Comment on Proposed GL, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Util Believes That Ability to Justify Actuator Capability by Analysis Should Not Be Restricted to Population of Small ValvesML20083N299 |
Person / Time |
---|
Site: |
Columbia, 05000398 ![Energy Northwest icon.png](/w/images/7/7c/Energy_Northwest_icon.png) |
---|
Issue date: |
04/26/1995 |
---|
From: |
Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
---|
To: |
NRC |
---|
References |
---|
FRN-60FR15799 60FR15799-00013, 60FR15799-13, GO2-95-080, GO2-95-80, NUDOCS 9505230014 |
Download: ML20083N299 (2) |
|
|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20210U4531999-08-12012 August 1999 Comment Opposing Proposed Rule 10CFR50 Re Consideration of Potassium Iodide (Ki) in Emergency Plans.Urges NRC to Retain Current Policy for Ki Usage GO2-97-089, Comment Supporting Proposed Rule 10CFR73 Re Changes to Power Plant Security Requirements1997-05-0707 May 1997 Comment Supporting Proposed Rule 10CFR73 Re Changes to Power Plant Security Requirements ML17292A7151997-02-25025 February 1997 Comment Supporting Proposed Generic Communications, Effectiviness of Ultrasonic Testing Sys in ISI Program. ML20134L3351997-02-14014 February 1997 Order Imposing Civil Monetary Penalty Re Licensee Activities Conducted from 960628-960904 ML17291A9101995-07-0707 July 1995 Comment on Review of NRC Insp Rept Content,Format & Style. NRC Insp Repts Should Provide Balanced Perspective, Reflecting Licensee Strengths & Positive Aspects of Programs & Activities Reviewed GO2-95-080, Comment on Proposed GL, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Util Believes That Ability to Justify Actuator Capability by Analysis Should Not Be Restricted to Population of Small Valves1995-04-26026 April 1995 Comment on Proposed GL, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Util Believes That Ability to Justify Actuator Capability by Analysis Should Not Be Restricted to Population of Small Valves GO2-94-187, Comment Opposing Proposed Rule 10CFR26 Re Consideration of Changes to FFD Requirements1994-08-0808 August 1994 Comment Opposing Proposed Rule 10CFR26 Re Consideration of Changes to FFD Requirements ML20058L9561993-07-26026 July 1993 Decommissioning Trust,Consisting of Asset Summary for Period Ending 930630,asset Summary Adjusted for Accurals for Period Ending 930630 & List of Assets as of 930630 ML20045D7551993-06-18018 June 1993 Comment on Proposed Rule 10CFR26 Re Mods to fitness-for-duty Program Requirements.Supports Rule W/Listed Exceptions ML20044E1511993-05-30030 May 1993 Comment Supporting Petition for Rulemaking PRM-50-58 Re VEPCO Petition to Change Frequency of Emergency Planning Exercises from Annual to Biennial ML17290A3901993-05-21021 May 1993 Comments on Proposed Insp Procedure 38703, Commercial Grade Procurement Insp. ML17289A9151992-10-0909 October 1992 Comment on Proposed Changes to SALP Program.Util Supports Comments Being Filed by NUMARC & Legal Firm of Winston & Strawn GO2-92-164, Comment on Proposed Rule 10CFR50 Re Loss of All Alternating Current Power & Draft Reg Guide 1.9,task DG-1021.Supports Detailed Comments Submitted by Numarc,As Representing Licensee Views1992-07-10010 July 1992 Comment on Proposed Rule 10CFR50 Re Loss of All Alternating Current Power & Draft Reg Guide 1.9,task DG-1021.Supports Detailed Comments Submitted by Numarc,As Representing Licensee Views GO2-92-136, Comment Supporting Proposed Rules 10CFR19 & 20 Re Extension of Implementation Date Concerning 10CFR201992-06-0404 June 1992 Comment Supporting Proposed Rules 10CFR19 & 20 Re Extension of Implementation Date Concerning 10CFR20 ML20091D1631992-04-0303 April 1992 Comment Opposing Proposed Rule 10CFR2 Re Policy & Procedure for Enforcement Actions.Concerned That Policy Seems to Be Creating New Requirements Through Examples Given ML20091Q8661992-01-31031 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys,10CFR50.72 & 50.73,Clarification of NRC Sys & Guidelines for Reporting ML17289A2931992-01-24024 January 1992 Comment on Draft Reg Guide Task DG-8007 (Proposed Rev 1 to Reg Guide 8.7) Re Instructions for Recording & Reporting Occupational Radiation Exposure Data ML17289A2541992-01-0606 January 1992 Comment on Draft Reg Guide Task DG-8004 Re Radiation Protection Programs.Reg Guide Provides Good Guidance for Maintaining Effective Radiation Protection Programs Aimed at Achieving Occupational Doses That Are ALARA GO2-91-103, Comment Opposing Proposed Rules 10CFR71,170 & 171, Rev of Fee Schedules;100% Fee Recovery1991-05-16016 May 1991 Comment Opposing Proposed Rules 10CFR71,170 & 171, Rev of Fee Schedules;100% Fee Recovery GO2-90-181, Comment Opposing Proposed Rule 10CFR26 Re fitness-for-duty. Rev Would Restrict Licensee from Taking Appropriate Action on Preliminary Positive Test1990-10-30030 October 1990 Comment Opposing Proposed Rule 10CFR26 Re fitness-for-duty. Rev Would Restrict Licensee from Taking Appropriate Action on Preliminary Positive Test ML17285B3701990-07-0505 July 1990 Comment Supporting Petition for Rulemaking PRM-50-55 Re Frequency of FSAR Revs,Per 10CFR50.71(e)(4) Requirements GO2-89-115, Comment Supporting Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Plant Structures,Sys & Components. Util Accepts NUMARC Comments1989-07-0606 July 1989 Comment Supporting Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Plant Structures,Sys & Components. Util Accepts NUMARC Comments ML20247N7531988-07-28028 July 1988 Petition for Rulemaking PRM-50-53 Requesting NRC Action to Review Undue Risk Posed by BWR Thermal Hydraulic Instability.Nrr Should Issue Order Requiring All GE BWRs to Be Placed in Cold Shutdown for Stated Reasons ML17279A8041987-10-19019 October 1987 Endorsement 28 to Nelia Policy NF-270 ML20098C8851984-08-24024 August 1984 Undated marked-up Transcript of Jj Stein Testimony Re Util Financial Qualifications to Design & Construct Nuclear Reactor ML20082K0471983-10-14014 October 1983 Show Cause Petition Requesting Revocation of CP & Denial of OL ML20082K0301983-10-13013 October 1983 Affidavit of Sandler in Support of Coalition for Safe Power 831014 Show Cause Petition ML20072N4411983-07-0808 July 1983 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20072H2981983-03-25025 March 1983 Brief in Opposition to Coalition for Safe Power Appeal from ASLB 830222 Memorandum & Order Dismissing 820223 Petition to Intervene.Petitioner Failed to Particularize & Support Contentions.Certificate of Svc Encl ML20069D2761983-03-10010 March 1983 Notice of Appeal of ASLB 830222 Memorandum & Order on Issue of Util Delay ML20069D3441983-03-10010 March 1983 Brief Supporting Appeal from ASLB 830222 Memorandum & Order. ASLB Erred in Concluding Petitioner Failed to Show Dilatory Conduct by Util & Was Not Entitled to Hearing on CP Extension.Certificate of Svc Encl ML20070M6521983-01-24024 January 1983 Response in Opposition to Coalition for Safe Power 820223 Request for Hearing on Amend to CPPR-93.Petitioner Failed to Establish Interest in Proceeding or How Interest Will Be Affected by Proceeding.Certificate of Svc Encl ML20028C7851983-01-10010 January 1983 Suppl to Request for Hearing & Petition for Leave to Intervene,Listing Contentions.Certificate of Svc Encl ML20070J0401982-12-22022 December 1982 Response Supporting Coalition for Safe Power 821209 Motion for 1-wk Delay of Prehearing Conference Scheduled for 830119-20.Applicant Does Not Concede That Basis for Request Constitutes Good Cause.Certificate of Svc Encl ML20070D0001982-12-0909 December 1982 Motion for Delay of 830119 & 20 Prehearing Conference. Schedule Burdensome Due to Two Major Holiday Periods.Four Days of Preparation Lost.Certificate of Svc Encl ML20049J2331982-03-10010 March 1982 Answer Opposing Coalition for Safe Power 820223 Request for Hearing on CP Amend.Cp Amend Involves No Significant Hazards Consideration.Alternatively,Petitioner Failed to Meet Interest,Affects & Aspect Stds.Certificate of Svc Encl ML20049H5231982-02-22022 February 1982 Requests for Public Hearing Re Order Extending Const Completion Date.States Interest & Specific Aspects & Contentions Affecting Petitioners.Certificate of Svc Encl ML20009E3061981-07-23023 July 1981 Response Opposing Porter County Chapter Intervenors' 810519 Fourth Request for Production of Documents.Request Is W/O Merit & Should Be Denied ML20098D0881980-04-25025 April 1980 MOU Between WPPSS & Doe,Acting by & Through BPA Re Roles & Responsibilities Under Project Agreements Concerning Const & Operation of Net Billed Projects ML17272A8861980-02-0606 February 1980 Transcript of 800206 Briefing to NRC in Bethesda,Md Re Sacrificial Shield Wall,Pipe Whip Restraints & Related Structures.Pp 1A-122 ML19261C0571979-02-15015 February 1979 Util Opposes Petitioners Darby,Garrett & Hanford Conversion Project Addl Contention & Legal Argument.Intervention Petition Should Be Disposed of on Basis of Existing Record as Previously Stipulated.Certificate of Svc Encl ML19274D7801979-02-0606 February 1979 Applicant'S Proposed Corrections to Transcript of 790125 Prehearing Conference.Certificate of Svc Encl ML19263C4481979-02-0101 February 1979 Addl Contention & Legal Argument Pursuant to ASLB 790125 Permission.Contends Inadequate Assessment of Safety Risks. Certificate of Svc Encl ML17272A2691979-01-19019 January 1979 Applicant Answer in Opposition to Petitioners Darby Garrett & Hanford Conversion Project Request for Waiver of 10CFR2.708(b).W/encl Certificate of Svc ML19261A6841979-01-10010 January 1979 Requests Waiver of double-spacing Requirement for Filed Documents Because of Added Expense.Assures That Documents Will Be Legible.W/Encl Certificate of Svc ML19261A6791979-01-10010 January 1979 Second Amended Petition to Intervene,Supplementary Except Where Noted,To 781115 Petition.Addresses Contentions Re Need for Power,Alternatives.Notice of Withdrawal,Affidavit & Certificate of Svc Encl ML17272A2231978-12-15015 December 1978 Applicant'S Answer in Opposition to Amended Petition for Leave to Intervene Submitted by SM Garrett,H Vozenilek & Hanford Conversion Project.Asserts That Latter Has No Legal Interest in Proceedings.Certificate of Svc Encl ML20062G4631978-12-14014 December 1978 NRC Staff'S Response to Amended Petition to Intervene Submitted by SM Garrett,H Vozenilek & Manford Conversion Proj.Asserts That Only Manford Conversion Proj Has Met Interest Criteria of 10CFR2.714.Cert of Svc Encl ML20062E0601978-11-15015 November 1978 Memo in Support of Amended Petition for Leave to Intervene Presents Evidence Dev Since 1973 & Other Info Not Considered in Those Constr Permit Proc.Cert of Svc Plus Insert to Amended Petition for Leave to Intervene. Encl ML20062E0581978-11-15015 November 1978 Amended Petition for Leave to Intervene. Indicates That Intervenors Have Evidence That Has Dev Since 1973 & Other Info Not Considered in the Constr Permit Proc Held in 1973. W/Encl 781107 Appl for Membership in Hanford 1999-08-12
[Table view] Category:PUBLIC COMMENTS ON PROPOSED RULES & PETITIONS FOR
MONTHYEARML20210U4531999-08-12012 August 1999 Comment Opposing Proposed Rule 10CFR50 Re Consideration of Potassium Iodide (Ki) in Emergency Plans.Urges NRC to Retain Current Policy for Ki Usage GO2-97-089, Comment Supporting Proposed Rule 10CFR73 Re Changes to Power Plant Security Requirements1997-05-0707 May 1997 Comment Supporting Proposed Rule 10CFR73 Re Changes to Power Plant Security Requirements ML17292A7151997-02-25025 February 1997 Comment Supporting Proposed Generic Communications, Effectiviness of Ultrasonic Testing Sys in ISI Program. ML17291A9101995-07-0707 July 1995 Comment on Review of NRC Insp Rept Content,Format & Style. NRC Insp Repts Should Provide Balanced Perspective, Reflecting Licensee Strengths & Positive Aspects of Programs & Activities Reviewed GO2-95-080, Comment on Proposed GL, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Util Believes That Ability to Justify Actuator Capability by Analysis Should Not Be Restricted to Population of Small Valves1995-04-26026 April 1995 Comment on Proposed GL, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Util Believes That Ability to Justify Actuator Capability by Analysis Should Not Be Restricted to Population of Small Valves GO2-94-187, Comment Opposing Proposed Rule 10CFR26 Re Consideration of Changes to FFD Requirements1994-08-0808 August 1994 Comment Opposing Proposed Rule 10CFR26 Re Consideration of Changes to FFD Requirements ML20045D7551993-06-18018 June 1993 Comment on Proposed Rule 10CFR26 Re Mods to fitness-for-duty Program Requirements.Supports Rule W/Listed Exceptions ML20044E1511993-05-30030 May 1993 Comment Supporting Petition for Rulemaking PRM-50-58 Re VEPCO Petition to Change Frequency of Emergency Planning Exercises from Annual to Biennial ML17290A3901993-05-21021 May 1993 Comments on Proposed Insp Procedure 38703, Commercial Grade Procurement Insp. ML17289A9151992-10-0909 October 1992 Comment on Proposed Changes to SALP Program.Util Supports Comments Being Filed by NUMARC & Legal Firm of Winston & Strawn GO2-92-164, Comment on Proposed Rule 10CFR50 Re Loss of All Alternating Current Power & Draft Reg Guide 1.9,task DG-1021.Supports Detailed Comments Submitted by Numarc,As Representing Licensee Views1992-07-10010 July 1992 Comment on Proposed Rule 10CFR50 Re Loss of All Alternating Current Power & Draft Reg Guide 1.9,task DG-1021.Supports Detailed Comments Submitted by Numarc,As Representing Licensee Views GO2-92-136, Comment Supporting Proposed Rules 10CFR19 & 20 Re Extension of Implementation Date Concerning 10CFR201992-06-0404 June 1992 Comment Supporting Proposed Rules 10CFR19 & 20 Re Extension of Implementation Date Concerning 10CFR20 ML20091D1631992-04-0303 April 1992 Comment Opposing Proposed Rule 10CFR2 Re Policy & Procedure for Enforcement Actions.Concerned That Policy Seems to Be Creating New Requirements Through Examples Given ML20091Q8661992-01-31031 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys,10CFR50.72 & 50.73,Clarification of NRC Sys & Guidelines for Reporting ML17289A2931992-01-24024 January 1992 Comment on Draft Reg Guide Task DG-8007 (Proposed Rev 1 to Reg Guide 8.7) Re Instructions for Recording & Reporting Occupational Radiation Exposure Data ML17289A2541992-01-0606 January 1992 Comment on Draft Reg Guide Task DG-8004 Re Radiation Protection Programs.Reg Guide Provides Good Guidance for Maintaining Effective Radiation Protection Programs Aimed at Achieving Occupational Doses That Are ALARA GO2-91-103, Comment Opposing Proposed Rules 10CFR71,170 & 171, Rev of Fee Schedules;100% Fee Recovery1991-05-16016 May 1991 Comment Opposing Proposed Rules 10CFR71,170 & 171, Rev of Fee Schedules;100% Fee Recovery GO2-90-181, Comment Opposing Proposed Rule 10CFR26 Re fitness-for-duty. Rev Would Restrict Licensee from Taking Appropriate Action on Preliminary Positive Test1990-10-30030 October 1990 Comment Opposing Proposed Rule 10CFR26 Re fitness-for-duty. Rev Would Restrict Licensee from Taking Appropriate Action on Preliminary Positive Test ML17285B3701990-07-0505 July 1990 Comment Supporting Petition for Rulemaking PRM-50-55 Re Frequency of FSAR Revs,Per 10CFR50.71(e)(4) Requirements GO2-89-115, Comment Supporting Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Plant Structures,Sys & Components. Util Accepts NUMARC Comments1989-07-0606 July 1989 Comment Supporting Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Plant Structures,Sys & Components. Util Accepts NUMARC Comments 1999-08-12
[Table view] |
Text
- _ - _ _ _ _ _ _ _
e .a oh r
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.o. Box 968
$ April 26,1995 GO2-95-080 13 11008 Chief
~D%3 M\S5 Rules Review and Directives Branch U. S. Nuclear Regulatory Commission gNi l
Washington, DC 20555 g
Dear Sir:
e l l !:?: w
Subject:
COMMENTS ON PROPOSED GENERIC LETTER; PRESSURE [OCKING j AND TIIERMAL BINDING OF SAFETY-RELATED POWER-OPERATED ;
GATE VALVES (60 FR 15799) r W g' m
L. N The proposed Generic Letter is intended to ensure that licensees have performed or 'will perform evaluations, analyses and/or corrective actions to ensure that safety-related power-operated gate valves that may be susceptible to pressure locking or thermal binding are capable of performing ,
their safety functions. The Nuclear Regulatory Commission has solicited comments regarding both the technical and regulatory aspects of the proposed Generic Letter.
The Supply System has reviewed the proposed Generic Letter and respectfully submits the following comments:
The proposed Generic Letter section " Requested Actions:"
- Item 1, would require the addressee of the Generic Letter to perform and complete an l evaluation of the operational configurations of all safety-related power-operated gate valves l within 60 days of the Generic Letter. The Supply System recommends that this completion period be extended from 60 days to 120 days.
- Item 2, would require the addressee to implement and complete the guidance provided to complete an evaluation and further analyses, including corrective actions, within 180 days of the date of the Generic Letter. The Supply System recommends that this completion period be extended to one year. 4 These extensions are recommended to provide additional time for the industry and regulatory ]
agencies to refine the criteria for thermal binding susceptibility and operability criteria. i 1
220041 0 9505230014 950426 :
PDR I&E l HISC PDR
4 b&
Page Two COMMENTS ON PROPOSED GENERIC LETTER; PRESSURE LOCKING AND THERMAL BINDING OF SAFETY-RELATED POWER-OPERATED GATE VALVES (60 FR 15799)
Additionally, Attachment 2 of the proposed Generic Letter, Item 1, indicates that the staff will consider addressee justification for adequate actuator capability by analysis for small valves.
The Supply System believes that the ability to justify actuator capability by analysis should not be restricted to the population of "small valves."
The Supply System appreciates the opportunity to review and comment on the proposed Generic Ixtter. Please contact me or Mr. Doug Coleman at (509) 377-4342 if you have any questions or would like to discuss our comments further.
Sincerely, deu JV Parrish (Mail Drop 1023)
Vice-President, Nuclear Operations cc: C Callaway - NEI