Telecopy Ro:On 740613,level Switch LIS-2-263-72D Failed. Switch Lightly Pressed & Functioned Normally.New Switch Ordered
ML20084K589
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 06/14/1974
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084K568 List:
References
NUDOCS 8305190488
Download: ML20084K589 (1)


Text

_ _ _ _

(

e

! E.EJ E.E *

~

' Tele rarW '

western union

/

w ObY ORDERS E R VEA074(0959)(2-009471E165)PD OMIAtf L i 0, AGENT SECTICH (YE -ACENT, NO-AJC ICS.IPMBNGZ CSP Nbr. & Nud /1 - fgg. $['EC { SECTION

[

N 3096542241 TDBN CORD 0VA IL 89 06-pttGR5SA Eup/,(Liggy9y y

n PMS J KEPPLER, REGIONAL DIRECTOR,

["t[ deliver E DIRECTORATE OF REGULATORY OPERATInhas REGION 3 US A OMfd kiERdY UU COMMISSION 799 ROOSEVELT RD GLEN ELLYN IL 60137

-REFERENCE QUAD CITIES NUCLEAR POWER STATION UNIT 2 DOCKET 50-265, t

BPR-30, APPENDIX A SECTIONS 1.0.A.2, 3.2.B CABLE 3.2.2, AND 6.6.8 ON JUNE 13 WIIH THE REACTOR IN'THE COLD SHUT DOWN CONDITION, j

SURVEILLANCE FUNCTIONAL TESTING WAS.BEING PERFORMED. WHEN THE c

S

-v TEST PRESSURE WAS APPLIED TO LIS-2-263-72D IT FAILED TO TRIP.

THE MERC010' SWITCH WITHIN THE LEVEL SWITCH WAS NOT. ACTUATING,

{

.g BUT UPON BEING LIGHTLY PRESSED II STARTED FUNCTIONING NORMALLY.

l IT WAS TESTED NUMEROUS TIMES WITH NO FAILURES. A NEW LIS WILL j

sr.isoi (aus>

BE OBTAINED TO REPLACE THE EXISTING UNII.

No KALIVIANAKIS STATION SUPERINTENDENT NNNN f

e'

/ j,)

~

Y 8305190488 740711

  • [

PDR ADOCK 05000265 S