_ _ _ _ _ _ _ _ _ _ _ _ _

t Wh?

I 8tiL e>4ERdi U

ED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION I

In the matter of:

COMMISSION MEETING Affirmation / Discussion and Vote (Public Meeting!

Docket No.

(

Location: Washington, D. C.

Cate: Tuesday, November 26. 1985 Pages:

1-5 hDf fhfh 851126 PT9.

PDR ANN RILEY & ASSOCIATES Court Reporters

(

1625 I St., N.W.

Suite 921 Washington, D.C.

20006 (202) 293-3950

1 D I SCL4 1 MER 2

3 4

5 6

This is an unofficial transcript of a meeting of the 7

United States Nuclear Regu l a t ory Ccce l ss i on he l d on 3

11/26/85 In the Commission's office at 1717 H Street, 9

N.W.,

Washington, D.C.

The meeting was open to public 10 attendance and observation.

This transcript has not been 11 reviewed, corrected, or edited, and it may contain 12 inaccuracies.

13 The transcript is intended solely for general 14 Informational purposes.

As provided by 10 CFR 9.103, it is 15 not part of the formal or informal record of decision of the 16 matters discussed.

Expressions of opinion in t h i.s transcript 17 do not necessarily reflect final determination or beliefs.

No 18 pleading or other paper may be filed with the Commission in 19 any proceeding as the result of or addressed to any statement 20 or argument contained herein, except as the Commission may 21 authors =e.

22 23 24 25

a 1

UNITED STATES OF AMERICA 2

NUCLEAR REGULATORY COMMISSION 3

4 AFFIRMATION / DISCUSSION AND VOTE 5

6 PUBLIC MEETING 7

8 Nuclear Regulatory Commission 9

Room 1130 10 1717 "H"

Street, N.W.

11 Washington, D.C.

12 13 Tuesday, November 26, 1985 14 15 The Commission met in open session, pursuant to 16 notice, at 4:17 o* clock p.m.,

NUNZIO J.

PALLADINO, Chsirman of 17 the Commission, presiding.

18 COMMISSIONERS PRESENT:

19 NUNZIO J.

PALLADINO, Chairman of the Commission 20 THOMAS M.

ROBERTS, Member of the Commission 21 JAMES K.

ASSELSTINE, Member of the Commission 23 FREDERICE M.

B E R N T it A L, wember of th-e-~~is:icn 23 LANDO W.

ZECH, JR.,

Member of the Commi,ssion 24 25

2 I

STAFF AND PRESENTERS SEATED AT COMMISSION TABLE:

2 S.

CHILK 3

M.

MALFCH 4

A.

BATES D.

RATHEUN 6

P.

BOLLWEEK

't 8

9 10 11 12 13 14 15 16 1 'l 18 19 20 21

'i 2 23 24 25

3 1

P ROCEED I NG S 2

CHAIRMAN PALLADINO:

Cood afternoon ladies and 3

gentlemen.

This is an attirmation/ discussion session.

We 4

have two items planned for action this afternoon.

I will ask 5

the Secretary to lead us through the two items.

6 SECRETARY CHILK:

Before we go that, Mr. Chairman, I

?

wonder if the Commission will vote to hold these two items,

's 8

85-338A dealing with Pilgrim and 85-370 dealing with Fort 9

St. Vrain on less than one week's notice.

10 CHAIRMAN PALLADINO:

This having to do with equipment 11 qualification.

i 12 SECRETARY CHILK:

This has to do with equipment 13 qualifications.

14 (Chorus of ayes.)

15 SECRETARY CHILK:

The first one is85-370, an order 16 regarding equipment qualification extension of a November 30, 17 1985 deadline for Fort St. Vrain Nuclear Generating Station.

18 The Commission here is being asked to act on the 19 order responding to a request to extend the deadline for 20 environment qualification of Fort St.

Vrain Nuclear Generating 21 Station from November 30, 1985 to May 31, 1986.

22 The Commission is also being asked to empower the 23 director of NRR to authorize operation of Port St. Vrain at up 24 to 35 percent of full nower through May 31, 1986.

I 25 The Director's authority would be contingent upon l

4 finding that the confirmatory submittals from the licensee are l

2 acceptable.

3 All Commissioners have approved the extension of the 4

EQ deadline to May 31, 1986 and to empower the Director of NRR 5

to authorize contingent on a tinding that the confirmatory 6

submittals are acceptable the operation of Fort St. Vrain at 7

up to 35 percent of full power through May 31, 1986.

8 Would you please attirm your votes?

9 (Chorus of ayes.)

10 SECRETARY CHILK:

The second item is 85-338A.

It 11 deals with the environmental qualification extension request 12 for Pilgrim.

13 The Commission here is being asked to act on an 14 order responding to a request also to extend from November 30, 15 1985 to February 8,

1986 the deadline for environmental 16 qualification at the Pilgrim Nuclear Power Station.

17 The Chairman, Commissioners Bernthal and Asselstine 18 disapprove the extension of the EQ deadline.

19 Commissioner Roberts and Zech would extend the time 20 trame for documentation.

Commissioner Zech wou;d also extend 21 the tima frame for equipment testing.

22 The exact wording of the order will be coorcinated 23 with Commission ottices since we have not had it betere you 24 prior to approval.

25 Would you please attirm your votes?

a

+

e 1

CHAIRMAN PALLADINO:

May I ask a question?

Doet the 2

order have to be attirmed?

3 SECRETARY CHILK:

Marty, does the order have to be 4

attirmed?

5 MR. MALSCH:

I think our plan would be that the 6

bottom line would be affirmed today.

We would simply circulate 7

the order.

8 SECRETARY CHILK:

Circulate the order for the words.

9 CHAIRMAN PALLADINO:

All right.

Thank you.

10 SECRETARY CHILK:

Would you please attirm your 11 votes?

i 12 (Chorus of ayes.)

13 SECRETARY CHILK:

Thank you.

I'4 CHAIRMAN PALLADINO:

Anything more to come before 15 us?

16 SECRETARY CHILK:

I have nothing further, 17 Mr. Chairman.

18 CHAIRMAN PALLADINO:

All right.

Thank you.

We will 19 stand adjourned.

20 (Whereupon, the Commission was adjourned at 4:20 21 o' clock p.m.,

to reconvene at the Call of the Chair.)

22 23 24 25

1 CERTIFICATE OF OFFICIAL REACHTER 2

3 4

5 This is to certify that the attached proceedings 6

before the United States Nuclear Regulatory Commission in the 7

matter of. COMMISSION MEETING 3

9 Name of Proceeding:

Affirmation / Discussion and Vote (Public Meeting) 10 11 Cocket No.

12 P_l a c e : Washington, D. C.

13 Date: Tuesday, November 26, 1985 14 15 were held as herein appears and that this is the original 16 transcript thereof for the file of the United States Nuclear 17 Regulatory Commission.

13 (Signature) g yy(


]-

39 (Typed Name of Report er)' Marilynn Nations 20 21 22 23 Ann Riley & Associates. Ltd.

24 25

OSk0000000kbbbk0000t0e0900000t000Q$QgQNNNNNN9QNNgQgQqQp(Q g

9/35

[

TawsarrrAL m:

/

Document Control Desk, 016 Phillips g

tm ADVANCED COPY 'IO: //

'Ihe Public Document Ibm l1b. & 5 DATE:

C&R q

w/attachs.

3 (w/o SECY N

j papers)

Attached are copies of a Comnission meeting transcript (s) and related nceting doctanent(s). They are being forwarded for entry on the Daily Accession List and placerient in the Public Document Rom. No other distribution is requested or regtured. Existing DCS identification numbers are listed on the individual documents wherever known.

Meeting

Title:

A T-f i < w a.k

/ Th sc.ug M \\ f a k e-Meeting Date:

h Open Y Closed DCS Copies (1 of each checked)

Item

Description:

Copies Advanced Original May Duplicater To PDR Document be Dup

  • Copy
  • l.

TRANSCRIPT 1

1 hhen checked, DCS should send a copy of this transcript to the LPDR for:

2. he a a 5-3sa A 2_

I I

3.

Sateu E g-37 o

_3

/

3 4.

<.k 9

(PDR is advanced one copy of each document,

  • Verify if in DCS, and g;

two of each SECY paper.)

Change to "PDR Available."

p

$S!

f/0WWdWdWFdWdM%%WhMWSWdMWAMMMWdhTdMMMMMWMWdhWhhMMMMME