Monthly Operating Repts for Nov 1993 for San Onofre Nuclear Generating Station Units 2 & 3.W/931215 Ltr
ML20058P266
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/30/1993
From: Darling J, Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9312270001
Download: ML20058P266 (13)


Text

. _. .- . .

I s *

(WN,b

- wc s.w Southem Califomia Edison Company 23 PARKER STREET IRVINE. CALWORNIA 92718  ;

1 Dect.mber 15, 1993 w^u cR c uARs,-. _,_

..~.c.m o, ~ucu.maumrom .,,. es y , . i . ... ;

i U. S. Nuclear Regulatory Commission ,

Attention: Document Control Desk L Washington, D.C. 20555 ,

i Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 i Monthly Operating Reports for November 1993 l San Onofre Nuclear Generating Station, Units 2 and 3 i Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and ,

NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires SCE to provide a Monthly Operating Report for each  !

Unit, which includes: routine operating statistics and shutdown experience; all challenges to safety valves; any changes to the Offsite Dose Calculation Manual (0DCM); and any major changes to the radioactive waste treatment system. All covered activities are reported monthly, except for  :

ODCM changes, which are reported within 90 days from the time the changes were made effective.

This lecter transmits the November 1993 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to safety valves, no changes to the ODCM, and no major changes to the Units 2 and 3 radioactive waste treatment systems during the reporting period.

If you require any additional information, please let me know.

Sincerely, h Maraehp -

i Enclosures cc: B. H. Faulkenberry, Regional Administrator, NRC Region V i M. B. Fields, NRC Project Manager, Units 2 and 3 NRC Resident Inspector Office, San Onofre Units 1, 2 and 3 230043

// 1 9312270001 931130 T ,f T gDR ADOCK 05000361 #  !

l PDR j \ \\

t Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE: December 15. 1993 COMPLETED BY: J. L. Darling TELEPHONE: (714) 368-6223 i OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generating Station. Unit 2
2. Reporting Period: November 1993
3. Licensed Thermal Power (MWt): 3390
4. Nameplate Rating (Gross MWe): 1127
5. Design Electrical Rating (Net MWe): 1070
6. Maximum Dependable Capacity (Gross MWe): 1127 f
7. Maximum Dependable Capacity (Net MWe): 1070
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) i Since Last Report, Give Reasons: NA
9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720.00 8.016.00 90.193.00
12. Number Of Hours Reactor Was Critical 720.00 6.536.23 67.270.59 ,
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 720.00 6.470.07 66.127.34
15. Unit Reserve Shutdown Hours 0.00 0.00 -0.00
16. Gross Thermal Energy Generated (MWH) 2.359.616.90 21.232.059.01 216.051.907.33
17. Gross Electrical Energy Generated (MWH) 807.667.50 7.197.327.00 73.242.887.00
18. Net Electrical Energy Generated (MWH) 770.654.00 6.841.057.05 69.448.572.88
19. Unit Service Factor 100.00% 80.71% 73.32%
20. Unit Availability Factor 100.00% 80.71% -73.32%
21. Unit Capacity Factor (Using MDC Net) 100.03% 79.76% 71.96%
22. Unit Capacity Factor (Using DER Net) 100.03% 79.76% 71.96%
23. Unit Forced Outage Rate 0.00% 0.00% 6.24%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 2

Document Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE: December 15. 1993 COMPLETED BY: J. L. Darlino TELEPHONE: (714) 368-6223 MONTH: November 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE. DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1079.33 16 1072.33 2 1079.71 17 1072.33 3 1083.00 18 1069.50 4 1080.96 19 1070.54 5 1075.79 20 1053.25 6 1079.29 21 1070.63 7 1078.13 22 1074.29 8 1079.00 23 1049.29 9 1077.33 24 909.08 l 10 1078.50 25 1084.67 11 1078.63 26 1082.71 12 1079.08 27 1085.21 l 13 1056.96 28 1087.54 14 1078.92 29 1086.29 15 1073.21 30 1085.08 3

l l

Document Control Desk UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-361 ~

UNIT NAME: SONGS - 2 REPORT MONTH: November 1993 _

DATE: December 15. 1993 COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Method of Shutting Cause & Corrective Duration Down LER System Component Action to No. Date Type l

(Hours) Reason 2 Reactor 3 No. Code' Code' Prevent Recurrence There were no unit shutdowns or reductions in the Average Daily Power Level of more than 20% this reporting period.

3

'F-Forced ' Reason: Method: "IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual 9-Maintenance or Test 2-Manual Scram. S IEEE Std 803A-1983 C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Administrative 5-Rec:uction in the Average G-Operational Error (Explain) Daily Power Level of more H-Other (Explain) than 20% from the previous day 6-Other (Explain) 4

4 Document Control Desk

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-361 l UNIT NAME: SONGS - 2 DATE: December 15. 1993 COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Date Time Event November 1 0001 Unit is in Mode 1, 98% reactor power, 1129 MWe.

1 November 23 1900 Commenced power reduction to 80% reactor power to perform circulating water system heat treat. I 2251 Unit at 80% reactor power 908 MWe.

November 24 1500 Commenced power increase to full power following completion of circulating water system heat treat. 1 1940 Unit at 98% reactor power, 1136 MWe. Main turbine control valves full open.

November 30 2400 Unit is in Mode 1, 98% reactor power, 1135 MWe.

i l

l l 1

5

1  ;

l

. i Document Control Desk l

REFUELING INFORMATION i

DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE: December 19. 1993 .

COMPLETED BY: J. L. Darlina l TELEPHONE: (714) 368-6223 MONTH: November 1993

1. Scheduled date for next refueling shutdown.

Cycle 8 refueling outage is forecast for January 15, 1995.

2. Scheduled date for restart following refueling.

Restart from Cycle 8 refueling outage is forecast for March 31, 1995.

l l 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

l Unknown at this time for Cycle 8 refueling.

What will these be?

NA

4. Scheduled date for submitting proposed licensing action and supporting information.

NA

5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None.

6 l

i

l Document Control Desk i

l REFUELING INFORMATION l

DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE: December 15, 1993 ,

! COMPLETED BY: J. L. Darlina l TELEPHONE: (714) 368-6223 l

MONTH: November 1993

6. The number of fuel assemblies, a) In the core. 217 b) In the spent fuel storage pool. 662 Total Fuel Assemblies  !

592 Unit 2 Spent Fuel Assemblies .

O Unit 2 New Fuel Assemblies 70 Unit 1 Spent Fuel Assemblies

7. Licensed spent fuel storage capacity. 1542 ,

1 Intended change in spent fuel storage capacity. None l l

8. Projected date of last refueling that can be discharged to spent fuel storage l pool assuming present capacity.

Approximately 2005 (full off-load capability) l l

7 l

l i

I

+ . . . . - - , - - .n- 2.u a - . .. .-- a --..u. . - . . -.-u...--a.-

j Document Control Desk NRC MONTHLY OPERATING REPORT  !

DOCKET NO: 50-362-  !

UNIT NAME: SONGS - 3  ;

DATE: December 15. 1993  ;

COMPLETED BY: J. L. Darlina  :

TELEPHONE: (714) 368-6223 ,

i OPERAflNG STATUS l

1. Unit Name: San Onofre Nuclear Generatina Station. Unit 3 -
2. Reporting Period: November 1993 j
3. Licensed Thermal Power (MWt): 3390 -
4. Nameplate Rating (Gross MWe): 1127  :
5. Design Electrical Rating (Net MWe): 1080  :
6. Maximum Dependable Capacity (Gross MWe): 1127  :
7. Maximum Dependable Capacity (Net MWe): 1080 j
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) l Since Last Report, Give Reasons: NA
9. Power Level To Which Restricted, If Any (Net MWe): NA ,
10. Reasons For Restrictions, If Any: NA i

This Month' Yr.-to- Date Cumulative i

11. Hours In Reporting Period 720.00 8.016.00 84.744.00 .
12. Number Of Hours Reactor Was Critical 0.00 6.688.57 65.888.33 l
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00 ,
14. Hours Generator On-Line 0.00 6.657.06 64.263.12
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 [
16. Gross Thermal Energy Generated (MWH) 0.00 21.956.354.76 206.590.428.99  !

l 17. Gross Electrical Energy Generated (MWH) 0.00 7.504.722.50 70.131.582.50  ;

18. Net Electrical Energy Generated (MWH)

(3.631.15) 7.124.608.5_8 66.270.278.94  :

19. Unit Service Factor 0.00% 83.05% 75.83%  :
20. Unit Availability Factor 0.00% 83.05% 75.83%
21. Unit Capacity Factor (Using MDC Net) 0.00%

l 82.30% 72.41% t

22. Unit Capacity Factor (Using DER Net) 0.00% 82.30% 72.41% l
23. Unit Forced Outage Rate 0.00% 1.63% 6.89%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):  :

Refuelina shutdown beaan October 10. 1993.

l

25. If Shutdown At End Of Report Period, Estimated Date of Startup: Under review.
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved 1

INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COW 4ERCIAL OPERATION NA NA 8

Document Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE: December 15. 1993 COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 MONTH: November 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0.00 16 0.00 2 0.00 17 0.00 3 0.00 18 0.00 4 0.00 19 0.00 5 0.00 20 0.00 6 0.00 21 0.00 7 0.00 22 0.00 8 0.00 23 0.00 9 0.00 24 0.00 10 0.00 25 0.00 11 0.00 26 0.00 12 0.00 27 0.00 13 0.00 28 0.00 14 0.00 29 0.00 0.00 30 0,00 l

l l

9

Document Control Desk -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET WO: 50-362 UNIT NAME: SONGS - 3 REPORT MONTH: November 1993 DATE: December 15. 1993 COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Method of Shutting Cause & Corrective Duration Down LER System Component Action to l

No. Date Type (Hours) Reason 2 Reactor 3 No. Code' Code 5

Prevent Recurrence 80 931010 5 720 C 1 NA NA NA NA 3

2 F-Forced ' Reason: Method: "IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram. S IEEE Std 803A-1983 C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of more H-Other (Explain) than 20% from the previous day 6-Other (Explain) 10

Document Control Desk

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE: December 15. 1993 COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Date Time Event November 1 0001 Unit is defueled all fuel assemblies are in the spent fuel pool.

November 16 0733 Commenced core reload.

November 19 1533 Core relaad of 217 fuel assemblies completed.

November 23 1408 Entered Mode 5.

November 30 2400 Uniit is in Mode 5,129 degrees F, 345 psig with a bubble in pressurizer.

l l

l I

11

Document Control Desk REFUELING INFORMATION DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE: December 15. 1993 COMPLETED BY: J. L. Darlino TELEPHONE: (714) 368-6223 MONTH: November 1993

1. Scheduled date for next refueling shutdown.

Cycle 7 refueling outage in progress Cycle 8 refueling outage is forecast for June 1995.

2. Scheduled date for restart following refueling.

Restart from Cycle 7 refueling outage is currently under review.

Restart from Cycle 8 refueling outage is forecast for August 1995.

3. Will refueling or resumption of operation thereafter require a Technical  !

Specification change or other license amendment?

Unknown at this time for Cycle 8 refueling.

What will these be?

NA

4. Scheduled date for submitting proposed licensing action and supporting information.

l' NA l

l l

l l

l 12

i Document Control Dest REFUELING INFORMATION DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE: December 15. 1993 )

COMPLETED BY: J. L. Darlinq  ;

TELEPHONE: (714) 368-6223 l l l MONTH: November 1993 l 5. Important licensing considerations associated with refueling, e.g. new or l different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

! None.

6. The number of fuel assemblies.

a) In the core. 217 b) In the spent fuel storage pool. 710 Total Fuel Assemblies 592 Unit 3 Spent Fuel Assemblies 0 Unit 3 New Fuel Assemblies 118 Unit 1 Spent Fuel Assemblies

7. Licensed spent fuel storage capacity. 1542 Intended change in spent fuel storage capacity. None 1
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

l Approximately 2003 (full off-load capability). This projected date was '

revised to reflect a change in the estimated time for future refueling l outages. The estimated length of future refueling outages was reduced from 90 days to 60 days. This also applies to unit 2; however, there was no change in the appraximate year date.

l 13 l