RO Re Notification by GE of Oversight in Reload 2 Licensing Submittal Leading to Possible Nonconservative Operation During Cycle 3.Work Request to Lower Rod Block Monitor Line to 10% at Full Flow Initiated
ML20084S483
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 09/21/1976
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084S480 List:
References
NJK-76-351, NUDOCS 8306170054
Download: ML20084S483 (2)


Text

_

b h Edison O

d[?

OdacCrics t car Power Sto'ca

(%(iQN,.dW'7 Cordova. I! boo:s G1242 PoM Omce Dot ?)G Telephone 3D9/054-2241 '

l auk-76-35 I v.i.---...

e.

e--

eee n..__.e-w,.

r-er--i-e

e. s.,. r..

J. Keppler, Regional' Director

, Office of Inspectfon; and. Enforcement 2'

Reglon !Il' U. S. Nucicar Regulatory Commission 799 Roosevelt Road Glen.Ellyn, 111tnois.60137 Referencet-quad-Cities Nuclear Power Station, Unit 17 Docket Ho-. 50-254, DPR-29 Appendir A,. Sections 3 2.C Il; 6.6.1LI ht Dear Mr. Keppler-The purpose of this letter is to provida you with notification of a Reportable Occurrence as required by Technical-Specification 6.6.B. T' i

within,24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

The General Electric Company has notified.Cournonwealth' Edicon's Rucicar Fuel Services department, who has in. turn. notified the station, of an-

' oversight in the Quad-Cities Unit One Reload Two Licensing Submittal j

iesding to possible non-conservative operation of the unit during cycle 3.

For a. Rod Block. Monitor (UDH) rod block line setpoint of IIO% at rated flow, the !! censing submittal shows the Rod Withdrawal Error (RVE).

to be the liraiting: Minlaum Critica1' Power-Ratio-(MCPR)' transient.. This.

was apparently overlocked when determining. the MCPRcoperating limits for

~

i Cycie 3 In order to-be able to. apply-tI>e MCPit 1imits. specified in, the 1 Tcensing. submittal' and our current Technical Specifications, the. RBM-5 rod block setpoint at fut t ' flow.n;ust be lowered to 107%.

r We' have. Initlated n. work request to-Iower the RBM rod: block line to;1073 at full flow,. and have verified that a Technical Specification: change request has been initiated. This action..wi ll' eliminate-the RWE as ' a-IYmiting transient and'will place us conservatively withih.the analysis i

of the submittal.

Rod ' movement has been. procedurally < Ilmited so-as to; j

minimize the possibil'ity.of. an P.VE and! ensure: safe unit operation.

8306170054 761004 gDRADOCK-05000254 PDR ui.

,4-,

.,,a w

-w

.--, - ~ - -, -.,

g-4,re

-.<w w-.w, w

g y_

v.y m,,.,--,-n--,-m-v+-,

,----4

-s,pe.-

n--,,,p,-

y,-r,

___m-m_-

._m._

s' I

This. occurrence was discussed by telephone with Mr.

C'. Feierabendtof your office on September 21. 1976.

Further inforr.ution. will'ba provided.

by. Reportable Occurrence Report RO 50-254/76-31:which will be submitted.

within 14 days of the date of this occurrence.

Very truly yours, COMMONVEALTH. E0 5 SON: COMPANY' QUA06 CITIES NBCLEAR POWER. STATION:-

~

l-i p.

J. Kaifvfanakis Station Superintendent NJK/GS/Ik cc:

G. A. Abrell

~

l e

e i

s 0

3-.