Forwards Amend to Application for CP & Antitrust Info,Psar & Environ Rept.W/O PSAR & Environ Rept
ML20098C987
Person / Time
Site: 05000000
Issue date: 10/15/1973
From: Stein J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Oleary J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20093C821 List: ... further results
References
CON-WPPSS-109, FOIA-84-603 7646, NUDOCS 8409270309
Download: ML20098C987 (6)


Text

L P

P Washington Public Power Supply System A JOINT OPERATING AGENCY 60 .

P. O. BOX 964 301 firth AVE. RIC HL AN D,WASHIN GTO N 99352 T EL E PHON E (5091946 9681 October 15, 1973

.e. mv. -

g *f j , s.d 'N Dr. John F. O' Leary  % /

Directorate of Reactor Licensing Og7.lg '

._i Office of Regulation tm N D/g $

U.S. Atomic Energy Commission d T o- ~

Washington, D. C. 20545 $#R%

(([ j['

p -[

Subject:

WPPSS NUCLEAR PROJECT NO. 1 C ,-i O' APPLICATION FOR CONSTRUCTION PERMIT

References:

(I) Letter, A. Giambusso to J.J. Stein, dated 10/12/73.

(2) Letter, Jerome Saltzman to J.J. Stein dated 7/17/73.

(3) Letter, J.J. Stein to Jerome Saltzman, subject, " April 25, 1973, Correspondence to

( Mr. Abraham Braftman from Mr. J.J. Stein,"

dated 7/24/73.

Dear Dr. O' Leary:

Reference (1) stated that the tendered application for a permit to construct the WPPSS Nuclear Project No. 1, submivted by the Washington Public Power Supply System on July 16, 1973, with additional information submitted on October I,1973, was suf ficiently complete to docket.

Therefore, the Supply System herewith transmits the following documents: t Twenty-Eight (28) copies of the Application and Anti-Trust Information, including three (3) signed and notarized originals (1 volume).

Seventy-Three (73) copies of the PSAR (7 volumes per set).

Two-Hundred (200) copies of the ER (i volume per set).  ;

The submission of these documents and the appIIcation fee previously submitted on August 7, 1973, constitutes the Washington PublIc Power Supply System application for: 1) a 40-year Class 103 license to con-struct and operate a nuclear power plant at its WPPSS Nuclear Project No. 1 Site, and 2) appropriate source, by-product and special nuclear material licenses for the project.

\

e4092foao9e40824 hens 603 PDR l

l Dr. JF O' Leary October 15, 1973 Page Two WPPSS Nuclear Project No. I is a modification to an existing f acility.

WPPSS currently owns and operates the steam-electric generating plant known as Hanford Number One, which will be utilized in this project.

WPPSS Nuclear Project No. I will replace the Nuclear Steam Supply now provided by the AEC owned New Production Reactor (NPR or N-Reactor), and add a topping turbine to'the existing low pressure turbines of Hanford Number One.

Reference (2) requested additional copies of information supplied by WPPSS in support of our response to item 9 of the Anti-Trust Information.

in Reference (3), WPPSS'provided the information requested. In addition, the Application and Anti-Trust Information included with this transmittal has been modified to include the Information within the volume. Therefore, the Application and Anti-Trust information now being transmitted differs from that submitted with the tendered application in this regard.

All correspondence with the Supply Systec: should be directed to:

Mr. J. J. Stein, Managing Director Washington Pubile Power Supply System

. 301 Fifth Avenue, P.O. Box 968 Richland, Washington 99352

(

We would also appreciate copy coverage of all correspondence to:

Mr. G. M. Olds Mr. Joseph B. Knotts Babcock & Wilcox Conner, Hadlock & Knotts P.O. Box 1260 1747 Pennsylvania Ave. NW Lynchburg, Va. 24505 Washington, D.C. 20006 Mr. R. B. Brocklebank United Engineers & Constructors Inc.

1401 Arch Street Philadelphia, Pa. 19105 Very truly yours, J4 J.' STEIN Managing Director JJS:AGH:mac Enclosures cc: J .B. Knotts

(

L_, < ,'

l 1

. STATE OF WASHINGTON )

) ss COUNTY OF BENTON )

J. J. STEIN, Being fIrst duly sworn, deposes and says: That he is the Managing Director of the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the foregoing on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.

DATED: Oc 4obem I5' , 1973

.b.%. % -- i E S IN Subscribe and sworn to before me this ($+ day of C;cdolv J 973.

( -

h v i. 4 -' -

LOh-Notary Public in and for the State of Washington, residino at e3 C3 %e.L% hC h . < % m C h L

My Commission expik,s: - s La w Oh 2C i \C i ll

\

1 l

l Washington Public Power Supply System -

@P.O. BOX 9M A JOINT OPERATING AGENCY 301 FIFTH AVE. RICHLAN D, W ASHIN GTO N 99352 T ELE PHON E (509194-921 October 15, 1973 Dr. John F. O' Leary .,

Directorate of Reactor Licensing Office of Regulation .2' U.S. Atomic Energy Commission Washington, D. C. 20545 '

(- t ',

Subject:

WPPSS NUCLEAR PROJECT NO. I '1 ,

APPLICATION FOR CONSTRUCTION ^ \.' -

D%

~

PERM IT

/> ,/

Nl . ,

Y .?,

References:

(1) Letter, A. Giambusso to J.J. Stein, dated ~

10/12/73.

(2) Letter, Jerome Saltzman to J.J. Stein dated 7/l7/73.

(3) Letter, J .J . Stein to Jer ome Saltzman, subject, " April 25, 1973, Correspondence to

. Mr. Abraham Braitman f rom Mr. J .J . Stein,"

dated 7/24/73.

Dear Dr. O' Leary:

Reference (1) stated that the tendered application for a permit to construct the WPPSS Nuclear Project No. 1, submitted by the Washington Public Power Supply System on July 16, 1973, with additional information submitted on October I, 1973, was sufficiently complete to docket.

Therefore, the Supply System herewith transmits the following documents:

Twenty-Eight (28) copies of the Application and Anti-Trust Information, including three (3) signed and notarized originals (i volume).

Seventy-Three (73) copies of the PSAR (7 volumes per set).

Two-Hundred (200) copies of the ER (1 volume per set).

The submission of these documents and the application fee previously submitted on August 7, 1973, constitutes the Washington Public Power Supply System application for: 1) a 40-year Class 103 license to con-struct and operate a nuclear power plant at its WPPSS Nuclear Project No. I Site, and 2) appropriate source, by-product and special nuclear material licenses for the project.

l

}h8

Dr. JF O' Leary October 15, 1973

, Page Two WPPSS Nuclear Project No. . ! is a modif ication to an existing f acility.

WPPSS currently owns and operates the steam-electric generating plant known as Hanford Number One, which will be utilized in this project, WPPSS Nuclear Project No. I will replace the Nuclear Steam Supply now provided by _ the AEC owned New Production Reactor (NPR or N-Reactor), and add a topping turbine to the existing low pressure turbines of Hanford Number One.

Reference (2) requested additional copies of information supplied by WPPSS In support of our response to item 9 of the Anti-Trust information.

in Reference (3), WPPSS provided the information requested. in addition, the Application and Anti-Trust Information included with this transmittal has been modified to include the information within the volume. Therefore, the Application and Anti-Trust Information now being transmitted differs from that submitted with the tendered application in this regard.

All correspondence with the Supply System should be directed to:

Mr. J. J. Stein, Managing Director Washingten Public Power Supply System 301 Fifth Avenue, P.O. Box 968 Richland, Washington 99352

, We would also appreciate copy coverage of all correspondence to:

Mr. G. M. Olds Mr. Joseph B. Knotts Babcock & Wilcox Conner, Hadlock & Knotts P.O. Box 1260 1747 Pennsylvania Ave. NW Lynchburg, Va. 24505 Washington, D.C. 20006 Mr. R. B. Brocklebank United Engineers & Constructors Inc.

1401 Arch Street Philadelphia, Pa. 19105 I

Very truly yours, J ' J .' STE I N Managing Director JJS:AGH:mac Enclosures cc: J .B. Knotts g.

( STATE OF WASHINGTON )

ss

)

COUNTY OF BENTON )

J. J. STEIN, Being fIrst duly sworn, deposes and says: That he is the Managing Director of the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the foregoing on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.

DATED: Oc kok I5' , 1973 J.

%. % . % J S IN Subscribe and sworn to before re this l '5

  • day of C.cMvJ 973.

5 V

-du. c. [h_ r LOW -

Notary PuDlic in and for the State of Washington, residina at a C;L. h t..L w h C

\%. .<% RM L MyCommissionexpik,s:O w.s Oy 3L. V D 1

\

j