ML20098C722

From kanterella
Jump to navigation Jump to search
Marked-up Testimony of Jt Bobo Re Applicant Financial Qualifications
ML20098C722
Person / Time
Site: Washington Public Power Supply System
Issue date: 08/06/1976
From: Bobo J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML20093C821 List: ... further results
References
CON-WPPSS-025, CON-WPPSS-25, FOIA-84-603 NUDOCS 8409270150
Download: ML20098C722 (14)


Text

[ . Li

'4 -

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION t

In the Matter off , ) ,

)

WASHINGTON PUBLIC POWER ) Docket No. 50-513 SUPPLY SYSTEM )

)

(Nuclear Project No. 4) )

TESTIMONY OF JAMES T. BOBO REGARDING APPLICANT'S FINANCIAL QUALIFICATIONS I. Background The evidentiary hearings on radiological health and safety issues were conducted on November 11-13, 1975, at which time the Applicant requested that consideration of its financial qualifications to construct WPPSS Nuclear Project

, No. 4 ("WNP-4") be deferred. Although findings of fact and conclusions of law made by the Atomic Safety and Licensing Board (" Board") in its Initial Decision (NRCI-75/12 922 (December 22, 19751), related to both UPPSS and

, Nuclear Project No. 1 ("WNP-1") and WNP-4, the findings' and conclusions relating to financial qualifications related only to WNP-1. See n. 28, NRCI-75/12 at p. 943.

, The Board noted in its Initial Decision (NRCI-75/12 at

p. 928) th'at it would receive additional evidence from the parties with'a' view"towa'rd supplementing its Init'ial'~

Decision at a suitable time with appropriate findings relat-ing to the Applicant's financial qualifications to construct WNP-4.

84092{0150840824 PDR

$OEN84-603

1

5 .

, _2- ,

l II. Applicant's Financial Qualifications My name is James T. Bobo. My business address is Washington Public Power Supply System, 3000 George Washington Way, Richland, Washington. I am the Manager of Finance of the. Washington Public Power Supply System ("WPPSS" or

'" Supply System"). The purpose of my testimony is to summarize and update the information in our license appli--

cation regarding the Supply System's financial qualifications in terms of NRC regulations (10 CFR S 50.33 (f) ) , i.e.,

that WPPSS possesses, or has reasonable assurance of obtain-ing, the funds necessary to cover estimated construction costs and related fuel cycle costs for WNP-4.

Washington Public Power Supply System.is a municipal corporation and joint operating aaency of the State of Washington, organized in January, 1957 pursuant to the laws of Washington. The Supply System is composed of 18 public utility districts and three cities, each of which operates an electrical distribution system with the State of

Washington. The Supply System is empowered to acquire,

. construct and operate facilities.for the generation and transmission of electric power and energy, but does not engage in the distribution of electric energy at retail.

l l

. i

F -

l O The Supply System's sources of construction funds for WNP-4 are. typical for thoseIfor a public agency, i'. e . ,

advances or. guarantees from purchasers or prospective pur-chasers of the output'of the project as an interim measure to cover initial expenditures (often followed by the issuance of short-term debt securities), and, for permanent financing, issuance of long-term debt securities. Of course, there is no equity (that is, no invested capital) involved in public agency financing. Since WPPSS itself does not have revenues from a variety of wholesale and retail sa'les, but only from sales of generation, and since revenues do not exceed costs but rather are limited to reimbursement of costs, there are no internally generated funds in the sense of retained earnings which might be l'ooke'd to as sources of construction funds. Thus, in the absence of equity or internally generated funds, debt securities are the fundamental source of construction financing.

WPPSS debt securities are of the revenue hond or revenue note type. Revenue bonds or notes are the normal form of debt security for public agency financing of

. . activities such as electric . generation.. construction programs.-

In any event, WPPSS is au'horized c by RCW 43.52.3411 only to

" issue revenue bonds or warrants payable from the revenues of the utility properties operated by it." The bonds or L-..

7_ .

_4 notes of'the Supply System are negotiable instruments and legal securities for deposits of public monies, and are legal investments for trustees and other fiduciaries, and for savings and loan associations, banks and insurance companies.

WNP-4 and the WPPSS share (90%) of WNP-5 will be financed in the same manner as WPPSS Nuclear Project No. 1, No. 2 and No. 3 ("WNP-1" , "WNP-2" and "WNP-3" , respectively) ,

through the issuance of revenue bonds. All projects i.e.,

heretofore undertaken by the Supply System, except WNP-4 and WNP-5, have been financed as separate systems. WNP-4 and the Supply System's ownership interests in WNP-5 will be

  • financed as one system, and the project financ'ing approach used for WNP-1, WNP-2 and WNP-3 will not be altered. Under that approach, the Supply System's Board of Directors adopts a resolution describing the proposed plan and system which sets forth the estimated cost just prior to the issuance of

, securities. Such a resolution has already been adopted for WNP-4 and WNP-5 for the plan and system and for the issuance

.of revenue..

bonds in the. amount of.$100 million issued on

~

July 15, 1975. The note and bond resolutions adopted by the

~

Supply System's Board serve as the indentures to the buyers of the securities in which certain covenants are made to such i

)

buyers.

l 1

s

%. ,- y . _ . - - ,- e. , -

The securities for the WNP-4 and WNP-5 will be secured by contractural commitments between the Supply System and approximately 90 public and cooperative utilities (the

'ij .

" Participants") to purchase the entire electrical capability of WNP-4 and ninety percent (90%) of the capability of WNP-5.

These contracts are called " Participants' Agreements." Under I the Participants' Agreements, the Supply System receives a promise to pay a portion of the costs of acquiring, con-structing and operating the facilities. The aggregate of

_these purchasers' obligations must equal the total costs of the facilities. Each Participant's nortion of such costs includes the amount recuired each year to pay the interest and a portion of the principal on the bonds outstanding, plus the Participant's share of the annual operating costs.

The Supply System covenants with the bond holders in the

. bond resolution to pay this principal and interest from the revenu_es derived from the operation of the facilities.

The Supply System agrees to set aside, in sinking funds, amounts sufficient.to pay each year's accrued interest and principal and to deposit all revenues of the Proinct (NNP-4 and WNP-5) into a Proiect Revenua Fund- Pha ' Supply. System'further

~

promises not to agree to any modification of the contracts l with Participants or others, or amendment of the bond l j resolution which would adversely affect the rights of the l i

/ .;

r(c/y,/ 4

. ,u n wAlp  :)A . . s ct9 v ,' t. ,Ob -u.tv i o

n'... a . .

e .- _

f .* f. . t, (f v 5 "'

- <. '. ,7 2-<n ,

e bond holders. Under this ar,rangement the annual pr,oject budget, including retirement of debt and associated interest, is paid by the Participants.

The first level df securitv for repayment 'of bonds is the revenues to be derived from operation of the Project.

The second level of security is th<.t the Participants are obligated to make payments whether or not the Project is completed, operable or operating, and nothwithstanding interruption or curtailment of output. The source of funds for the payment of Project costs is not dependent on actual project revenues, but is " insured" on a broad base through the obligation of the public and cooperative entities.

Assurance that such obligations .can be met is provided in-that the Particinants covenant to inr*oane rates to the level necessary to meet their obligations to the Supply System. These rates are not subject to review or approval by any State Agency. In the case of default by a Participant, i each other Participant in its class (i.e., cooperative or public agencies) promises to step-up their respective obliga-tion by as much as 25 percent.

This method of financing large electric ge6erating projects and electric systems has been successfully utilized in the Pacific Northwest for many yaars. It has proven to be.a sound economic means of financing and is particularly

@< )

~7- . j 4

1 well adapted to the needs of the Supply System in undertaking

. the' financing of large nuclear generating projects.

The' Supply System has a record of successful financing-of generating. projects. In 1962, the supply System began construction and is now operating the Packwood Lake Hydro-electric Project (27,00$kw). Construction costs of this Project were financed by the sale of revenue bonds in the amount of $13,700,000. All costs, including debt service, have been paid on a current basis and, ir addition, excess construction funds have been applied to retire $519,000 par value of bonds ahead of schedule. The project output is sold to 12 public utility districts. Operating revenues

. for fiscal year 1975 totaled $749,460.

The Supply System successfully financed and is now operating the Hanford Generating Project, which is supplied steam by ERDA's N-Reactor. Construction costs were financed by the sale of revenue bonds in 1963 in the total amount of

$122,000,000. All costs, including debt service, have been paid on a current basis and, in addition, excess construction s . funds have,been applied to retire $34,825,000 par value of b'onds ahead of schedule. The Project output is sold to 76 power purchasers, including public utility districts, municipalities, rural electric cooperatives and investor-

' owned utilities in the Northwest region. Operating revenues for fiscal year 1975 totaled $30,310,421.

-g-The Supply System is constructing WNP-1, a 1250 MWe nuclear generating plant on ERDA's Hanford' Reservation near Richland, Washington. This plant is a duplicate of WNP-4, but financed independently from WNP-4 under Not Billing Agreements. In September of 1975 the Supply System issued the first long-term revenue bonds to finance WNP-1. To date a total of $355,000,000 in long-term debt has been issued. These securities have been rated Aaa by Moody's Investor Service, Inc. and AAA by Standard and Poor's <

Corporation. It is estimated that WNP-1 will cost

$1,153,000,000. Commercial operation is scheduled for early dall 1981. .

The Supply System.is also constructing.WNP-2 (formerly Hanford No. 2) , a 1100 MWe nuclear generating plant on the Hanford Reservation near WNP-1 and WNP-4. WNP-2 is being financed in the same manner as WNP-1 with the entire capability being sold to public and cooperative bodies under similar det Billing Agreements. In July of 1973, the Supply System issued the first long-term revenue bonds to finance WNP-2. To date, a total of $600,000,000 in long-term debt

has'besn issued. 'These' securities were' rated Aaa by Moodys

~

~

Investor Service, Inc. and AAA by Standard and Poor's Corpora-tion. WNP-2 will cost an estimated $794,000,000. Commercial operation is. scheduled for late 1979.

O L...

The Supply System.has also begun work on two nuclear electric generating plans known_as the WNP-3 and WNP-5.

These plants will be twin plants located near Aberdeen in Grays Harbor County, Washington. The Supply System has a

.70% ownership in WNP-3. The additional 30% is owned by the following four investor-owned utilities:

Ownership Interest Pacific Power & Light Company '10%

Portland General Electric Company 10%

Puget Sound Power & Light Company 5%

- The Washington Water Power Company 5%

Total Investor-Owned Ownership Interest 30%

The Supply System will own 90% and Pacific Power and Light Company will own 10% of WNP-5. Each plant will have an installed capacity of 1250 MWe and is scheduled for commercial operation in 1982 and 1984, respectively.

Estimated project cost for WNP-3 exclusive of the investor-owned companies financing expenses, is $1,268,839,000.

Estimated cost of WNP-5 is $1,271,000,000. The Supply System issued $250 million of long-term revenue bonds for WNP-3. These long-term securities have been rated Aaa by Moody's; Investor Servige, Inc.,and AAA by(Standard and Poor's Corporation.

As noted previously, WNP-4 and the WPPSS share of WNP-5 will be financed in the same manner as WNP-1, WNP-2 and WNP-3, i.e.,'throngh the issuance of revenue bonds. All s

e projects heretofore undertaken by the Supply System, except WNP-4 andLWNP-5, have been financed as separate systems.

Although WNP-4 and ths Supply System's ownership interests in WNP-5'will be financed as one system, the project financing

- approach used for WNP-1,1WNP-2, and WNP-3 will not be altered.

Prior to the execution of necessary Participants' Agree- P' ments, initial financing of WNP-4 and WNP-5 was supported to a maximum level of $100 million by Option Agreements. Based

'upon the Option Agreements, revenue bonds in the amount.of 9

$100,000,000 were sold in July, 1975. The Option Agreements gave each signer (93 Option Participants, consisting of 25 municipalities, 24 districts and 44 electric cooperatives located principally in Washington, Oregon, Idaho and Montana) an option to obtain a share of the Project's output under the Participants' Agreements at least equal to his Final Option Share. Under the Option Agreements a utility had the same absolute obligations to repay the $100 million authorized as he would in the Participants' Agree-ments. However, he was not obligated to execute a Partici-s,._. ..

  • pant's Agreement..

The executed _ Participants' Agreements Mill

~ '

'. . ,1; ,y . . ' . '.1 replace the Option Agreements,and,take over all financial J-

~

c

cm

, . l- 1

, l' .

,i -

obligations. Participants' Agreements have been. executed byd_he-Barticip"_ t for.100% of the output of hfP-4 and wNP-5. _

An_ updated estimate of the total cost of WNP-4

-(current as of May 31, 1976) is:

' l/

(a) Total nuclear production plant costs $ 991,463,000 (b) Transmission and general plant costs 12,327,000 (c) Nuclear fuel inventory cost-2/ for

, first core 91,210,000 Total Estimated Cost $1,095,000,000-Siting, fuel cylce costs, payments to' vendors and preliminary construction expenditures through May 31, 1976, for WNP-4 and WNP-5 are $21,074,000 and $7,896,000 respectively.

Current estimates for WNP-4 and WNP-5 expenditures (including fuel and owners' cost) are as follows:

1 1

  1. 9k[/-(['Includingnet interest durin'g construction, owners

, costs, and allowances for escalation and contingencies.

]j ,2/ Nuclear fuel will be purchased rather than leased.

et .

1 WNP-A . WNP-5

  • Year- Expenditures Expenditures Thru 1976 $ 72,997,000 S 15,624,000

~

1977 108,358,000 -100,442,000 1978 '229,672,000 160,091,000 1979 326,031,000 271,351,000 1980 198,567,000 293,651,000 1981 131,970,000 228,899,000 .

1982 27,405,000 164,426,000 1983 36,359,000 1984 157,000 I I l '

  • .{>,.. e . ~.'.,.

_After._the-necessary Participants ' Agreements .are -executed,..

, financing of WNP-4-and WNP-5 will be continued by the issuance of approximately $2,718,000,000 of tax exempt revenue bonds in series from time to time during the period of construction.

The Supply System plans to issue these bonds in the following approximate amounts and on the following schedules:

Date of Issue Amount I 1977 S300,000,000 n >197 8 - ,.

-3 0 0 , 0 0 0 , 0 0,0 -

...s 1979 450,000,000 1980 600,000,000 1981 750,000,000 1982 318,000,000 a

. /

f -

~

  • ; -l

_ y 3_ .

a Each series of bonds issued,will be,on'a parity witn-othe'r

's . _

=

l-bonds issued. .A schedule summarizing WPPSS construction projects-financing activities through June 15,.1976 is

~

. attached. hereto.

s Y

4 T

S 5

e Y p% e%

  • 4 1

4

-l _

  • s' ^ ^
  • t
  • s a ,% - e r

= *

,em ,

+

r .

+ ',, - -

, , , . 3,2 , , ,

J i- .

h

  1. ~

a #

6 4

' t 4

9 4

4 i

l

- ..._ _ . - . _ , . . _ , . . . _ _ . , _ , _ _ _ _ . . _ _ ,,_ ,, , ,_ _ _ . , , _ . . . _ , , _ _ _ , _ . _. . l

.- . '.}j June 15, 19/6

~

~

~

PROCEEDS EFFECTIVE PROJECT TYPE RATING SALE DATE MATUP.ITY PAR RECEIVED INT. RATE' __

WNP1 . Notes MIG-1;AA 5/22/74 12/15/1976 ~$ 77,000,000 $ 76,722,800 6.050 W fl P 1 Bonds Aaa;AAA 9/18/75 7/01/2017 175,000,000 172,159,750 7.7269 WNP1 Bonds Aaa;AAA 2/04/76 7/01/2017 180,000,000 179,715,934 '6.83734-W tl P 2 Bonds A-1;Aa* 6/26/73 7/01/2012 150,000,000 149,628,930 5.650 ,

W 11 P 2 Bonds . A-1;AA* 7/23/74 7/01/2012 80,000,000 79,864,055 7.2085 W il P 2 Bonds AA;AA

  • 11/'c 6/74 7/01/2012 125,000,000. 124,458,992 7.6667 W !! P 2_ Bonds Aaa;AAA 3/06/75 7/01/2012 125,000,000- 126,813,477 6.7097 WNP2 Bonds Aaa;AAA 6/03/76 7/01/2012 120,000,000 118,845,130 6.634 WNP3 Bonds * .Aaa;AAA 12/03/75 7/01/2018 150,000,000 147,876,742 7.867599 WNP3 Bonds :Aaa;AAA 4/13/76 7/01/2018 100,000,000 99,444',851' 6.481385-W N P 4/5 Bonds 'A-1;A 7/24/75 6/01/1981 100,000,000 99,419,902 7.04099 Total Outstanding $1,382,000,000
  • NOTES RETIRED W N P 4/5 flotes 3/20/74 12/15/1975 2,500,000 2,500,000 4.700 W h P 4/5- Notes ,' MIG-1;A 8/01/74 6/15/1976 15,000,000- 15,056,867 8.007 WNP1 flotes 8/24/72 8/24/1973 1,500,000 1,492,879 2.925 A-1;AA 25,000,000

~

W ?! P 1 Notes 2/15/73 12/15/1975 24,984,325 4.270 WNP2 Notes IA-1;AA 7/01/71 7/01/1974 15,000,000 14,775,100 3.550 W fl P 2 Notes ~A-1 12/15/72 12/15/1974 40,000,000 40,000,401 3.500 W fl P 3 Notes . 5/15/73 .12/17/1973 2,000,000 2,004,026 4.050 WNP3 flotes MIG-1;AA 10/01/73 6/15/1976 29,000,000 29,004,640 '4.368

  • The first series of bonds for WNP-2 were upgraded to AAA ratings by both services subsequent to their issuance.

_ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _