ML20078J564
ML20078J564 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 10/12/1983 |
From: | Aulick D CAROLINA POWER & LIGHT CO., SHAW, PITTMAN, POTTS & TROWBRIDGE |
To: | Bright G, Carpenter J, Kelley J Atomic Safety and Licensing Board Panel |
Shared Package | |
ML20078J565 | List: |
References | |
ISSUANCES-OL, NUDOCS 8310170543 | |
Download: ML20078J564 (1) | |
Similar Documents at Harris | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18017A9241999-10-15015 October 1999
[Table view]Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20216G3501999-09-29029 September 1999 Confirms Conversations Re NRC Staff Voluntary Response to Orange County Discovery Requests.Staff Will Voluntarily Answer Discovery Requests & Will Not Waive Any Objection or Privilege Under NRC Regulations.Related Correspondence ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML20212H7741999-06-23023 June 1999 Responds to Re Petition Filed by Orange County Board of Commissioners Re Proposed Expansion of Sf Storage Capacity at Shearon Harris Npp.Public Meeting Will Be Held at Later Date.With Certificate of Svc.Served on 990624 ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML20206R2511999-05-19019 May 1999 Responds to Addressed to Chairman Jackson Requesting That NRC Grant Standing to Orange County Board of Commissioners in Shearon Harris Proceeding Currently Before Board.With Certificate of Svc.Served on 990519 ML20206Q5281999-05-17017 May 1999 Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9601999-05-11011 May 1999 Forwards Resolution Adopted by Carrboro Board of Aldermen at 990504 Meeting.Resolution Expresses Town Concern Re Util Plans to Double high-level Nuclear Waste Storage at Shnpp ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl IR 05000400/19982011999-04-12012 April 1999 Discusses Safeguards Insp Rept 50-400/98-201 (Operational Safeguards Response Evaluation) on 980908-11.No Violations Noted.Licensee Performance During Evaluation Indicated Excellent Overall Contingency Response Capability 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARML18017A9241999-10-15015 October 1999
[Table view]Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl ML18016A8911999-04-0505 April 1999 Forwards non-proprietary App 4A,pages 20-25 & Proprietary Page 4-6 to re-issued Rev 3 of Holtec International Licensing Rept HI-971760.Pages Were Inadvertently Omitted from Reissued Rept.Proprietary Page 4-6 Withheld ML18016A8891999-04-0101 April 1999 Forwards Rev 99-1 to Plant EALs for NRC Review & Approval, Per 10CFR50,App E.Encl Provides Comparison of Currently Approved EALs & Proposed Rev 99-01.Approval of EALs Prior to June 1999,requested.With Four Oversize Drawings ML18016A8811999-03-31031 March 1999 Responds to NRC 990301 Ltr Re Violations Noted in Insp Rept 50-400/98-11.Corrective Actions:Post Trip/Safeguards Actuation Rept for 981023,RT Was Corrected,Required Reviews Completed & Approval Obtained on 990219 ML18016A8671999-03-19019 March 1999 Submits Response to RAI Re Spent Fuel Pool Water Level & Revised Fuel Handling Accident Analyses,Per 990317 Telcon with NRC ML18016A8631999-03-19019 March 1999 Forwards Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept, IAW 10CFR55.45(b)(5)(ii). NRC Form 474 & Required Info Re Simulator Performance Test Results & Schedules Also Encl ML18016A8691999-03-18018 March 1999 Forwards Resolution Adopted by Lee County,North Carolina Board of Commissioners Re Proposed Expansion of high-level Radioactive Waste Storage Facilities at Carolina Power & Light Shearon Harris Nuclear Power Plant ML18016A8511999-03-15015 March 1999 Forwards Proprietary & non-proprietary Version of Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFPs 'C' & 'D'. Repts Are Reissued to Reflect Reduction in Proprietary Info.Proprietary Info Withheld ML18016A8601999-03-15015 March 1999 Informs NRC of Mod to Commitment for Hnp,Re Comprehensive Review of Implementation of TS Sr.Upon Completion of Listed Reviews,Surveillance Procedure Review Project Will Be Considered Complete 1999-09-08 Category:LEGAL/LAW FIRM TO NRC MONTHYEARML18009A5741990-06-13013 June 1990
[Table view]Provides Progress Rept of Arbitration Between CP&L & North Carolina Eastern Municipal Power Agency.Arbitration Shows Allegations Made in Power Agency Complaint as Lacking in Merit & Requests Dismissal of Complaint ML18009A5731990-06-12012 June 1990 Notifies That Arbitrator Issued Award in Proceeding & Advises of Eastern Municipal Power Agency Withdrawal of Request for Initiation of Informal Complaint Procedures Re Antitrust License Conditions Contained in License NPF-63 ML18022A7871990-02-23023 February 1990 Submits Info in Response to 900122 Request Re Initiation of Informal Complaint Procedures Per Section 5.3.2 of NUREG-0970.Util Conduct Violates Commmitment 4 in Antitrust License Conditions.Discovery Procedures Completed ML18005B0101989-08-0404 August 1989 Requests That Commission Dismiss North Carolina Eastern Municipal Power Agency Complaint Re CP&L Violation of Antitrust Conditions on Basis That Power Agency Has Pursued Claim in Multiple Forums & Reasons in CP&L 890615 Ltr ML18005B0131989-08-0303 August 1989 Requests Commencement of Informal Complaint Procedures Per Section 5.3.2 of NUREG-0970 for Listed Reasons ML18005A9531989-06-22022 June 1989 Presents Licensee Request for Commencement of Informal Complaint Procedures Under Section 5.3.2 of NUREG-0970. Recommends That Util Request Be Denied & Parties Have Opportunity to Meet W/Commission to Discuss Util Complaint ML18005A9321989-05-18018 May 1989 Requests Commencement of Informal Complaint Procedures Under Section 5.3.2 of NUREG-0970.Util Requests Notification of All Meetings Betweeen NRC & Complaintant ML18022A7201989-05-0505 May 1989 Requests Commencement of Informal Complaint Procedures Per Section 5.3.2 of NUREG-0970.Related Info Encl ML20215K9211986-10-0808 October 1986 FOIA Request for Documents Re Investigation of Safety Concerns Raised by Jj Mcweeney Re Facility ML18004B5811986-10-0707 October 1986 Forwards Certificate N-112 to Nelia Policy 1 & Certificate M-112 to Maelu Policy M-112 ML20206S2701986-09-17017 September 1986 Notifies of Address Change Effective on 860927.Requests Address on Encl List of Dockets Be Changed ML20206U8651986-07-0808 July 1986 Forwards Chatham County Board of Commissioners Resolution Endorsing Emergency Response Plan on 860707.Resolution Suppls Applicant Response to Intervenors Request to Continue Stay Indefinitely.Svc List Encl ML20206J2531986-06-24024 June 1986 Alerts Commission That Applicant Considers Coalition for Alternatives to Shearon Harris 860609 Petition for Leave Before Aslab & That Applicant Filed Response to Petition W/Aslab.Svc List Encl ML20198L5871986-05-29029 May 1986 Forwards Board of Commissioners of Chatham County 860527 Resolution Rescinding Prior Approval of Emergency Response Plan Pending Further Review of Unresolved Issues.Svc List Encl.Related Correspondence ML20137Z5791986-03-11011 March 1986 Requests That Gf Trowbridge Be Replaced as Addressee for NRC Correspondence in Accordance W/Listed Client Facility & Designated Addressee ML20141N2221986-02-28028 February 1986 Forwards Us Court of Appeals 810929 Per Curiam Order, Dismissing Util Petition for Review of Rule on Emergency Planning.Applicants May Wish to Discuss Order at 860304-05 Hearings.Svc List Encl.Related Correspondence ML20137N0721986-01-23023 January 1986 Informs That Author Will Present Argument on Behalf of Applicant at 860205 Oral Argument on Intervenor Appeal from 850820 Partial Initial Decision on Safety Contentions. Svc List Encl ML20137J0111986-01-13013 January 1986 Forwards Listed Documents Re Eddleman Contention EPX-8 Expounding on & Modifying Applicant 851220 Response to Eddleman Interrogatories.Motion for Summary Disposition of EPX-2 Being Filed Separately ML20136J4731986-01-0808 January 1986 Completes 860103 Partial Response to 851226 Order for Info Re Intensity & Duration of siren-produced Levels within Plant Emergency Planning Zone.Certificate of Svc Encl. Related Correspondence ML20141F7601986-01-0303 January 1986 Forwards Thunderbolt Siren Directivity Pattern Dbc at 100 Ft,650 Hz, Used in Preparation of Testimony on Eddleman Contention 57-C-3,in Response to ASLB 851226 Order. Svc List Encl.Related Correspondence ML20138B3781985-12-0909 December 1985 Forwards Applicant Proposed Findings of Fact & Conclusions of Law on Eddleman 57-C-3 (Night Time Notification) Re Collective OL for Facility ML20137Q1261985-12-0202 December 1985 Responds to ASLB Re Generic Safety Problems Involving Emergency Notification of Residents in Plume Zones.Ltr Based Exclusively on Evidentiary Record & Departs from NRC Process.Svc List Encl ML20136J0721985-11-20020 November 1985 Responds to IE Info Notices 85-42 & 85-81 in Response to Joint Intervenors Appeal of ASLB Ruling in Favor of Applicant on Contention IV Re Use of Tlds.Svc List,Info Notices & Board Notification 85-083 Encl ML20205G5301985-11-0808 November 1985 Confirms That Util Provided Exhibit 48 (EPA-600/1-77-010) & Exhibit 49 (Siren Map) Provided to Court Reporter. Documents Also Provided to ASLB & Other Parties Per Applicant .Svc List Encl ML20205G8371985-11-0707 November 1985 Forwards Technical Svc Lab Presenting Results of Eddy Current Exam of Sample of Steam Generator Tubes & Replacement Pages 19-22 for Applicant Testimony of HR Banks & Others.W/Certificate of Svc.Related Correspondence ML20205G5431985-11-0101 November 1985 Requests Amend to to Facilitate Planning for Hearing on Conservation Council of North Carolina Contention WB-3 Resuming 851112.Dupont Will Be Applicant First Witness. Svc List Encl.Related Correspondence ML20133J1741985-10-16016 October 1985 Forwards Form 8-K,dtd 850924,filed W/Securities & Exchange Commission by Util.Svc List Encl.Related Correspondence ML20132B2351985-09-23023 September 1985 Forwards Direct Testimony Applicant Will Present at 850930 Hearing on Drug Use Contention,Per ASLB 850918 Order.List of Testimony & Exhibits Encl.Certificate of Svc Encl.Related Correspondence ML20134E8571985-08-16016 August 1985 Advises That Author Will Present Argument on Behalf of Applicant on 850828 Re Intervenor Appeal from ASLB 850220 Partial Initial Decision on Environ Contentions.Svc List Encl ML20126K8561985-07-26026 July 1985 Discusses Util Response to W Eddleman 850619 Request That Documents Be Made Part of Record in Proceeding,Per Board 850715 Order.Util Application for Withholding Untimely by Terms of 10CFR2.790.Related Correspondence ML20127B5231985-06-19019 June 1985 Requests That Documents Identified in Discovery on Contention 41-G Re Harassment Be Made Part of Record in Proceeding for Possible Consideration on Appeal.Copy of Documents Also Requested.Related Correspondence ML20126A0681985-06-10010 June 1985 Forwards Testimony of Jf Myers & Ds Mileti on Epj Contention 4(b) Re Role Strain in Adult School Bus Drivers. Applicants Do Not Plan to Offer Any Exhibits in Response to Contention.Certificate of Svc Encl ML20127M6261985-05-20020 May 1985 Forwards 840830 Final Rept of Facility Qa/Qc Const Inspector Review Panel & Four Documents Re Allegation of Harassment by Qa/Qc Inspector in Support of ASLB Denial of Eddleman 850507 Motion.W/O Encl.Svc List Encl.Related Correspondence ML20117J1501985-05-13013 May 1985 Informs That W Eddleman Will Not Be Filing Opposition to Motion for Summary Disposition of Eddleman 213.Eddleman 213 & EPT-2,as Discussed in ,Are Now Ripe for Summary Disposition.Svc List Encl.Related Correspondence ML20117H4181985-05-0909 May 1985 Notifies That Chapel Hill Anti-Nuclear Group Effort Will Not File Response to Jf Myers 850425 Supplemental Affidavit Re EPJ-2.Staff/FEMA Position on Affidavit Unchanged.Notice Authorized by Parties.Svc List Encl.Related Correspondence ML20116H5841985-04-29029 April 1985 Notifies of Mod to Evidence Presented in Response to Eddleman Contention 41 Re Pipe Hanger Welding.Verification of Pipe Hanger Design Compliance Will Be Performed by Craft Supervisors ML20116C9951985-04-25025 April 1985 Forwards Supplemental Affidavit of Jf Myers Re Recent Change to Provisions for Official Transportation Assistance for Persons in Emergency Planning Zone.Related Correspondence ML20115G4981985-04-18018 April 1985 Requests That ASLB Defer Summary Deposition Ruling on EPJ-2 Pending Submittal of Amended Affidavit from State of Nc Explaining Policy Decision Re Pickup Routes for Areas of Harris Plume Emergency Planning Zone.Svc List Encl ML20112C7801985-03-18018 March 1985 Amends Concluding Paragraph of Re Status of Pending Emergency Planning Summary Disposition Motions. Eddleman Response to Applicant Summary Disposition Motions on Contentions 30,57-C-10,213-a & 215 Received.W/Svc List ML20112B6321985-03-15015 March 1985 Discusses ASLB 850227 Memorandum & Order Re Emergency Planning Summary Disposition Motions.Applicants Received No Other Intervenor Responses or Requests for Extension Re Remaining Motions.Related Correspondence ML20099J3701985-03-14014 March 1985 Discusses NRC Re Eddleman 850301 Motion to Compel Discovery of NRC Staff.No Provisions of Code of Prof Responsibility or Commission Rule of Practice Relieve NRC of Obligation to Respond by Pleading.Related Correspondence ML20134G0611985-03-12012 March 1985 FOIA Request for All Records Re C Van Vo (Also Known as Vv Davis) 841006 Affidavit,Concerns Expressed in Affidavit & NRC Response to Concerns,Including Documents About Subjs Forming Basis for Insp Repts 50-400/84-43 & 50-400/84-45 ML20101S9791985-02-0101 February 1985 Forwards Application for Issuance of Subpoena Duces Tecum to C Van Vo,Proposed Subpoena & Notice of Deposition of C Van Vo.Applicant Will Undertake Svc of Subpoena After Execution.Related Correspondence ML20104A3831985-01-29029 January 1985 Reaffirms Commitment to Include All Map Info Required by NUREG-0654 in Annex 1,Rev 1 to Emergency Response Plan,Per Terms of Rejection of Eddleman Contentions 250 & 251.Svc List Encl ML20112J8391985-01-14014 January 1985 Forwards Motions Addressing 12 Contentions.Summary Disposition of All Outstanding Admitted Emergency Preparedness Contentions Except Wilson Contention 11 Sought by Applicants ML20112D9381985-01-10010 January 1985 Forwards Errata & Amends to 841221 Applicant Proposed Findings of Fact & Conclusions of Law Re Safety Matters to Correct Typos.Svc List Encl ML20101P0721985-01-0303 January 1985 Forwards Joint Motion for Approval of Settlement of Eddleman 227-S Submitted Jointly by Applicants,Eddleman,Nrc & Fema. Proposed Order Approving Settlement of Eddleman 227-S Encl ML20101E9421984-12-21021 December 1984 Forwards Applicant Proposed Findings of Fact & Conclusions of Law on Safety Matters.Certificate of Svc Encl ML20100B3231984-12-0303 December 1984 Forwards NRC Issued SERs on Reliability of Tdi Diesel Generators,Per Applicant Oral Motion Re Two Deferred Eddleman Contentions on Diesel Generators & ASLB Request for Suppl.Svc List Encl.Related Correspondence ML20094B1321984-11-0505 November 1984 Forwards 841105 Corrections to Jf Nevill,Ag Fuller, Dr Timberlake & Kv Hate 840809 Testimony Re Eddleman Contention 41 (Pipe Hanger Welding).Related Correspondence 1990-06-13 |
Text
- _ _ _ _ _ _ _ _ _ .
e 4 SHAW, PITTMAN, PoTTs & TROWBRIDGE hfRC
, PARTNERsMip or pRorE3SIONAL CORPORATIONS 1800 M STREE*, N. W.
WASHINGTON, O C.20036 c c op j 6 tacan saa-soes & e22-i49e r- ,: actex ~
es-tees asMAWLAW WSHI CABLE "$MAWLAW**
u DEAN D. AUUCK. RC. .
October 12, 1983 i ,,7e",2.'.
James L. Kelley, Esq. Mr. Glenn O. Bright Chairman Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 Dr. James H. Carpenter Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 In the Matter of Carolina Power & Light Company and North Carolina Eastern Municipal Power Agency (Shearon Harris Nuclear Power Plant, Units 1 and 2)
Docket Nos. 50-400 and 50-401 OL Administrative Judges Kelley, Bright and Carpenter:
On October 3, 1983, Applicants filed with the Board a Motion for Summary Disposition of Joint Intervenors' Contention II and Wells Eddleman's Contention 37B (Health Effects). Unfortunately, it has since been noted that final editing and typographical corrections were not included in the final draft filed with the Board and parties.
Enclosed is a corrected copy of the Motion which incorporates all such changes. For the convenience of the Board and parties, we also enclose an errata sheet which identifies each of the editorial changes other than simple typographical corrections that have been made in the enclosed corrected copy.
Please substitute this copy for the original submittal.
We regret any inconvenience this may have caused.
Respectfully submitted, Dean D. Aulick cc: Service List Counsel for Applicants 8310170543 831012 PDR ADOCK 05000400 0 . PDR.
_