ML20098C670

From kanterella
Jump to navigation Jump to search
Amend 1 to Application for Cps,Providing Updated Cost Estimate & Correcting Error in Scheduled Fuel Loading Date for WPPSS 5
ML20098C670
Person / Time
Site: 05000000, Satsop
Issue date: 02/19/1975
From: Stein J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Case E
Office of Nuclear Reactor Regulation
Shared Package
ML20093C821 List: ... further results
References
CON-WPPSS-038, CON-WPPSS-38, FOIA-84-603 2156, NUDOCS 8409270113
Download: ML20098C670 (4)


Text

m s .. -

P I P W shington Public Power Supply System A JOINT OPERATING AGENCY S '

p. o. so, ses sooo oco w.. ,~oro., w., n.cu u ~o. w...,~oro ..m p oucison> 4s.neer Docket Nos. STN 50-508 and STN 50-509 Februar _19, 1975 e ir b

Mr. Edson G. Case, Acting Director ( [r ul!

v/.; ' '

7, Office of Nuclear Reactor Regulation NL U. S. Nuclear Regulatory Commission E '

Washington D. C. 20555 - FE82 5 s75 i g g c,i:. ,, - pI t,

y s

Subject:

AMENDMENT N0. 1 TO WPPSS NUCLEAR A; .

PROJECTS N0. 3 & 5 - LICENSE APPLICATION f"...,; ~ ' 4" f'

Dear Mr. Case:

nl O The Washington Public Power Supply System is filing herewith three (3) signed originals and twenty-five (25) copies of Amendment No.1 to the WPPSS Nuclear Projects No. 3 and 5 License Application.

The purposes of this amendment to the License Application are: 1) to provide an updated cost estimate for WNP-3, 2) to provide a cost estimate for WNP-5,

{ which was not available at the time that the application was filed in July of 974, and 3) to correct an error in the scheduled fuel. loading date for WNP-5.

As pointed out in the application. the Number Three Project will be owned jointly by WPPSS and four investor owned utilities with WPPSS owning 70% of the project and the investor owned utilities sharing in the other 30%. Owner- l ship in the Number Five Project has been offered to other public and private utilities, however, as of this date, none of these offerings have been accepted and the project is continuing under the assumption of 100% WPPSS ownership.

Instructions for incorporating the revised material in the application have been included with the amendment.

Very truly rs ,

htm '

J . TEIN b Managing Director JJS:GCS:ct Enclosure cc: Mr. B. W. Kennedy, Bonneville Power Administration Mr. J. B. Knotts, Conner, Hadlock and Knotts h jl3840824 COHEN 84-603 21$(

PDR

. i

'A

.,)

. .lett:r to Edson G. Case from JJ Stein 9 '

'dateu 2/19/75

' i* .

Subject:

Amendment No. I to WPPSS

. Nuclear Projects No. 3 & 5 -

It f.icense' Application f'

stall 0F WASHINGTON ) ,

)Vss '

f.OllNTY Of BENTON ) j ,

/

.l. J., STElti, Being first duly sworn, deposes and says: That he is the Manaeline; Director.of the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant bri.'in; that he is. authorized.to submit the foregoing on behalf of said apliliunt; that he, has read the foregoing and knows the conteats thereof; and be* liv ves the same to be true to the best of his knowledge.

./

llAll l! , , jyifI r , , , c' S

/h ' ,' 1975 3[Y

' k .(y - --~

J. J.yTEq .

On this day perscaally appeared before me J. J. Stein to me kno' wn to be the in<lividual who executed the foregoing instrument and ackncwledged that he sielned the same as his free act and deed for the uses and purposes therein mentioned.

(-

GIVI.H under my hand and seal this

/ 9/iday of 'MMeg 1975 W?iv si S.8%

Nota'ry Public in a}n for th'e State of Washington D'f ""

Residing at /. o j a [

, N e

r-7,. ..; -

WNP-3 & 5 LICENSE APPLICATION

.ft . ~ AMEN 0 MENT NO. 1

., INSTRUCTION SHEET j.-b The following page removals'and insertion should be made to incorporate Amendnent No.1 into the License Application.

Remove Insert (Existing Pages) (New Pages) e;. 15- 15 t

16 16 17 e

o a.

C P AppHedu- W N P 3 45~

+s NRC DISTRIBUTION FOR PART SO DOCKET MATERIAL (TEMPORARY FORM) 21 %

j CONTROL NO:

FILE:

ROM: b'ashington Poblic PoucrlDATE OF DOC DATE REC'D LTR TWX RPT OTHER Supply Syster2 /

J2 3. Stein / 2-19-75 2-25-75 xx TO: /' ORIG CC OTHER SENT AEC POR xm Mr. Edson G. Case 3-signed SENT LOCAL PDR xx CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

y.xxx 25 STN 50-508 and 509 DESCRIPTION: ,

ENCLOSURES:

Ltr notoriz'ad trans the following: Andt di to the UPPSS Nuclear Projects 0 3 and 5 to the Liccuse Applicatien ......

consisting of revised financial in?c .. . .

PLANT N AME: 1:PPSS Nuclear Proj c 3and 5 j

^ ,- ~F'm MTOffllNFORMATION 2-27-75 Jan BUTLER (L) 4CHWENCER (L) ZIEM ANN (L) REG AN (E)

W/ Copie: W/DCopies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

W/ Conies W/ Conio< W/ Cnnios W/ cnnin PARR (L) VASSALLO (L) KNIGHTON (E) - SPELS W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E)

W/ Copies W/ Copies W/ Copies W/ Ccpies INTERN AL DISTRIBUTION G FILE TECH REVIEW DENTON LIC ASST AgIND.

i RC PDR E HROEDER GRIMES R. DIGGS (L) WR Al~t M AN edGC ROOM P 506A MACCARY GAMMILL H.EE ARIN (L) A MAN GOSSICK/ST AF F KNIGHT KASTNER (GOULBOURNE (L) w LTZ

/ CASE rd e PAWLICKl BALLARD P. KREUTZER (E)

AI AMBUSSO N SHAO SPANGLER J. LEE (L) PLANS BOYD STELLO M. MAIG RET (L) W DONALD pMOORE (L) 0- HOUSTON ENVIRO S. REED (E) CHAPMAN DEYOUNG (L)k-d.-

NOVAK MULLER M. SERVICE (L) DUBE (Ltr)

SKOVHOLT (L) ROSS DICKER S. SHEPPARD (L) E. COUPE GOLLER (L) (Ltrl lPPOLITO KNIGHTON M. SLATER (E) PETERSON P. CO L LINS TEDESCO YOUNGBLOOD H. SMITH (L) HARTFIE LD (2)

PENISE LONG REGAN S. TEETS (L) KLECKER

./HEG OPR LAINAS &#h0 JECT LDR G. WILLI AMS (E) EISENHUT FILE & REGION (2) BENAROYA 6t 4*dhy/uuN. WILSON (L) WlGGINTON T.R. WILSON VOLLMER H AR LESS R. INGR AM (L)

STEELE EXTERNAL DISTRIBUTION __

/- LOCAL PDR M0"ter.ano, tMsh

  1. - TIC (ABERNATHY) (1)(2)(10) - N ATION AL LABS 1 - PD R-SAN /L A/NY g- NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKHAVEN NAT LAB 1 - ASLD 1 - CONSU LTANTS 1 - G. U LRIKSON. O RN L 1 NEWM ARK /BLUME/AGBABI AN *'T'- AGMED (RUTH GUSSVAN) b - Newton ACRS Anderson SliAG.;&GTSE NT Rm e 127 GT , l I 1 - J. D. RUNKLES Rm E-201 4- a L.*o #b2*C' GT