Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2
ML20111B013
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/31/1996
From: Shannon Rogers
GEORGIA POWER CO.
To:
Shared Package
ML20111A997 List:
References
NUDOCS 9605140134
Download: ML20111B013 (2)


Text

f 9

Enclosure 3 i

Revised Page E2-4 j for l

Plant Hatch Unit 2 J

i Monthly Operating Report i l

March 1996 l l

l l \

l l l

l i l

l l

I i

l l

l l

1 l i l

\ l

! i I

i 9605140134 960510 PDR ADOCK 05000321 l R PDR l

!!I 5164

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-366 DATE: APRIL 3, 1996 UNIT NAME: E. I. HATCH - UNIT TWO COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: MARCH 1996 R M S l E E Y l T A T LICENSEE SC Y S H EVENT T0 COMPGNENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME PREVENT RECURRENCE (SUBC00E) 1 96-003 960312 S 82.7 A 2 N/A CC VALVEX The unit was manually (X) scrammed to replace Main i

(B) Steam Line SRVs "D" and "H".

Main Steam Line SRVs "D" and "H" were replaced and the unit was returned, to rated thermal power.

l l

l TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%

F-FORCED A EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.

D-REGULATORY RESTRICTION 4-CONTINUATIONS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN)

G-0PERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN) 1 E2-4 l

_ _ _ _ _ _ _ _ _ _ _ _ _ _