ML20084K836
| ML20084K836 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 06/10/1974 |
| From: | Kalivianakis N COMMONWEALTH EDISON CO. |
| To: | Oleary J US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20084K663 | List: |
| References | |
| NUDOCS 8305190555 | |
| Download: ML20084K836 (1) | |
Text
- _ _ _ _ _ _ _ _ _ _ _ _ _ _
pus rost9 3
MGMnSH7 HSS 7
n n ] p-r] @"
og
- w c 4'1 E (b '
y g
7,-045517E1c1 OehJ/74 Luc 5lern union J u e < aug' II@6 E
5 il O L b.,..N. {* % *
- d JJ~.
ICS IPMcNGZ csp 309o542241 MGM TDBN CORDOVA IL 400 06-10 0758P EDT
(
Tb
' ZIP 20545
[j
,O 9
JUN111974 >- @
"siM?* E s w.v,
'D
.~Q, W W.e
,,,%. qG
( l>
JOHN F OLEARY, DIRECTOR O
DIRECTOWATE OF LICENSING REGULATION US ATOMIC ENERGY COMMISSION WASHINGTON DC 20545 l(
50~265 0
f REFERENCE GUAD CITIES NUCLEAR P O'a E R STATION UNIT 2, DOCKET NUMBER 50-2o5 LICENSE DPR-30, APPENDIX A,
SECTION 1.0.8.3 AT 225AM ON JUNE 10, 1974 *ITH UNIT 2 OPERATING AT 200M*E, FEEDWATER LOW FL0a REGULATING VOLVES A0-2-bu3 SUFFERED A GROSS FAILURE
'.)
0F THE VOLVES BODY, CAUSING TmE FEEDaATER LINE TO BECOME SEVERED.
TME SEVERED LINE CAUSED THE *ATER LEVEL IN THE REACTCR TO DECREASE L
THE REACTOR SCRAMED FROM A L0a *ATER LEVEL SIGNAL. EXAMINATION O
OF THE VOLVES SHO*ED THAT THE FAILURE APPEARED TO BE CAUSED BY THE VOLVES MINIU" aALL T"IC4 NESS BEING LESS THAN THE DESIGN
(
REQUIREMENTS. MINIU" aALL THICKNESS SHOULD HAVE BEEN 5e2 INCHES:
ACTu1L uEASUREMENTS RANGED FRou 315 INCwES TO,au7 INCwES, FEiUanitA k Lua imMUUun IFt dtVtMtU LINT aAd IbOLAltD aITHIN L
20 MINUTES. ESTIMATES ARE THAT APPR0xIMATEL 50,000 GALLONS OF WATER ESCAPED FROM TWE SEVERED LINE. HEAT FROM THE RELEASED aATER AND STEAM ACTUATED TrE FIRE DELUGE SYSTEM WHICH RELEASED I
ADDITIONAL WATER TO T"E PLANT. RADIATION CONTAMINATICN SURVEYS 44 S*0aED THAT A SMALL GUANTITY OF CONTAMINATED
'ATER REACHED THE a
PLANT STORM SEaER SYSTEM AND EMPTIED INTO THE UNIT 2 OIL SEPARATOR
(
SUPP. EXA"INATION OF *ATER IN THE SEPARATOR SHOAED GROSS BETA d,,
ACTIVITY OF 3.4 TI*ES 10 TO TwE PINUS 6 MICRO-CURIES PER PL.
AND GROSS GAMMA ACTIVITY OF 1.8 TIMES 10 TO THE MINUS 5 MICRO-CURIES PER ML. aHICH IS SLIGMTLY ABOVE BACKGRCUND. SAMPLES FROM THE W,
INTAKE BAY COMPOSITE SAMPLER, *MICH IS DOWNSTEAM FROM THE SEPARATOR DISCHARGE TO TME RIVER, S*0aED ACTIVITY OF 1.07 TIMES 10 TO int MINUS 8 MICHO-CURIES PER ML, aHICH IS NOT ABOVE NORMAL LEVELS, w
THE MAJ04ITY OF THE aATER FROM THE LINE BREAK AND THE DELUGE SYSTEM ACCU"ULATED aITMIN THE PLANT. CLEAN UP AND DECONTAMINATION OF THE PLANT AREA, AND PROCESSING OF THE ACCUMULATED *ATER IS O
IN PROGRESS.
N.J.
KALIVIANA4IS STATION SUPERINTENDENT G
19:56 EDT O
t MGPaSHT NSd t
8305190555 740717 h
f/
5625' 1 PDR ADOCK 05000265
\\, ;,
q-c S
pyg y
a
\\>" ( C D
o
/
COPY SENT REGION _
c,
/
^
1