Telecopy Ro:On 740613,level Switch LIS-2-263-72D Failed. Switch Lightly Pressed & Functioned Normally.New Switch Ordered
ML20084K589
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 06/14/1974
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084K568 List:
References
NUDOCS 8305190488
Download: ML20084K589 (1)


Text

_ _ _ _

l

( e E.EJ E.E * ' Tele

~

western union

/

rarW ' -

w E R ObY ORDERS VEA074(0959)(2-009471E165)PD OMIAtf L i 0, (YE -ACENT, NO-AJC AGENT SECTICH ICS.IPMBNGZ CSP Nbr. & Nud /1 - fgg. $['EC { SECTION [

N n 3096542241 TDBN CORD 0VA IL 89 06-pttGR5SA Eup/,(Liggy9y y PMS J KEPPLER, REGIONAL DIRECTOR,

["t[ deliver E DIRECTORATE OF REGULATORY OPERATInhas REGION 3 US A OMfd kiERdY UU l COMMISSION 799 ROOSEVELT RD GLEN ELLYN IL 60137 1

-REFERENCE QUAD CITIES NUCLEAR POWER STATION UNIT 2 DOCKET 50-265, t

BPR-30, APPENDIX A SECTIONS 1.0.A.2, 3.2.B CABLE 3.2.2, AND ,

6.6.8 ON JUNE 13 WIIH THE REACTOR IN'THE COLD SHUT DOWN CONDITION, j

- SURVEILLANCE FUNCTIONAL TESTING WAS.BEING PERFORMED. WHEN THE c S v

TEST PRESSURE WAS APPLIED TO LIS-2-263-72D IT FAILED TO TRIP.  ;

.g THE MERC010' SWITCH WITHIN THE LEVEL SWITCH WAS NOT . ACTUATING, _

{

BUT UPON BEING LIGHTLY PRESSED II STARTED FUNCTIONING NORMALLY. l IT WAS TESTED NUMEROUS TIMES WITH NO FAILURES. A NEW LIS WILL .,

j

%'- sr.isoi (aus>

BE OBTAINED TO REPLACE THE EXISTING UNII.

No KALIVIANAKIS STATION SUPERINTENDENT ,

NNNN f

e' j,)

~

8305190488 740711 Y

/

PDR ADOCK 05000265 *[

.' S PDR L ,r[)

sm: - , ,

b .

J' l SF-1201 (RM9) l

_ _ . _ _ - _ _ _ _ _ - . _ _ _ _ _ _ _ - _ _ _ _ . . - - - _ - _ - . _ _ _ . _ - _ _ _ . . _ _ _ _ . . . . , _ _ . _ _ _ _ .