Forwards Summary Status of Fuel Performance for End of Cycle 11
ML20066J633
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 01/31/1991
From: Bax R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RLB-91-38, NUDOCS 9102260330
Download: ML20066J633 (2)


Text

- . . . -- . . - . - . .. - .-

,,s' ")

T "

M[ ^vCS, Commonwealth L ou;d Cites Nucl:ar PowerEdisin Stat un

( g- H)/ :'22710 206 Avenue Nortn -

\ Cordova; lllinois 61242 9740 . '

. j ; . , 5.([ Telephone 309/054 2241 -

RLB-91-38 .

January 31, 1991

.y -?

U.S. Nuclear Regulatory Commission-

' ATTN: Document Control Desk Hashington, D.C. 20555

Subject:

~

Quad Cities Nuclear Station Unit'l e

^ Summary Status of-Fuel Performance.

NRC Docket Number 50-254 Enclosedis'the;SpecialReport,." Quad-CitiesNuclearPowerStation, Unit 1, Sumary-Status of fuel Performance, End of Cycle 11, November,1990.:

4

, This- report is submitted to you In accordance with the Special Report

.R6quirements of Table 6.6-1, Docket Number 50-254, DPR-29.

Very-truly yours,

!-R.L. Bax

Station Manager ~ -

' Enclosure.

cc: _A.B.; Davis, Regional Administrator  !

T.' Taylor,. Senior Resident-Inspector 1 R. Stols., Commonwealth Edison i

.D. Galle,-Commonwealth-Edison W. Naughton, Commonweaith Edison s

RLB/dlb 9102260330 910131 'I .

l - DR ADOCK 05000254 2'978H ' PDR

~ _ _ _. ___ _ . . _

]!

7 QUAD-CITIES NUCLEAR POWER' STATION

>- - UNIT ONE-

'b:a ' " _ _ , -

SUMMARY

STATUS OF FUEL PERFORMANCE END OF CYCLE ELEVEN NOVEMBER 1990

_. i At the end of this: reporting period,' Quad-Cities Unit One had_ completed Eleven Reactor cycles of operation. During that time, 2512 fuel assemblies had seen duty in the Unit One core.

Sipping _was performed on two reload fuel assemblies at the End of Cycle Eleven. Sipping and visual-inspection of fuel assembly LYD482 was performed due to contact with the cattle chute ramp of-the: fuel pool. No visible damage- i to.the fuel. assembly was-found during the inspection and sipping revealed no failed fuel rods.

- The GE P8X8R~(barrier clad) assembly (LYD395) reconstituted in October 1989 .

with six-GE Lead Barrier Test' Assembly rods was visually inspected and sipped

' by GE as-part of the Lead Barrier Test Program.- The sipping and visual inspection _of__the fuel assembly revealed no failed fuel rods. Both LYD482.and LYD396 were reloaded into the core for cycle twelve operation.

No other. reload-fuel assemblies were stpped since chemical and radiochsmical.

' data collected during' Cycle Eleven gave no indication of leakage'or fuel failure'during the cycle.--

For. Unit One Cycle 12 144 new LYV-GE8X8EB (barrier clad) assemblies:were-visually inspected.1 These one hundred forty _four GE 8X8EB assemblies were loaded into. Unit One for Cycle 12 operation.