Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20210U4531999-08-12012 August 1999 Comment Opposing Proposed Rule 10CFR50 Re Consideration of Potassium Iodide (Ki) in Emergency Plans.Urges NRC to Retain Current Policy for Ki Usage GO2-97-089, Comment Supporting Proposed Rule 10CFR73 Re Changes to Power Plant Security Requirements1997-05-0707 May 1997 Comment Supporting Proposed Rule 10CFR73 Re Changes to Power Plant Security Requirements ML17292A7151997-02-25025 February 1997 Comment Supporting Proposed Generic Communications, Effectiviness of Ultrasonic Testing Sys in ISI Program. ML20134L3351997-02-14014 February 1997 Order Imposing Civil Monetary Penalty Re Licensee Activities Conducted from 960628-960904 ML17291A9101995-07-0707 July 1995 Comment on Review of NRC Insp Rept Content,Format & Style. NRC Insp Repts Should Provide Balanced Perspective, Reflecting Licensee Strengths & Positive Aspects of Programs & Activities Reviewed GO2-95-080, Comment on Proposed GL, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Util Believes That Ability to Justify Actuator Capability by Analysis Should Not Be Restricted to Population of Small Valves1995-04-26026 April 1995 Comment on Proposed GL, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Util Believes That Ability to Justify Actuator Capability by Analysis Should Not Be Restricted to Population of Small Valves GO2-94-187, Comment Opposing Proposed Rule 10CFR26 Re Consideration of Changes to FFD Requirements1994-08-0808 August 1994 Comment Opposing Proposed Rule 10CFR26 Re Consideration of Changes to FFD Requirements ML20058L9561993-07-26026 July 1993 Decommissioning Trust,Consisting of Asset Summary for Period Ending 930630,asset Summary Adjusted for Accurals for Period Ending 930630 & List of Assets as of 930630 ML20045D7551993-06-18018 June 1993 Comment on Proposed Rule 10CFR26 Re Mods to fitness-for-duty Program Requirements.Supports Rule W/Listed Exceptions ML20044E1511993-05-30030 May 1993 Comment Supporting Petition for Rulemaking PRM-50-58 Re VEPCO Petition to Change Frequency of Emergency Planning Exercises from Annual to Biennial ML17290A3901993-05-21021 May 1993 Comments on Proposed Insp Procedure 38703, Commercial Grade Procurement Insp. ML17289A9151992-10-0909 October 1992 Comment on Proposed Changes to SALP Program.Util Supports Comments Being Filed by NUMARC & Legal Firm of Winston & Strawn GO2-92-164, Comment on Proposed Rule 10CFR50 Re Loss of All Alternating Current Power & Draft Reg Guide 1.9,task DG-1021.Supports Detailed Comments Submitted by Numarc,As Representing Licensee Views1992-07-10010 July 1992 Comment on Proposed Rule 10CFR50 Re Loss of All Alternating Current Power & Draft Reg Guide 1.9,task DG-1021.Supports Detailed Comments Submitted by Numarc,As Representing Licensee Views GO2-92-136, Comment Supporting Proposed Rules 10CFR19 & 20 Re Extension of Implementation Date Concerning 10CFR201992-06-0404 June 1992 Comment Supporting Proposed Rules 10CFR19 & 20 Re Extension of Implementation Date Concerning 10CFR20 ML20091D1631992-04-0303 April 1992 Comment Opposing Proposed Rule 10CFR2 Re Policy & Procedure for Enforcement Actions.Concerned That Policy Seems to Be Creating New Requirements Through Examples Given ML20091Q8661992-01-31031 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys,10CFR50.72 & 50.73,Clarification of NRC Sys & Guidelines for Reporting ML17289A2931992-01-24024 January 1992 Comment on Draft Reg Guide Task DG-8007 (Proposed Rev 1 to Reg Guide 8.7) Re Instructions for Recording & Reporting Occupational Radiation Exposure Data ML17289A2541992-01-0606 January 1992 Comment on Draft Reg Guide Task DG-8004 Re Radiation Protection Programs.Reg Guide Provides Good Guidance for Maintaining Effective Radiation Protection Programs Aimed at Achieving Occupational Doses That Are ALARA GO2-91-103, Comment Opposing Proposed Rules 10CFR71,170 & 171, Rev of Fee Schedules;100% Fee Recovery1991-05-16016 May 1991 Comment Opposing Proposed Rules 10CFR71,170 & 171, Rev of Fee Schedules;100% Fee Recovery GO2-90-181, Comment Opposing Proposed Rule 10CFR26 Re fitness-for-duty. Rev Would Restrict Licensee from Taking Appropriate Action on Preliminary Positive Test1990-10-30030 October 1990 Comment Opposing Proposed Rule 10CFR26 Re fitness-for-duty. Rev Would Restrict Licensee from Taking Appropriate Action on Preliminary Positive Test ML17285B3701990-07-0505 July 1990 Comment Supporting Petition for Rulemaking PRM-50-55 Re Frequency of FSAR Revs,Per 10CFR50.71(e)(4) Requirements ML20011E4861990-02-0707 February 1990 Comment on Proposed Rule 10CFR71 Re Compatibility of Pu Air Transport Regulations W/Iaea Stds.Supports EEI-UWASTE/NUMARC Comments to Be Provided to NRC by 900209 ML20248D2831989-09-28028 September 1989 Notice of Appearance.* Advises That Author Will Enter Appearance in Proceeding on Behalf of Nrc.W/Certificate of Svc ML20247Q2661989-09-26026 September 1989 Establishment of Aslb.* Board Will Comprise of Mb Margulies, Chairman & Oh Paris & Fj Shon,Members.W/Certificate of Svc. Served on 890926 B13367, Comment on Proposed Rules 10CFR30,40,50,60,70,72 & 150 Re Preserving Free Flow of Info to Commission.Nrc Made Wise Choice to Not Impose Any Obligation on Private Parties to Include Affirmative Statement in Employment Agreements1989-09-20020 September 1989 Comment on Proposed Rules 10CFR30,40,50,60,70,72 & 150 Re Preserving Free Flow of Info to Commission.Nrc Made Wise Choice to Not Impose Any Obligation on Private Parties to Include Affirmative Statement in Employment Agreements ML20248C8751989-09-13013 September 1989 Response to Order Modifying Licenses & Order to Show Cause Why Licenses Should Not Be Revoked.* Requests Hearing on Issues,Including Funds for Equipment.Supporting Info Encl ML20246C7141989-08-18018 August 1989 Order to Show Cause Why CPs CPEP-1 & CPEP-2 Should Not Be Revoked & Requiring Licensee to Notify Commission at Least 30 Days Before Taking Possession of Any Classified Equipment ML20245G0721989-08-0303 August 1989 Comment on Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Reactors. Recommends That NRC Recommendation on Trust Agreement Wording Be Deleted or NRC Should Grandfather Existing Trusts Such as for Plants ML20248B6201989-08-0202 August 1989 Comments on Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Reactors. NRC Should Permit Use of Potential Tax Refund as Source of Decommissioning Funds ELV-00674, Comment Opposing Proposed Rules 10CFR50,72 & 170 Re Storage of Spent Nuclear Fuel in NRC-Approved Storage Casks at Nuclear Power Reactor Sites. 10CFR72.6(c) Should Be Revised to Provide for Storage W/O ISFSI Requirement1989-07-0707 July 1989 Comment Opposing Proposed Rules 10CFR50,72 & 170 Re Storage of Spent Nuclear Fuel in NRC-Approved Storage Casks at Nuclear Power Reactor Sites. 10CFR72.6(c) Should Be Revised to Provide for Storage W/O ISFSI Requirement GO2-89-115, Comment Supporting Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Plant Structures,Sys & Components. Util Accepts NUMARC Comments1989-07-0606 July 1989 Comment Supporting Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Plant Structures,Sys & Components. Util Accepts NUMARC Comments ML20246K4801989-07-0505 July 1989 Comment Opposing Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Structures,Sys & Components ELV-00679, Comment on Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Structures,Sys & Components. Agrees W/Numarc Comments Provided to NRC on 8906261989-07-0505 July 1989 Comment on Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Structures,Sys & Components. Agrees W/Numarc Comments Provided to NRC on 890626 ML20246D8811989-06-30030 June 1989 Comment Supporting Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Structures,Sys & Components ML20245D2481989-06-16016 June 1989 Comment on Proposed Rules 10CFR50,72 & 170 Re Storage of Spent Nuclear Fuel in NRC-Approved Storage Casks at Nuclear Power Reactor Sites. NRC Must Consider Provision in Rule to Permit Indiscriminate Storage of Spent Fuel at Reactors ML20246Q2971989-05-15015 May 1989 Comment Opposing Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20245J0191989-04-14014 April 1989 Comment Re Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20244B3241989-04-10010 April 1989 Comment Opposing Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20247A2971989-04-0404 April 1989 Comment Supporting Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20246M2771989-03-20020 March 1989 Decision.* Affirms Board Decision LBP-89-05 Granting CP & OL to Licensee.Certificate of Svc Encl.Served on 890321 ML20236B4641989-03-0808 March 1989 Comments on Proposed Rev 3 to Reg Guide 1.9, Selection, Design,Qualification,Testing & Reliability of Diesel Generator Units Used as Onsite Electric Power Sys at Nuclear Power Plants. Reg Guide Does Not Provide Flexibility ML20246N9471989-03-0808 March 1989 Comment on Proposed Rev 3 to Reg Guide 1.9 Re Selection Design,Qualification,Testing & Reliability of Diesel Generator Units Used as Onsite Electric Power Sys at Nuclear Power Plants B13113, Comment on Proposed Rev 3 to Reg Guide 1.9, Selection, Design,Qualification,Testing & Reliability of Diesel Generator Units.... Util Recommends Rule Be Revised to Incorporate Addl Flexibility in Considering Age of Diesel1989-03-0808 March 1989 Comment on Proposed Rev 3 to Reg Guide 1.9, Selection, Design,Qualification,Testing & Reliability of Diesel Generator Units.... Util Recommends Rule Be Revised to Incorporate Addl Flexibility in Considering Age of Diesel JPN-89-008, Comment Opposing Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants1989-02-27027 February 1989 Comment Opposing Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20235T3581989-02-27027 February 1989 Comment Opposing Proposed Rule 10CFR50 Re Maint Programs for Nuclear Power Plants.Util Endorses Comments Filed by NUMARC & Nuclear Util Backfitting & Reform Group.Rule Fails to Provide Basis for Determining Effective Maint Program B13136, Comment Opposing Proposed Rule 10CFR50 Re Effectiveness of Maint Programs for Nuclear Power Plants.Proposed Rule on Maint Will Not Improve Maint in Plants Nor Improve Safety or Reliability of Plants.Proposed Rule Much Too Vague1989-02-27027 February 1989 Comment Opposing Proposed Rule 10CFR50 Re Effectiveness of Maint Programs for Nuclear Power Plants.Proposed Rule on Maint Will Not Improve Maint in Plants Nor Improve Safety or Reliability of Plants.Proposed Rule Much Too Vague ML20235V8541989-02-27027 February 1989 Comment Opposing Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants. Util Committed to Goal of Achieving Improved Reliability & Safety Through Better Maint ML20235T1861989-02-24024 February 1989 Comment Supporting Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants, Extension of NRC Authority to BOP Portion of Plant & Misapplication of Adequate Protection Std of Backfit Rule ML20235T7391989-02-23023 February 1989 Comment Opposing Proposed Rules 10CFR50 & 55 Re Educ & Experience Requirements for Senior Reactor Operators & Supervisors at Nuclear Power Plants ML20235N8531989-02-14014 February 1989 Comment Supporting Chapter 1 Re Policy Statement on Exemptions Below Regulatory Concern.Policy Development for Criteria for Release of Radioactive Matl Needed for Development of Consistent Waste Mgt Practices 1999-08-12
[Table view] Category:TRANSCRIPTS
MONTHYEARML20247R4091988-12-31031 December 1988 Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196A5991988-12-0101 December 1988 Transcript of 881201 Hearing in Bethesda,Md.Pp 143-152 ML20206J3701988-11-21021 November 1988 Transcript of 881121 Telcon in Bethesda,Md Re Alchemie. Pp 70-100 ML20206C0851988-11-0909 November 1988 Transcript of ASLB 881109 Telcon in Bethesda,Md.Pp 44-69 ML20205R7111988-11-0404 November 1988 NRC Staff Testimony of Jj Swift Addressing ASLB Inquiries Dtd 881018.* Supporting Info Encl.Related Correspondence ML20151M8991988-07-21021 July 1988 Transcript of 880721 Prehearing Conference in Knoxville,Tn. Pp 1-43 ML20196G0621988-06-21021 June 1988 Transcript of TVA 880621 Briefing in Bethesda,Md Re Util Reorganization & Plant Status ML20154C7511988-05-0404 May 1988 Transcript of 880504 Annual Briefing on State of Nuclear Industry in Rockville,Md.Pp 1-60. Introductory Remarks, State of Industry Rept & Status Rept on Util Research... Encl.Served on 880509 ML20213F6861986-11-0707 November 1986 Transcript of Commission 861107 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-325A Concerning Perry Unit 1 OL & SECY-86-292A Concerning Order Re Dispute Between ASLB & Ofc of Investigations in Braidwood OL Hearing.Pp 1-4 ML20215K9781986-09-26026 September 1986 Limited Appearance Statement in Proceeding.Compares Shoreham W/Chernobyl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20203G3571986-07-24024 July 1986 Transcript of Commission 860724 Affirmation/Discussion & Vote in Washington,Dc Re TMI-2 Leak Rate Data Falsification & ALAB-836.Pp 1-6 ML20205J5191986-02-13013 February 1986 Transcript of Commission 860213 Affirmation/Discussion & Vote in Washington,Dc on SECY-86-31 Re Request for Reconsideration of TMI-2 Leak Rate Proceeding & Order on Shoreham.Pp 1-3 ML20137R9531986-02-0707 February 1986 Transcript of Commission 860207 Briefing in Washington,Dc on Staff Activities Re Tva.Pp 1-75 NUREG-1190, Transcript of Commission 860122 Briefing in Washington,Dc Re San Onofre & Status of Rancho Seco.Pp 1-105.Supporting Documentation & NUREG-1190, Loss of Power & Water Hammer Event at San Onofre,Unit 1 on 851121 Encl1986-01-22022 January 1986 Transcript of Commission 860122 Briefing in Washington,Dc Re San Onofre & Status of Rancho Seco.Pp 1-105.Supporting Documentation & NUREG-1190, Loss of Power & Water Hammer Event at San Onofre,Unit 1 on 851121 Encl ML20155H9111986-01-0606 January 1986 Transcript of J Jones 860106 Interview in Herald,Ca.Pp 1-12 ML20155H8941986-01-0606 January 1986 Transcript of 860106 Discussions W/B Daniels & B Dieterich in Herald,Ca.Pp 1-79.Supporting Documentation Encl ML20155H8411986-01-0404 January 1986 Transcript of Brock 860104 Interview in Herald,Ca.Pp 1-42 ML20155H7981985-12-31031 December 1985 Transcript of D Whitney 851231 Exam in Herald,Ca.Pp 1-52 ML20155H7741985-12-31031 December 1985 Transcript of DD Whitney & G Coward Exam in Herald,Ca.Pp 1-116.Supporting Documentation Encl ML20155H7421985-12-30030 December 1985 Transcript of DD Whitney 851230 Exam in Herald,Ca.Pp 1-39 ML20155H7261985-12-30030 December 1985 Transcript of M Peterson & D Jenks 851230 Exam in Herald,Ca. Pp 1-47 ML20155H7201985-12-29029 December 1985 Transcript of G Simmons 851229 Exam in Herald,Ca.Pp 1-82 ML20138P8591985-12-18018 December 1985 Transcript of Commission 851218 Affirmation/Discussion & Vote in Washington,Dc on SECY-85-391 Re ASLB Decision on Shoreham & SECY-85-241(A) on TMI-2 Leak Rate Falsification. Pp 1-5 ML20138K0661985-12-12012 December 1985 Transcript of 851212 Affirmation/Discussion & Vote in Washington,Dc Re SECY-85-367A on Palo Verde 1 Leaseback & SECY-85-371 on Refund on Black Fox License Fee.Pp 1-4 ML20137R8771985-11-26026 November 1985 Transcript of 851126 Affirmation/Discussion & Vote in Washington,Dc Re Extension of Environ Qualification Deadline for Fort St Vrain & Pilgrim.Pp 1-5 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 ML20198E3301985-11-0505 November 1985 Transcript of ACRS Subcommittee on Cessar/Palo Verde Nuclear Generating Station 851105 Meeting in Washington,Dc.Pp 1-326. Supporting Documentation Encl ML20138M8711985-10-25025 October 1985 Transcript of 851025 Meeting in Washington,Dc Re Util Requests for Exemption from Environ Qualification.Pp 1-76 ML20136G3881985-10-17017 October 1985 Transcript of 851017 Public Meeting in Glen Ellyn,Il W/Z Reytblatt Re Containment Leak Rates.Pp 1-135.Supporting Documentation Encl ML20141H0991985-07-10010 July 1985 Testimony of Nj Palladino to Subcommittee on Energy Conservation & Power,Committee on Energy & Commerce,Us House of Representatives on Facility Licensing Process ML20133C5201985-06-26026 June 1985 Undated Testimony of PM Reep Re Welding Inspector Concerns. Rept of Verbal Harassment Encl ML20137X5031985-06-25025 June 1985 Testimony of Hs Phillips Re Discovery of Quadrex Rept. Related Info Encl ML20137X5111985-06-21021 June 1985 Testimony of Hs Phillips Re Util Sys for Reporting Design & Const Deficiencies ML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20199A5431985-06-10010 June 1985 Partially Withheld Testimony of Wj Collins Re Welding Fabrication Concerns ML20147E7391985-05-0808 May 1985 Partially Deleted Transcript of 850508 Investigative Interview of Nc Kazanas in Parsippany,Nj.Pp 1-45 ML20147E7261985-05-0808 May 1985 Partially Deleted Transcript of 850508 Investigative Interview of Mj Stromberg in Parsippany,Nj.Pp 1-23 ML20147E6191985-05-0808 May 1985 Transcript of 850508 Investigative Interview of Rl Long in Parsippany,Nj.Pp 1-20 ML20147E5441985-05-0808 May 1985 Transcript of 850508 Investigative Interview of Pr Clark in Parsippany,Nj.Pp 1-26 ML20147E6551985-05-0202 May 1985 Partially Deleted Transcript of 850502 Investigative Interview of Ba Bader.Pp 1-45 ML20147E6001985-05-0202 May 1985 Transcript of 850502 Investigative Interview of Pb Magitz in Parsippany,Nj.Pp 1-40 ML20147E5171985-05-0202 May 1985 Transcript of 850502 Investigative Interview of Bw Alatary in Parsippany,Nj.Pp 1-15.Marked-up 841107 & 19 Press Releases Also Encl ML20147E8441985-05-0101 May 1985 Partially Deleted Transcript of 850501 Investigative Interview of Dk Croneberger in Parsippany,Nj.Pp 1-44 ML20147E6691985-05-0101 May 1985 Partially Deleted Transcript of 850501 Investigative Interview of Rf Wilson in Parsippany,Nj.Pp 1-44 ML20147E8211985-04-25025 April 1985 Partially Deleted Transcript of 850425 Investigative Interview of Rj Chisolm in Parsippany,Nj.Pp 1-45 ML20147E7581985-04-25025 April 1985 Partially Deleted Transcript of 850425 Investigative Interview of Fg Maus.Pp 1-81 ML20147E5611985-04-25025 April 1985 Transcript of 850425 Investigative Interview of Js Wetmore in Parsippany,Nj.Pp 1-17 ML20147E7151985-04-24024 April 1985 Partially Deleted Transcript of 850404 Investigative Interview of Rj Guimond in Parsippany,Nj.Pp 1-46 ML20147E6291985-04-24024 April 1985 Transcript of 850424 Investigative Interview of P Boucher in Parsippany,Nj.Pp 1-52 1988-07-21
[Table view] Category:DEPOSITIONS
MONTHYEARML20247R4091988-12-31031 December 1988 Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196A5991988-12-0101 December 1988 Transcript of 881201 Hearing in Bethesda,Md.Pp 143-152 ML20206J3701988-11-21021 November 1988 Transcript of 881121 Telcon in Bethesda,Md Re Alchemie. Pp 70-100 ML20206C0851988-11-0909 November 1988 Transcript of ASLB 881109 Telcon in Bethesda,Md.Pp 44-69 ML20205R7111988-11-0404 November 1988 NRC Staff Testimony of Jj Swift Addressing ASLB Inquiries Dtd 881018.* Supporting Info Encl.Related Correspondence ML20151M8991988-07-21021 July 1988 Transcript of 880721 Prehearing Conference in Knoxville,Tn. Pp 1-43 ML20196G0621988-06-21021 June 1988 Transcript of TVA 880621 Briefing in Bethesda,Md Re Util Reorganization & Plant Status ML20154C7511988-05-0404 May 1988 Transcript of 880504 Annual Briefing on State of Nuclear Industry in Rockville,Md.Pp 1-60. Introductory Remarks, State of Industry Rept & Status Rept on Util Research... Encl.Served on 880509 ML20213F6861986-11-0707 November 1986 Transcript of Commission 861107 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-325A Concerning Perry Unit 1 OL & SECY-86-292A Concerning Order Re Dispute Between ASLB & Ofc of Investigations in Braidwood OL Hearing.Pp 1-4 ML20215K9781986-09-26026 September 1986 Limited Appearance Statement in Proceeding.Compares Shoreham W/Chernobyl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20203G3571986-07-24024 July 1986 Transcript of Commission 860724 Affirmation/Discussion & Vote in Washington,Dc Re TMI-2 Leak Rate Data Falsification & ALAB-836.Pp 1-6 ML20205J5191986-02-13013 February 1986 Transcript of Commission 860213 Affirmation/Discussion & Vote in Washington,Dc on SECY-86-31 Re Request for Reconsideration of TMI-2 Leak Rate Proceeding & Order on Shoreham.Pp 1-3 ML20137R9531986-02-0707 February 1986 Transcript of Commission 860207 Briefing in Washington,Dc on Staff Activities Re Tva.Pp 1-75 NUREG-1190, Transcript of Commission 860122 Briefing in Washington,Dc Re San Onofre & Status of Rancho Seco.Pp 1-105.Supporting Documentation & NUREG-1190, Loss of Power & Water Hammer Event at San Onofre,Unit 1 on 851121 Encl1986-01-22022 January 1986 Transcript of Commission 860122 Briefing in Washington,Dc Re San Onofre & Status of Rancho Seco.Pp 1-105.Supporting Documentation & NUREG-1190, Loss of Power & Water Hammer Event at San Onofre,Unit 1 on 851121 Encl ML20155H9111986-01-0606 January 1986 Transcript of J Jones 860106 Interview in Herald,Ca.Pp 1-12 ML20155H8941986-01-0606 January 1986 Transcript of 860106 Discussions W/B Daniels & B Dieterich in Herald,Ca.Pp 1-79.Supporting Documentation Encl ML20155H8411986-01-0404 January 1986 Transcript of Brock 860104 Interview in Herald,Ca.Pp 1-42 ML20155H7981985-12-31031 December 1985 Transcript of D Whitney 851231 Exam in Herald,Ca.Pp 1-52 ML20155H7741985-12-31031 December 1985 Transcript of DD Whitney & G Coward Exam in Herald,Ca.Pp 1-116.Supporting Documentation Encl ML20155H7421985-12-30030 December 1985 Transcript of DD Whitney 851230 Exam in Herald,Ca.Pp 1-39 ML20155H7261985-12-30030 December 1985 Transcript of M Peterson & D Jenks 851230 Exam in Herald,Ca. Pp 1-47 ML20155H7201985-12-29029 December 1985 Transcript of G Simmons 851229 Exam in Herald,Ca.Pp 1-82 ML20138P8591985-12-18018 December 1985 Transcript of Commission 851218 Affirmation/Discussion & Vote in Washington,Dc on SECY-85-391 Re ASLB Decision on Shoreham & SECY-85-241(A) on TMI-2 Leak Rate Falsification. Pp 1-5 ML20138K0661985-12-12012 December 1985 Transcript of 851212 Affirmation/Discussion & Vote in Washington,Dc Re SECY-85-367A on Palo Verde 1 Leaseback & SECY-85-371 on Refund on Black Fox License Fee.Pp 1-4 ML20137R8771985-11-26026 November 1985 Transcript of 851126 Affirmation/Discussion & Vote in Washington,Dc Re Extension of Environ Qualification Deadline for Fort St Vrain & Pilgrim.Pp 1-5 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 ML20198E3301985-11-0505 November 1985 Transcript of ACRS Subcommittee on Cessar/Palo Verde Nuclear Generating Station 851105 Meeting in Washington,Dc.Pp 1-326. Supporting Documentation Encl ML20138M8711985-10-25025 October 1985 Transcript of 851025 Meeting in Washington,Dc Re Util Requests for Exemption from Environ Qualification.Pp 1-76 ML20136G3881985-10-17017 October 1985 Transcript of 851017 Public Meeting in Glen Ellyn,Il W/Z Reytblatt Re Containment Leak Rates.Pp 1-135.Supporting Documentation Encl ML20141H0991985-07-10010 July 1985 Testimony of Nj Palladino to Subcommittee on Energy Conservation & Power,Committee on Energy & Commerce,Us House of Representatives on Facility Licensing Process ML20133C5201985-06-26026 June 1985 Undated Testimony of PM Reep Re Welding Inspector Concerns. Rept of Verbal Harassment Encl ML20137X5031985-06-25025 June 1985 Testimony of Hs Phillips Re Discovery of Quadrex Rept. Related Info Encl ML20137X5111985-06-21021 June 1985 Testimony of Hs Phillips Re Util Sys for Reporting Design & Const Deficiencies ML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20199A5431985-06-10010 June 1985 Partially Withheld Testimony of Wj Collins Re Welding Fabrication Concerns ML20147E7391985-05-0808 May 1985 Partially Deleted Transcript of 850508 Investigative Interview of Nc Kazanas in Parsippany,Nj.Pp 1-45 ML20147E7261985-05-0808 May 1985 Partially Deleted Transcript of 850508 Investigative Interview of Mj Stromberg in Parsippany,Nj.Pp 1-23 ML20147E6191985-05-0808 May 1985 Transcript of 850508 Investigative Interview of Rl Long in Parsippany,Nj.Pp 1-20 ML20147E5441985-05-0808 May 1985 Transcript of 850508 Investigative Interview of Pr Clark in Parsippany,Nj.Pp 1-26 ML20147E6551985-05-0202 May 1985 Partially Deleted Transcript of 850502 Investigative Interview of Ba Bader.Pp 1-45 ML20147E6001985-05-0202 May 1985 Transcript of 850502 Investigative Interview of Pb Magitz in Parsippany,Nj.Pp 1-40 ML20147E5171985-05-0202 May 1985 Transcript of 850502 Investigative Interview of Bw Alatary in Parsippany,Nj.Pp 1-15.Marked-up 841107 & 19 Press Releases Also Encl ML20147E8441985-05-0101 May 1985 Partially Deleted Transcript of 850501 Investigative Interview of Dk Croneberger in Parsippany,Nj.Pp 1-44 ML20147E6691985-05-0101 May 1985 Partially Deleted Transcript of 850501 Investigative Interview of Rf Wilson in Parsippany,Nj.Pp 1-44 ML20147E8211985-04-25025 April 1985 Partially Deleted Transcript of 850425 Investigative Interview of Rj Chisolm in Parsippany,Nj.Pp 1-45 ML20147E7581985-04-25025 April 1985 Partially Deleted Transcript of 850425 Investigative Interview of Fg Maus.Pp 1-81 ML20147E5611985-04-25025 April 1985 Transcript of 850425 Investigative Interview of Js Wetmore in Parsippany,Nj.Pp 1-17 ML20147E7151985-04-24024 April 1985 Partially Deleted Transcript of 850404 Investigative Interview of Rj Guimond in Parsippany,Nj.Pp 1-46 ML20147E6291985-04-24024 April 1985 Transcript of 850424 Investigative Interview of P Boucher in Parsippany,Nj.Pp 1-52 1988-07-21
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20247R4091988-12-31031 December 1988 Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196A5991988-12-0101 December 1988 Transcript of 881201 Hearing in Bethesda,Md.Pp 143-152 ML20206J3701988-11-21021 November 1988 Transcript of 881121 Telcon in Bethesda,Md Re Alchemie. Pp 70-100 ML20206C0851988-11-0909 November 1988 Transcript of ASLB 881109 Telcon in Bethesda,Md.Pp 44-69 ML20205R7111988-11-0404 November 1988 NRC Staff Testimony of Jj Swift Addressing ASLB Inquiries Dtd 881018.* Supporting Info Encl.Related Correspondence ML20151M8991988-07-21021 July 1988 Transcript of 880721 Prehearing Conference in Knoxville,Tn. Pp 1-43 ML20196G0621988-06-21021 June 1988 Transcript of TVA 880621 Briefing in Bethesda,Md Re Util Reorganization & Plant Status ML20154C7511988-05-0404 May 1988 Transcript of 880504 Annual Briefing on State of Nuclear Industry in Rockville,Md.Pp 1-60. Introductory Remarks, State of Industry Rept & Status Rept on Util Research... Encl.Served on 880509 ML20213F6861986-11-0707 November 1986 Transcript of Commission 861107 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-325A Concerning Perry Unit 1 OL & SECY-86-292A Concerning Order Re Dispute Between ASLB & Ofc of Investigations in Braidwood OL Hearing.Pp 1-4 ML20215K9781986-09-26026 September 1986 Limited Appearance Statement in Proceeding.Compares Shoreham W/Chernobyl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20203G3571986-07-24024 July 1986 Transcript of Commission 860724 Affirmation/Discussion & Vote in Washington,Dc Re TMI-2 Leak Rate Data Falsification & ALAB-836.Pp 1-6 ML20205J5191986-02-13013 February 1986 Transcript of Commission 860213 Affirmation/Discussion & Vote in Washington,Dc on SECY-86-31 Re Request for Reconsideration of TMI-2 Leak Rate Proceeding & Order on Shoreham.Pp 1-3 ML20137R9531986-02-0707 February 1986 Transcript of Commission 860207 Briefing in Washington,Dc on Staff Activities Re Tva.Pp 1-75 NUREG-1190, Transcript of Commission 860122 Briefing in Washington,Dc Re San Onofre & Status of Rancho Seco.Pp 1-105.Supporting Documentation & NUREG-1190, Loss of Power & Water Hammer Event at San Onofre,Unit 1 on 851121 Encl1986-01-22022 January 1986 Transcript of Commission 860122 Briefing in Washington,Dc Re San Onofre & Status of Rancho Seco.Pp 1-105.Supporting Documentation & NUREG-1190, Loss of Power & Water Hammer Event at San Onofre,Unit 1 on 851121 Encl ML20155H9111986-01-0606 January 1986 Transcript of J Jones 860106 Interview in Herald,Ca.Pp 1-12 ML20155H8941986-01-0606 January 1986 Transcript of 860106 Discussions W/B Daniels & B Dieterich in Herald,Ca.Pp 1-79.Supporting Documentation Encl ML20155H8411986-01-0404 January 1986 Transcript of Brock 860104 Interview in Herald,Ca.Pp 1-42 ML20155H7981985-12-31031 December 1985 Transcript of D Whitney 851231 Exam in Herald,Ca.Pp 1-52 ML20155H7741985-12-31031 December 1985 Transcript of DD Whitney & G Coward Exam in Herald,Ca.Pp 1-116.Supporting Documentation Encl ML20155H7421985-12-30030 December 1985 Transcript of DD Whitney 851230 Exam in Herald,Ca.Pp 1-39 ML20155H7261985-12-30030 December 1985 Transcript of M Peterson & D Jenks 851230 Exam in Herald,Ca. Pp 1-47 ML20155H7201985-12-29029 December 1985 Transcript of G Simmons 851229 Exam in Herald,Ca.Pp 1-82 ML20138P8591985-12-18018 December 1985 Transcript of Commission 851218 Affirmation/Discussion & Vote in Washington,Dc on SECY-85-391 Re ASLB Decision on Shoreham & SECY-85-241(A) on TMI-2 Leak Rate Falsification. Pp 1-5 ML20138K0661985-12-12012 December 1985 Transcript of 851212 Affirmation/Discussion & Vote in Washington,Dc Re SECY-85-367A on Palo Verde 1 Leaseback & SECY-85-371 on Refund on Black Fox License Fee.Pp 1-4 ML20137R8771985-11-26026 November 1985 Transcript of 851126 Affirmation/Discussion & Vote in Washington,Dc Re Extension of Environ Qualification Deadline for Fort St Vrain & Pilgrim.Pp 1-5 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 ML20198E3301985-11-0505 November 1985 Transcript of ACRS Subcommittee on Cessar/Palo Verde Nuclear Generating Station 851105 Meeting in Washington,Dc.Pp 1-326. Supporting Documentation Encl ML20138M8711985-10-25025 October 1985 Transcript of 851025 Meeting in Washington,Dc Re Util Requests for Exemption from Environ Qualification.Pp 1-76 ML20136G3881985-10-17017 October 1985 Transcript of 851017 Public Meeting in Glen Ellyn,Il W/Z Reytblatt Re Containment Leak Rates.Pp 1-135.Supporting Documentation Encl ML20141H0991985-07-10010 July 1985 Testimony of Nj Palladino to Subcommittee on Energy Conservation & Power,Committee on Energy & Commerce,Us House of Representatives on Facility Licensing Process ML20133C5201985-06-26026 June 1985 Undated Testimony of PM Reep Re Welding Inspector Concerns. Rept of Verbal Harassment Encl ML20137X5031985-06-25025 June 1985 Testimony of Hs Phillips Re Discovery of Quadrex Rept. Related Info Encl ML20137X5111985-06-21021 June 1985 Testimony of Hs Phillips Re Util Sys for Reporting Design & Const Deficiencies ML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20199A5431985-06-10010 June 1985 Partially Withheld Testimony of Wj Collins Re Welding Fabrication Concerns ML20147E7391985-05-0808 May 1985 Partially Deleted Transcript of 850508 Investigative Interview of Nc Kazanas in Parsippany,Nj.Pp 1-45 ML20147E7261985-05-0808 May 1985 Partially Deleted Transcript of 850508 Investigative Interview of Mj Stromberg in Parsippany,Nj.Pp 1-23 ML20147E6191985-05-0808 May 1985 Transcript of 850508 Investigative Interview of Rl Long in Parsippany,Nj.Pp 1-20 ML20147E5441985-05-0808 May 1985 Transcript of 850508 Investigative Interview of Pr Clark in Parsippany,Nj.Pp 1-26 ML20147E6551985-05-0202 May 1985 Partially Deleted Transcript of 850502 Investigative Interview of Ba Bader.Pp 1-45 ML20147E6001985-05-0202 May 1985 Transcript of 850502 Investigative Interview of Pb Magitz in Parsippany,Nj.Pp 1-40 ML20147E5171985-05-0202 May 1985 Transcript of 850502 Investigative Interview of Bw Alatary in Parsippany,Nj.Pp 1-15.Marked-up 841107 & 19 Press Releases Also Encl ML20147E8441985-05-0101 May 1985 Partially Deleted Transcript of 850501 Investigative Interview of Dk Croneberger in Parsippany,Nj.Pp 1-44 ML20147E6691985-05-0101 May 1985 Partially Deleted Transcript of 850501 Investigative Interview of Rf Wilson in Parsippany,Nj.Pp 1-44 ML20147E8211985-04-25025 April 1985 Partially Deleted Transcript of 850425 Investigative Interview of Rj Chisolm in Parsippany,Nj.Pp 1-45 ML20147E7581985-04-25025 April 1985 Partially Deleted Transcript of 850425 Investigative Interview of Fg Maus.Pp 1-81 ML20147E5611985-04-25025 April 1985 Transcript of 850425 Investigative Interview of Js Wetmore in Parsippany,Nj.Pp 1-17 ML20147E7151985-04-24024 April 1985 Partially Deleted Transcript of 850404 Investigative Interview of Rj Guimond in Parsippany,Nj.Pp 1-46 ML20147E6291985-04-24024 April 1985 Transcript of 850424 Investigative Interview of P Boucher in Parsippany,Nj.Pp 1-52 1988-07-21
[Table view] |
Text
m
( n . u ., py 1 o
/' (.b b 3 Qf /, n'-
, , , ,g .
./ * .,
' SUl hRY OF APPLICNIT'S FIhNICIAL QuE.IFICATI0 tis
,/;2 >/. . /
'~
f pte m.: . ~ . can s -e-w. t. 1r . u s- - ,.
f> ,
pw .,
~
p l .i n . .i ig. ~
m /Wc "'iE$YIMO.'tY
&' sc w 2WASillflGTON PUS
. r ru . . POWER S IC
.5 4 i f ./ a r
- C : n 2 9 W L . p .t.r. .
2 OF JOSEPH J. STEIll, MANAGING DIRECTOR y (o'.
, p.
s My name is Josep,% J. Stein. My business address is Washington Public Power Supply System, 301 Fifth Avenue, Richland, Washington. I am the Managing Director of Washington Public Power Supply System.
Washington Public Power Supply System is a municipal corporation of the State of Washington and was organized in January 1957 as a joint operating
~
agency,~ pursuant to the laws of Washington. The Supply System is composed of 18 Public Utility Districts and 3 cities.* each of which operates an electri '
cal distribution system within the State of Washington, serving approximately 659.000 electrical customers. The Supply System is empowered to acquire, construct and operate facilities for the generation and transmission of cloc-tric power and energy, but does not engage in the distribution of electric energy at retail. .
The Supply System is authorized by R.C.W. 43.52.3411 to " issue revenue bonds or warrants payable from the revenues of the utility properties operated l by i t" . The Supply Sys' tem is required to adopt a resolution describing the proposed system or plan and setting forth the estimated cost. Such resolutions have been adopted, for Hanford flo. 2 in connecticn with a resolution for revenue notes of $15 million on Daccmber 4, 1970 and $40 million on ilovember 15,1972.
The estimated cost includes nuclear fuel, interest during construction, and provides for escalation and contingencies. The bonds or notes of the Supply System are negotiable instruments and legal securitics for deposits of public moneys, and are legal investr.ents for trustccs and other fiduciaries, and for savings and loan associations, banks and insurance conpanics doing business in n city of Tacoma becamo PrkSmS80".f0"ocESbSEPO Mn.
8409270260 840824 -
$hbO3 PDR
e r 2 .
l
.- -3, . ,
3- ,
If '). .
L ths.' State of,' Washington.
~ .
.The note and.bonddresolutions adopted by the Supply System's Board
'of Directors are the indentures to the' purchasers of the securities in which certain covenants are made to such purchasers. . By agreements with power:
purchbars, termed " participants",the System receives a promise to p
-portion of the' costs of acqtiiring, constructing and operating the facility.
a The aggregate of. the.partic'ipants' obligation to pay costs of the facility; -
i
, will equal the total of such costs. Each participant's portion of such costs includes the, amount required each year to pay ~the interest and a portion of the principal on the bonds outstanding,' ~plus the participant's share of the annual operating costs. The System covenants with the ~ bond holders to pay this principal and interest, as provided in the bond resolution, from the revenues received by -it which are pledged to payment of the bonds. The System agrees '
to set c' side in sinking funds amounts. sufficient to pay each year's accrued interest and principal and to eposit all revenues of the .troject into a Project Revenue Fund.. The System further promises not to agree to any modi-' )
fication of the contracts with participants or others, or amendment of the bond resolution, shich v,iould adversely affect the rights of the bond holders.. I
'llet Billing Agreements between each participant, the supply System and Bonneville Po.<cr Administration ("Bonneville") provide that the Project's entire, capability will be sold by the Supply System to certain statutory pre-forence customers of Bonneville, and assigned by the participants to
, Bonneville. -The Het Billing Agreements provide-that each participant will .
assign its share of Project capabili_ty to Bonneville which will credit the payments made to the Supply System by each participant for its proportionate share of:the Project's annual costs (which includes debt [ervice)against billings'cade by Bonneville'to the participant for onwor and enrtu n carviens !
b a
k .
-3 '
)
n g delivered under other contracts. The Net B1lling Agreements provide that the J participants are obligated to pay the Supply System whether or not the Project y i
is completed operable or operating and notwithstanding the suspension, interrup-j 1,
_ tion, interference, reduction or curtailment of the Project output.
This method of financing large electric generating projects and electric systems has been successfully utilized in the Pacific Northwest for many years.
It has proven-to be a sound economic means of financing and is particularly well adapted to the needs of the System in undertaking the financing of large nuclear
,, generating projects. These Het Billing Agreements are included in the Ten Year Hydrothermal Power Program of the Pacific Northwest. This program was approved by Congress in the Public Works Bill, 1970 (83 Stat. 323,333) and in Public Works Appropriations Bill, 1971, (84 Stat. 890)).
In 1962 the Supply System began construction and is now operating the Packwood Lake Hydroelectric Project (27,000 kw). Construction costs of this project were financed by the sale of revenue bonds in the amount of $13,700,000.
All costs, including debt service,' have been paid on a current basis and, in addition, excess construction fu~nds have been applied to retire $519,000 par value of bonds ailead of schedule. The project output is sold to 12 public utility dis-tricts.
Operatingrevenugsforfiscalyear1972 totaled $851,300.
The System is now operating the Hanford Generating Project, which is supplied steam by the A.E.C.'s N-Reactor. Construction costs were financed by the sale of revenue bonds in 1963 in the total amount.of $122,000,000. All costs including
- debt service have been paid on a current basis and, in addition, excess constructica funds have been applied to retire $26.640,000 par value of bonds ahead of schedule.
The project output is sold to 76 power purchasers, including public utility
_ districts, nunicipalities,' rural electric cooperatives and investor-owned utilities inithe Morthwest region. Operating revenues for fiscal year 1972 totaled
$26,165,200.
x, 4."_ "
)
To' finance the project under consideration in this prucceding, Hanford No. 2,'Revence Notes in the. amount' of $15,000,000 were sold in February 1971 for'the preliminary planning and initial construction costs and an additional
$40,030,000 were sold in December 1972 for purchase of fuel and to meet progress
, payments. The Projecd has been designated as the " Washington Public Powe Supply System Nuclear Project No. 2", referred to herein as the " Project". The Project will be constructed near Richland, Washington, and have an installed capacity of approximately 1100 megawatts.
Funds sufficient to pay interest expense on the Notes until . maturity on July '1,1974, are held in trust. It is planned that the Notes will be redeemed from proceeds of the first long term
' Revenue Bonds to be sold for construction of the Project after the issuance o'f the Construction Permit. Construction' expenditures through November 1972
, amount.to $9,494,400.
Total cost of construction is estimated to be $457,000,000.}
Current, estimates for Hanford No. 2 construction expenditures through the year 1977 are as follows: -
Year '
Expenditure 1972
$13,311,000 - -
1973 62,804,000 1974 93,058,000
'. 1975 157,886,000
, 1976 101,990,000
- 1977 27,790,0.01 -
G f Q, j ' 3 ~" s* *
- Commercial operation is scheduled for September 1977. The project output c
has been sold to 95 consumer utilities in the States of Idaho, Montana, Oregon
'. and Washington.
The participants have agreed to pay the System approximately
-$50,000,000 per year for the term of the bonds, as prescribed .in the Net . Billing U
Agrcements.
In order to successfully market long term bonds in the' amount of
, - ,,n ~ w, ,, ----,.,,-w -,-,.vwr ..,m, - - . ,
- - - - . , - - - - , ,- g ,
r-l n
> , l b approximately $457,000,000 to finance the Project, the Supply System will ,
issue its tax exempt revenue bonds in series from time to time during the
~
It is planned to issue these bonds on the following period of construction.
' schedule:
bateofIssue_ Amount November 1973 $150;000,000 July 1975 '$150,000,000 -
September 1976 $157,000,000 *
. g The first bond issue, Series 1973, would include the refunding of outstanding short tenn notes. Each series of bonds issued will be on a parity with other
- bonds issued. The bonds are to be repaid on a level debt service basis over the 35 ye'ar anticipated life of the Project.
. All of the System's long term funding for these projects will be pro-vided from the sale of revenue bonds. The System's current rating is A-1 by Moody's Investors Service, Inc. , and AA by Standard and Poor's Corporation.
If, for any reason, the Supply System is unable to issue and sell bonds A
or refunding notes to obtain funds to pay the principal of the Notes, together with any interest thereon, when due, or is unable to proceed with the financing of the Project, the Supply System covenants in the resolutions auth-orizing the issuance of such notes that it will terminate the Project as pro-v'ided in the Project Agreement.
If, for any reason, the System is unable to complete construction of the Project, or after co:r.rancement of commercial operation the System is unable '
to continue operation of the Project, each ~of the Participants will pay to the System its respective share of debt service, together with any other costs.
associated i!ith the' termination of the Project.' These paymen'ts are to be treated as credits against billings made by Bonneville to the participants for
)
i ."
M L
) -
'} .
e o
t
power and certain services.
TheSystempkanstoconstructWashingtonPublicPowerSupplySystem Nuclear Project No.1 on the site of the existing Hanford Generating Project.
Nuclear Project'No.1 will include a comercial. nuclear steam ' supply system to replace the government owned N-Reactor, which is to be shut down in 1975, and a topping turbine" generator.to interface with the existing 86014! steam plant. Nuclear Project No.1 is scheduled to be completed in 1980 at a cost
' cf approximately $607.000,000. The System also plans to construct and acquire 70% undivided ownership interest in a nuclear electric generating plant, s
defined as the Washington Public Power Supply System Nuclear Project No. 3, Siting studies having an installed capacity of- approxi'mately 1130 megawatts.
are underway and WPPSS No. 3 Project is scheduled to be completed in 1981.