Forwards IE Inspec Repts#50-413/78-11 & 50-414/78-10 on 781031-1103 During Which No Items of Noncompliance Were Noted
ML20147E395
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/30/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML20147E387 List:
References
NUDOCS 7812210061
Download: ML20147E395 (2)


Text

, . . . _ .. .. ' UNITED STATES en Ric oq(o NUCLEAR REGULATORY COMMISSION

[ g R EGloN 11

{*

3 .. *

g r 101 MARIETTA STREET, o ~[ ATLANT A. GEORGI A 30303 I

  • % * * * * * / NOV 3 01978 In Reply Refer To:

RII:CRM 50-413/78-11 50-414/78-10

.

.

Duke Power Company ATTN: .Mr. L. C. Dail, Vice President Design Engineering Post Office Box 33189 Charlotte, North Carolina 28242 Gentlemen:

This refers to the inspection conducted by Messrs. C. R. McFarland and J. J. Blake of this office on October 31 through November 3, 1978, of activities authorized by NRC License Numbers CPPR-116 and CPPR-117 for the Catawba Nuclear Station facility, Units 1 and 2 and to the discussions of our findings held with Mr. W. H. Bradley in the Charlotte offices, and Mr. D. L. Freeze at the site, at the conclusion of the inspectio i Areas examined during the inspection and our findings are discussed in I the enclosed inspection report. Within these areas, the inspection ,

consisted of selective examinations of procedures and representative l records, interviews with personnel, and observations by the inspector i l

I Within the scope of this inspection, no items of noncompliance were .]

disclosed.

l In acco'rdance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or )

your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold l such information f rom public disclosure. Any such application must

!

include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document, If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Roo M l

,

.

.

NOV 3 01978

.

Duke Power Company -2- 4

!

.

Should you have any questions concerning this letter, we will be glad to discuss them with yo

Sincerely,

,

'

Charles E. Murphy, Chief Reactor Construction and

~

Engineering Support Branch Enclosures:

Inspection Report Numbers 50-413/78-11 and 50-414/78-10 cc w/ enclosures:

Mr. D. G. Beam, Project Manager Catawba Nuclear Station Post Office Box 223 Clover, South Carolina 29710 i

i e

f J