Forwards Amend 1 to Application for Ol,To Include Proposed Unit 4 in Application for AEC Review Concurrent W/Unit 1
ML20098C957
Person / Time
Site: 05000000, Washington Public Power Supply System
Issue date: 07/22/1974
From: Stein J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20093C821 List: ... further results
References
CON-WPPSS-107A, FOIA-84-603 NUDOCS 8409270296
Download: ML20098C957 (3)


Text

E "D

uQ

. Washington Public Power Supply System

('; y A JOINT OPERATING AGENCY D

rn P. O. Box 968 3000 Gro WASHINGTON WAY R;CHL AND. WASHINGTON,,351 PHONE ( SC.9 ) 94C 9681 July 22, 1974 Docket No. 50-460 50-513 Mr. Angelo Giambusso sp' IO'

+ NT Deputy Director for Resctor Projects.

NEC!!d0 %p a"

Directorate of Licensina Office of Regulation ts.

AUG G bg~ '[I. ;

~

U. S. Atomic Energy Commission 1-;

Washington, D. C.

20545 u.4,m = g n; j;,l

t.,

Subject:

WPPSS NUCLEAR PROJECT NO. 1

@c, E~dW.

.W

.y

\\@, Iih @/

~'

AMENDMENT 1 TO THE FORMAL APPLICATION

Dear Mr. Giambusso:

In accordance with ICCFR Part 50, Wasnington Public Power Supply System

("WPPSS") herewith submits 48 copies of Amendment i;o.1 to the WPPSS l:ueieir Project No.1 ("WiP-1") formal application (i.e., the 10CFR 50.33 and 50.F/

information) fcr Class 103 licenses to construct and operate the UNP-i 10:ility.

In:tru:ticr.: fe: ir.007er.'th:2 the F *'d M b+ *M A M io tim P

are included with the amendmeni..

The purpose of Amendment No.1 is to include proposed WPPSS Nuclear Froien No. 4 ("WNP-4") in the application for concurrent AEC review with hM?-1.

I r.

this regard, the Executive Committee of WPFSS adopted a plan and system resolution on ' July 12, 1974, authorizing the sut.nission of this emendment to address the construction of WHP-4 in conjunction with and at the same site as NNP-1, as relocated.

On July 15, 1974, we submitted Amendment No. 1 to the Environmental Report

("ER") which revised the ER to provide revised information occasioned by the relocation of E;P-1 and the addition of its " twin", WNP-4.

Likewise, the Preliminary Safety Analysis Rep (ort ("PSAR") was amended on l'a 31, 1974 (Amendment No. 7) and July 1, 1974 Amendment No. 8) to address the relocation of WNP-1 and toe construction of WNP-4 in conjunction with W:iP-1.

The remaining amendnent of the PSAR relative to relocation and the addition;l unit will be filed on or about August 8,1974.

As described in the PSAR, the only systems which will be shared between WSP-1 and WNP-4 are the off-site electrical system, the cooling tower make-up and blowdown systems and the reteorological monitoring system (also to be shared with WNP-2 (formerly Hanford 2)).

8409270296 840824 PDR FOIA COHEN 84-603 PDR

~

l h

k STATE. 0F WASHING 10N

)

).ss COUNTY OF BENTON

)

J. J. STEIN, Seing first duly sworn, deposes and says:

That he is the Managing Director of the WASHINGTON FU3LIC POWE: SUPPLY-SYSTEM, the applicant herein;. Tha t he is authorized to sube.iT the foregoing letter

-dated July 22, 1974, JJ Stein to A.'Giambusso on behalf of said applicent; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.

DATED:

2 S.-

1974

/

5. x. Ci G --

J J.J.

Elf Subscribed and sworn to before me this 2:4 day of_ fl

1974,

.V y

6C Npt nd/for the State o

shingtgn res ing at My C

.ission expiros:

32 /[7Y ex v

[/

l

A. Giambusso

(-

Page-Two We hereby request-that a docket number be issued for WNP-4, and that the WNP-1 and WNP-4 projects be reviewed concurrently.

Very truly yours, pWO

\\

J.

J.jJ.'4TEIN Managing Director JJS:AGH:mac cc:

PC Otness - BPA GM Olds - B&W JB Knotts - Conner, Hadlock & Knotts Attachment s

i 4

O 4

?

L s

4

)