! E.EJ E.E *
~
' Tele rarW '
western union
/
w ObY ORDERS E R VEA074(0959)(2-009471E165)PD OMIAtf L i 0, AGENT SECTICH (YE -ACENT, NO-AJC ICS.IPMBNGZ CSP Nbr. & Nud /1 - fgg. $['EC { SECTION
[
N 3096542241 TDBN CORD 0VA IL 89 06-pttGR5SA Eup/,(Liggy9y y
n PMS J KEPPLER, REGIONAL DIRECTOR,
["t[ deliver E DIRECTORATE OF REGULATORY OPERATInhas REGION 3 US A OMfd kiERdY UU COMMISSION 799 ROOSEVELT RD GLEN ELLYN IL 60137
-REFERENCE QUAD CITIES NUCLEAR POWER STATION UNIT 2 DOCKET 50-265, t
BPR-30, APPENDIX A SECTIONS 1.0.A.2, 3.2.B CABLE 3.2.2, AND 6.6.8 ON JUNE 13 WIIH THE REACTOR IN'THE COLD SHUT DOWN CONDITION, j
SURVEILLANCE FUNCTIONAL TESTING WAS.BEING PERFORMED. WHEN THE c
S
-v TEST PRESSURE WAS APPLIED TO LIS-2-263-72D IT FAILED TO TRIP.
THE MERC010' SWITCH WITHIN THE LEVEL SWITCH WAS NOT. ACTUATING,
{
.g BUT UPON BEING LIGHTLY PRESSED II STARTED FUNCTIONING NORMALLY.
l IT WAS TESTED NUMEROUS TIMES WITH NO FAILURES. A NEW LIS WILL j
sr.isoi (aus>
BE OBTAINED TO REPLACE THE EXISTING UNII.
No KALIVIANAKIS STATION SUPERINTENDENT NNNN f