. Washington Public Power Supply System
('; y A JOINT OPERATING AGENCY D
rn P. O. Box 968 3000 Gro WASHINGTON WAY R;CHL AND. WASHINGTON,,351 PHONE ( SC.9 ) 94C 9681 July 22, 1974 Docket No. 50-460 50-513 Mr. Angelo Giambusso sp' IO'
+ NT Deputy Director for Resctor Projects.
NEC!!d0 %p a"
Directorate of Licensina Office of Regulation ts.
AUG G bg~ '[I. ;
~
U. S. Atomic Energy Commission 1-;
Washington, D. C.
20545 u.4,m = g n; j;,l
- t.,
Subject:
WPPSS NUCLEAR PROJECT NO. 1
@c, E~dW.
.W
.y
\\@, Iih @/
~'
AMENDMENT 1 TO THE FORMAL APPLICATION
Dear Mr. Giambusso:
In accordance with ICCFR Part 50, Wasnington Public Power Supply System
("WPPSS") herewith submits 48 copies of Amendment i;o.1 to the WPPSS l:ueieir Project No.1 ("WiP-1") formal application (i.e., the 10CFR 50.33 and 50.F/
information) fcr Class 103 licenses to construct and operate the UNP-i 10:ility.
In:tru:ticr.: fe: ir.007er.'th:2 the F *'d M b+ *M A M io tim P
are included with the amendmeni..
The purpose of Amendment No.1 is to include proposed WPPSS Nuclear Froien No. 4 ("WNP-4") in the application for concurrent AEC review with hM?-1.
I r.
this regard, the Executive Committee of WPFSS adopted a plan and system resolution on ' July 12, 1974, authorizing the sut.nission of this emendment to address the construction of WHP-4 in conjunction with and at the same site as NNP-1, as relocated.
On July 15, 1974, we submitted Amendment No. 1 to the Environmental Report
("ER") which revised the ER to provide revised information occasioned by the relocation of E;P-1 and the addition of its " twin", WNP-4.
Likewise, the Preliminary Safety Analysis Rep (ort ("PSAR") was amended on l'a 31, 1974 (Amendment No. 7) and July 1, 1974 Amendment No. 8) to address the relocation of WNP-1 and toe construction of WNP-4 in conjunction with W:iP-1.
The remaining amendnent of the PSAR relative to relocation and the addition;l unit will be filed on or about August 8,1974.
As described in the PSAR, the only systems which will be shared between WSP-1 and WNP-4 are the off-site electrical system, the cooling tower make-up and blowdown systems and the reteorological monitoring system (also to be shared with WNP-2 (formerly Hanford 2)).
8409270296 840824 PDR FOIA COHEN 84-603 PDR
~
l h
k STATE. 0F WASHING 10N
)
).ss COUNTY OF BENTON
)
J. J. STEIN, Seing first duly sworn, deposes and says:
That he is the Managing Director of the WASHINGTON FU3LIC POWE: SUPPLY-SYSTEM, the applicant herein;. Tha t he is authorized to sube.iT the foregoing letter
-dated July 22, 1974, JJ Stein to A.'Giambusso on behalf of said applicent; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.
DATED:
2 S.-
1974
/
- 5. x. Ci G --
J J.J.
Elf Subscribed and sworn to before me this 2:4 day of_ fl
- 1974,
.V y
6C Npt nd/for the State o
shingtgn res ing at My C
.ission expiros:
32 /[7Y ex v
[/
l
A. Giambusso
(-
Page-Two We hereby request-that a docket number be issued for WNP-4, and that the WNP-1 and WNP-4 projects be reviewed concurrently.
Very truly yours, pWO
\\
J.
J.jJ.'4TEIN Managing Director JJS:AGH:mac cc:
PC Otness - BPA GM Olds - B&W JB Knotts - Conner, Hadlock & Knotts Attachment s