Forwards Applicant Proposed Findings of Fact & Conclusions of Law on Eddleman 57-C-3 (Night Time Notification) Re Collective OL for Facility
ML20138B378
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/09/1985
From: Baxter T
CAROLINA POWER & LIGHT CO., NORTH CAROLINA MUNICIPAL POWER AGENCIES, SHAW, PITTMAN, POTTS & TROWBRIDGE
To: Bright G, Carpenter J, Kelley J
Atomic Safety and Licensing Board Panel
Shared Package
ML20138B382 List:
References
CON-#485-454 OL, NUDOCS 8512120281
Download: ML20138B378 (2)


Text

?s 46f N

SHAw, PITTMAN, POTTs & TROWBRIDGE A PARTNERSMtp sNCLuDtNG PROFESSIONAL CORPORaftONS 1800 h6 STREET, N. W.

WASHINGTON. 6.1, TROD 36 NAa.SAY D. PO*TS. p C. g n , p.C. RE,eNETM J MAUTMAN DARYL ANNE L ANDER MANg ~ "

RGE F TRO q g p.g, NT E [. C. WDER C L RLEiN C 'A A Sw. R RA CMA ,i, p EVEN1 L A

- H RD A R1NO ENTA J E LSTEIN m e,e,Bes.w.ee mp ,w:E%#CAE.u co= igc' y 'yf' g.DuANE p aM m sv:.am. N DA rFT *

5. J -= - JO NM 7

.L J C

P.

, ,Am CO 8CM fn .

AD

~

NE H A. G A L mLE we.SLE GMTON n.

J,O,,HN DA.v80,R.C oCE 5. w cRwsNELANoER. c J, AY.A.

.E- ERF DL. .t E.N.q,.. R.C. ,,,,,,.,,,, M,,AL.A.,EA.L n,.A M.to D..J E N, A A LESUE A[ N C' , [ p.C. N.^Ah,"g %,"*g'{[ghye gg E L ^{(*' [, [Lf4l tESERMAN

,, N "f,"E'"St."ItN.' L?&?tJr affg.""'c" CFFQ Hu e gg';p,Ap;NogER 50141*",*,o% c ,,,

G GE V A E p C. isNg w as[NDLETON g g. g,4A h hS b w# j ( y C"((g o gA * ((((gg g, gg w SE ? wAS aN NH "ArE"hTE**"i'5NBR.

. ,..C. CAeLE S,.sMkCH *1!!r".t.'JJat':,'OwA,... *8"& f4T cam'""'"

t,v ." n.u c e sa r-y w SEf"'J *g,":W80!,^t'o' g

VIRGINIA OFFICE

snEr:0:;aER S. P8LECM scw,,"^:

C AhJ pure,?:R Ag ga R, C" E GO Y L"60TA pit q [s,,q *u'g y h DES MS AU iSOI Fame. CREOa7 DRevE ,

w{Noruh A. wMeTE 'Ng, o 'y'l,q w ,

S J. TMonaAS LE N=A RT.

  • C. (($,g g" fgIj$l?, MCLE A N. Y,RG NsA 22402 ESut L5M >. *("w#ga g'$ $g d."

,UA!ai",= sit' adi,,

iNi!?s tu"L CJ.'s "'R e.. "

l"aut @[ t,",~et. W .'JE!.:"S* L""

s" ** ,,.

P (7om voo '*oo

""#M?tbl.%)n,. i?,7?J%^it"4"' - ^

"^t!!.^.oiR a v'0"JPuCrum 48M",", E, " omen,.N, "S*L"II.*?t"aN. . e. sacan ;?."tr.EwS * *co' " ti'7R;Cf^-&",fa **

"?!r**!## ."#R"OL""fe' NT7L"  ::?Co*fA4^",

  • Ek"v'.1
  • t'BP!E"C-

$^0J,UES ::^t'S;f,5"/,,,.

,?."3"#1 S E R.

JAMES S. Mawuw. P.C. DELIS SA A. R.OGwAv JEFFRET R. SNYOER. S U SAN C. LOe.G S T R E E T.

FREO ORASNER

  • seOT .ceesvtse u. e c.

JO r. DEAL,. .-.R.

MsCMAND S. BEATTY ROSERT E. CONN COUNSEL WRtTER S DIRECT OtAL Nua.sER December 9, 1985 (202) 822-1090 James L. Kelley, Esquire Mr. Glenn O. Bright Chairman Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 Dr. James H. Carpenter Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 In the Matter of Carolina Power & Light Company and North Carolina Eastern Municipal Power Agency (Shearon Harris Nuclear Power Plant)

Docket No. 5 0-4 0 0 DL._

Administrative Judges Kelley, Bright and Carpenter:

Please find enclosed a copy of " Applicants' Proposed Find-ings of Fact and Conclusions of Law on Eddleman 57-C-3 (Night-Time Notification)." By agreement of the parties, and with the approval of the Board, the schedule for filing hh G ~

t

SO3

g d SHAW. PITTM AN, PoTTs & TROWBRf DGE A PARThate5**** eMCLUD'NG PROFf SSiONAL CORoomatcNS James L. Kelley, Esquire Mr. Glenn O. Bright Dr. James H. Carpenter December 9, 1985 Page 2 proposed findings on this contention as ordered by the Board (Tr. 10,187-88) has been adjusted by three days because of the need to address recent additions to the record. (The schedule for proposed findings on CCNC Contention WB-3 (Drug Abuse Dur-ing Construction) has not been changed.) The proposed find-ings of Mr. Eddleman and any party other than the NRC Staff / FEMA are now due on December 16, 1985, and are to be served upon the NRC Staff and FEMA by over-night means. Tr.

10,188. The proposed findings of the NRC Staff / FEMA are due on December 23, 1985, and Applicants' reply is due on January 2, 1986.

Other parties should note that Applicants have taken the liberty of assigning exhibit numbers to evidence received after the hearing. See Appendix B of the enclosed. It would assist the Board if all parties used the same exhibit citations in proposed findings.

As the Board is aware, this contention originally was set for hearing in June, 1985. A nearly five-month delay in the hearing was incurred because additional time was extended to FEMA for the preparation of its testimony. Applicants respect-fully plead with the Board for a prompt decision on this con-tention if the Board concludes that the public alert and noti-fication system for the Shearon Harris EPZ should be enhanced.

Both the public interest and Applicants' interests would be served by the issuance of such a decision as soon as possible, so that the orderly startup of the Harris Plant is not inter-rupted by the need to implement last-minute corrective mea-sures.

l Respectfully submitted, Thomas A. Baxter Counsel for Applicants l TAB:jah cc: Service List i