIALS 4.0 INITIAL CONDITIONS 4.1 This test is being done to satisfy:

The nonnally scheduled callup.

Post maintenance operability test for (equipment ID)

WO No(s).

Special test - no numbers Explain:

4.2 The purge valves are shut with instmment air being supplied to the valves and seals.

4.3 The T-ring supply air linejumpers are installed in accordance with OI-64A.

4.4 Obtain two calibrated test pressure gauges having a range of 0-150 or 0-200 psig with pressure increments no greater than 2 psi. Calibrate gauges for pressure range of 80 to 100 psig.

4.5 Permission to Perform Test The conditions required by this test are consistent with required plant conditions including equipment operability. Permission is granted to perform this test.

DSS Time Date '

. Page 2 of14 REFERENCE USE

NUCLEAR POWER BUSINESS UNIT IT 385 INSERVICE TESTS MAJOR Revision 7

. PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997 i

,e (QUARTERLY)

UNIT 2 INITIALS 5.0 PROCEDURE d

NOTE: For a typical system layout, reference attached Figure 1. For an exact location by valve number, reference a controlled copy ofP&ID M-209, Sheets 7 and 11.

NOTE: Record all data on the attached data sheets.

NOTE: The testing may beperformed simultaneously on as many valves as i desired,per DSS direction.

NOTE: Forpost-maintenance or operability testing, complete only the section related to the valve being tested l 5.1 Record the initiation and completion of this test in accordance with CL-lE,

" Containment Closure Checklist," if required.

5.2 Test ofIA-877: 2VNPSE-3212 Outer Purne Evhr. net Accumniator Check Valve 5.2.1 Record initial T-ring pressure from the normally installed gauge, psig 5.2.2 Install the test gauge in the vent line at IA-373.

5.2.3 Open IA-373.

4

. 5.2.4 Record ten gauge pressure. psig 5.2.5 Isolate instrument air to the purge valve by shutting IA-875.

5.2.6 Monitor the pressure on the test gauge. If pressure is visibly decreasing, reestablish instrument air to the valve and check for i

ler.ks. Once leaks are repaired, or if no leaks exist, continue with test. Note any leaks in the remarks section.

Page. 3 of 14 4

g e

. REFERENCE USE.

e

NUCLEAR POWER BUSINESS UNIT IT 385 INSERVICE TESTS MAJOR Revision 7 PURGE VALVE AIR SYSTEM CIIECK VALVE January 31,1997 (QUARTERLY)

UNIT 2 INITIALS NOTE: Ifcontainment integrity is set, do not allow the T-ring supply pressure to decrease below 65psig on the test gauge if pressure reaches 70psig, immediately shut IA-372 and reopen LA-875.

5.2.7 Remove cap and slowly open IA-372. Allow the pressure to bleed off.

5.2.8 When the air at IA-372 has bled off, record pressure from the test gauge on the attached test data sheet. Record pressure every l'. minutes for one hour or until pressure decreases by 1 1

>5 psig. Record the final time and pressure.

5.2.9 Shut IA-372 and replace cap.

{

l 5.2.10 Shut IA-373 and remove test gauge.

NOTE: Ifcontainment integrity is set, do not allow the T-ring  ;

pressure to decrease below 65psig on the installedgauge If pressure reaches 70psig, immediately shut IA-373 vent valve, open IA-875, and contact the DSSfor direction. Do not continue with this test.

5.2,11 Open IA-373 and bleed accumulator pressure to between 80 psig and 75 psig. Record pressure on the attached test data sheet.

5.2.12 Open IA-875 and repressurize the system. Verify that T-ring pressure on the normally installed gauge returns to witidn 4 psi of the initial pressure in Step 5.2.1. Record final T-ring pressure on the attached test data sheet.

4 5.2.13 Replace cap on IA-373.

~

l PMT 5.2.14 SNOOP check the vent line caps. Repair any leaks as necessary.

Page 4 of14 REFERENCE USE

. . _ . 9 -

NUCLEAR POWER BUSINESS UNIT IT 385 INSERVICE TESTS MAJOR '

Revision 7 PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997 (QUARTERLY) g __ UNIT 2 INITIALS 5.2.15 Check the valve's operability by comparing the data with the limits in Pump and Valve IST Program Acceptance Criteria.

5.2.16 Perform independent valve verification of Section 5.6.

5.3 Test oflA-876 2VNPSE-3244 Outer Purge Suoolv Accumulator Check

_YAvc 5.3.1 Record initial T-ring pressure from the normally installed gauge.

psig ,

j 5.3.2 Install the test gauge in the vent line at IA-371.

5.3.3 Open IA-371.

5.3.4 Record test gauge pressure. psig 5.3.5 Isolate innrument air to the purge valve by shutting IA-874.

eO 5.3.6 i

Monitor the pressure on the test gauge. If pressure is visibly  ;

decreasing, reestablish instrument air to the valve and check for ,

leaks. Once leaks are repaired, or if no leaks exist, continue with test. Note any leaks in the remarks section. l l

l NOTE: Ifcontainment integrity is set, do not allow the T-ring supply

}

pressure to decrease below 65psig on the testgauge. If pressure reaches 70psig, immediately shut M-370 and reopen M-874. '

5.3.7 Remove cap and slowly open IA-370. Allow the pressure to i

bleed off. '

5.3.8 When the air at IA-370 has bled off, record pressure from the test gauge on the attached test data sheet. Record pressure every 10 minutes for one hour or until pressure decreases by  !

>5 psig. Reccrd the final time and pressure.

5.3.9 Shut IA-370 and' replace cap.  !

O

[U '

, Page,5 of14 . REFERENCE USE 9 9

NUCLEAR POWER BUSINESS UNIT IT 385 INSERVICE TESTS MAJOR Revision 7 PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997 (QUARTERLY)

UNIT 2 _._ _

_ INITIALS 5.3.10 Shut IA-371 and remove test gauge.

NOTE: Ifcontainment integrity is set, do not allow the T-ring pressure to decrease below 65psig on the installedgauge If pressure reaches 70psig, immediately shut IA-371 vent valve, open IA-874, and contact the DSSfor direction. Do not continue with this test.

5.3.11 Open IA-371 and bleed accumulator pressure to between 80 psig and 75 psig. Record pressure on the attached data sheet.

5.3.12 Open IA-874 and repressurize the system. Verify that T-ring pressure on the normally installed gauge returns to within 4 psi of the initial pressure in Step 5.3.1. Record final T-ring pressure on the attached test data sheet.

5.3.13 Replace cap on IA-371.

l PMT 5.3.14 SNOOP check the vent line caps. Repair any leaks as necessary.

5.3.15 Check valve's operability by comparing the data with the limits in Pump and Valve IST Program Acceptance Criteria.

5.3.16 Perform independent valve verification of Section' 5.6.

  • CAUTIONa DO NOT PERFORM SECTION 5.4 IF RCS TEMPERATURE IS GREATER THAN 200*F.

5.4 Test ofIA-1401: 2VNPSE-3245 Inner Purge Supply Accumulator Check '

Valve 5.4.1 Record initial T-ring pressure from the normally installed gauge.

Psig 5.4.2 Install the test gauge in the vent line at IA-1404.

5.4.3 Open IA-1404. O

' . Page 6 of14 REFERENCE USE

NUCLEAR POWER BUSINESS UNIT IT 385  :

INSERVICE TESTS MAJOR Revision 7 j PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997  !

O (QUARTERLY) i UNIT 2 l

5 INITIALS i t

5.4.4 Record test gauge pressure. psig  !

5.4.5 Isolate instrument air to the purge valve by shutting IA-1359.

i 5.4.6 Monitor the pressure on the test gauge. If pressure is visibly decreasing, reestablish instrument air to the valve and check for leaks. Once leaks are repaired, or if no leaks exist, continue with test. Note any leaks in the remarks section. i NOTE: Ifcontainment integrity is set, do not allow the T-ring supply i pressure to decrease below 65psig on the test gauge. If pressur: reaches 70psig, immediately shut M-1403 and i reopen M-1339.

5.4.7 Remove cap and slowly open IA-1403. Allow the pressure to bleed off.

g 5.4.8 When the air at IA-1403 has bled off, record pressure from the tg test gauge on the attached test data sheet. Record pressure every 10 minutes for one hour or until pressure decreases by

>5 psig. Record the final time and pressure.

5.4.9 Shut IA-1403 and replace cap.

5.4.10 Shut IA-1404 and remove test gauge.

NOTE: ifcontainment integrity is set, do not allow the T-ring

)

  • pressure to decrease below 65psig on the installedgauge, if

, pressure reaches 70psig, immediately shut M-1404 unt vein, open M-1339 and contact the DSSfor direction. Do i

not continue with this test 5.4.11 Open IA-1404 and bleed accumulated pressure to between

~~

80 psig and 75 psig. Record pressure on the attached test data sheet.

J

!O .

Page 7 of14 4

REFERENCE USE

. 4

NUCLEAR POWER BUSINESS UNIT IT 385 INSERVICE TESTS MAJOR Revision 7 PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997 (QUARTERLY)

UNIT 2 INITIALS 5.4.12 Open IA-1359 and repressurize the system. Verify that T-ring pressure on the normally installed gauge returns to within 4 psi of the initial pressure in Step 5.4.1. Record final T-ring pressure on the attached test data sheet.

5.4.13 Replace cap on IA-1404.

l PMT 5.4.14 SNOOP check the vent line caps. Repair any leaks as necessary.

5.4.15 Check the valve's operability by comparing the data with the ,

limits in Pump and Valve IST Program Acceptance Criteria. l 5.4.16 Perform independent valve verification of Section 5.6.

  • CAUTIONa DO NOT PERFORM SECTION 5.5 IF RCS TEMPERATURE IS GREATER THAN 200 F.

5.5 Test ofIA-1402: 2VNPSE-3213 Inner Purge Exhaust Accumulator Check Valve:

5.5.1 Record initial T-ring pressure from the normally installed gauge. I psig 5.5.2 Install the test gauge in the vent line at IA-1406.

5.5.3 Open IA-1406.

5.5.4 Record test gauge pressure. psig _

5.5.5 Isolate instrument air to the purge valve by shutting IA-1360. .

5.5.6 Monitor the pressure on the test gauge. If pressure is visibly decreasing, reestablish instrument air to the valve and check for leaks. Once leaks are repaired, or ifno leaks exist, continue with test. Note any leaks in the remarks section.

O Page 8 of14 REFERENCE USE

NUCLEAR POWER BUSINESS UNIT IT 385 INSERVICE TESTS MAJOR Revision 7 PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997 (QUARTERLY) y UNIT 2 INITIALS NOTE: Ifcontainment integrity is set, do not allow the T-ring supply pressure to decrease below 65psig on the testgauge if pressure reaches 70psig, immedsately shut M-1405 and reopen M-1360.

5.5.7 Remove cap and slowly open IA-1405. Allow the pressure to bleed off.

5.5.8 When the air at IA-1405 has bled off, record pressure from the test gauge on the attached test data sheet. Record pressure every 10 minutes for one hour or until pressure decreases by

>5 psig. Record the final time and pressure.

5.5.9 Shut IA-1405 and replace cap.

5.5.10 Shut IA-1406 and remove test gauge.

NOTE: Ifcontainment integrsity is set, do not allow the T-ring O ~~~-~~~'-~"<-'t pawssure reaches 70psig, immediately shut M-1406 vent valve, open M-1360, and contact the DSSfor direction. Do not continue with this test.

5.5.11 Open IA-1406 and bleed accumulator pressure tr between 80 psig and 75 psig. Record pressure on the attached test data sheet.

5.5.12 Open IA-1360 and repressurize the system. Verify that T-ring pressure on the normally installed gauge returns to within 4 psi .-

of the initial pressure in Step 5.5.1. Record final T-ring pressure on the attached test data sheet 5.5.13 Replace cap on IA-1406 '~

l IMI 5.5.14 SNOOP check the vent line caps. Repair any leaks as necessary.

5.5.15 Check the valve's operability by comparing the data with the limits in Pump and Valve IST Program Acceptance Criteria. .

,, ,, Page 9 of14 REFERENCE USE p .

NUCLEAR POWER BUSINESS UNIT IT 385 INSERVICE TESTS MAJOR Revision 7 PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997 l (QUARTERLY)

UNIT 2 INITIALS 5.5.16 Perform independent valve verification of Section 5.6.

NOTE: Independent valve venfication required onlyfor valves actually l testedper referenced test section.

5.6 Indeoendent Second Ooerator Verification POSITION INITIALS i l

NOTE: S& F means shut andflange, cap orplug installed.

5.6.1 2VNPSE-3212 Outer Purge Exhaust per Section 5.2 IA-875 2VNPSE-3212 operator and T-ring air supply OPEN 1 IA-373 Check valve downstream test conn. S&F

' l IA-372 Check valve upstream test conn. S&F l

5.6.2 2VNPSE-3244 Outer Purge Supply per Section 5.3 IA-874 2VNPSE-3244 cperator and T-ring air supply OPEN IA-371 Check valve downstream test conn. S&F IA-370 Check valve upstream test conn. S&F 5.6.3 2VNPSE-3245 Inner Purge Supply per Section 5.4 IA-1359 2VNPSE-3245 operator and T-ring air supply OPEN IA-1404 Check valve downstream test conn. S&F IA-1403 Check valve upstream test conn. S&F -

5.6.4 2VNPSE-3213 Inner Purge Exhaust per Section 5.5 ~

IA-1360 1VNPSE-3213 operator and T-ring air supply OPEN IA-1406 Check valve downstream test conn. S&F IA-1405 Check valve upstream test conn. S&F Page 10 of 14 REFERENCE USE l .

NUCLEAR POWER BUSINESS UNIT IT 385 INSERVICE TESTS MAJOR Revision 7 PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997 m (QUARTERLY)

UNIT 2 INITIALS 5.7 Perform TS-36 for the associated purge supply or exhaust line, if required.

Reference P&L 3.2 6.0 ANALYSIS TO BE COMPLETED WITHIN 96 HOURS BY MANAGER -

OPERATIONS OR HIS REPRESENTATIVE.

6.1 Comparisons with allowable ranges of test values and analysis of deviations complete.

6.2 Any requirements for corrective action?

Yes No (Ifyes, give details in the remarks section.)

6.3 Data analyzed by Time and date Remarks-1

]

Page11of14 REFERENCE USE.

e

NUCLEAR POWER BUSINESS UNIT IT 385 INSERVICE TESTS MAJOR Revision 7 PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997 (QUARTERLY)

UNIT 2 Outer Valve Test Data Sheet Isst ofIA-877: 2VNPSE-3212 Outer Purge Exhaust Accumulator Check Valve

1. System Lgak Teg Ambient Air Temperature F Pressure Time Pressure Time
2. Check Valve Stroke Test Final T-ring pressure in Step 5.2.12 Reduced T-ring pressure in Step 5.2.11 psig psig W l Pressure differential (final-reduced) psid I.est oflA-876 2VNPSE-3244 Outer Purge Sunoly Accumulator Check Valve l
1. System Leak Test Ambient Air Temperature F Pressure __ Time Pressure ... Time
2. Check Valve Stroke Test Final T-ring pressure in Step 5.3:12 psig Reduced T-ring pressure in Step 5.3.11 Pressure differential (final-reduced) psig psid g Page 12 of 14 REFERENCE USE

NUCLEAR POWER BUSINESS UNIT IT 385 INSERVICE TESTS MAJOR Revision 7 PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997 (QUARTERLY)

(]

g m2 Inner Valve Test Data Sheet Test oflA-1401: 2VNPSE-3245 Inner Purge Sucolv Accumulator Check Valve

1. System Leak Test Ambient Air Temperature F Pressure Time Pressure Time
2. Check Valve Stroke Test Final T-ring pressure in Step 5.4.12 psig i Reduced T-ring pressure in Step 5.4.11 psig Pressure differential (final-reduced) psid I. est oflA-1402 2VNPSE-3213 Inner Purge Exhaust Accumulator Check Valve
1. System Leak Test Ambient Air Temperature *F Pressure Time Pressure Time
2. Check Valve Stroke Test -

Final T-ring pressure in Step 5.5.12 psig Reduced T-ring pressure in Step 5.5.11 psig D Pressure differential (final-reduced)

J psid Page 13 of14 REFERENCE USE m

NUCLEAR POWER BUSINESS UNIT IT 385 INSERVICE TESTS MAJOR Revision 7 PURGE VALVE AIR SYSTEM CHECK VALVE January 31,1997 (QUARTERLY)

UNIT 2 l Figure 1

, 11 ,r s-(E i L Web *H I

i

~

~

E b g! N

{

!!E3 5

!lg I

W g 30

< 5 i

=

x .

= i

! u 1 m g

.e gl y 4 e r y,N 1 d  ! t_ s E .

[

t W (Y - i h-E lI i

95 8  !

i gl

!!llii i!NFl 'l a+._n <____x ___ 1 r

q a -

1 1

1 -

.[ mm

, , N!

I u

l' .

. e Page 14 of 14 REFERENCE USE 9