Revised Monthly Operating Repts for June 1981
ML20052E956
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/05/1982
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20052E950 List:
References
NUDOCS 8205110569
Download: ML20052E956 (2)


Text

.

OPERATING DAT A REPORT DOCKET NO.10-317 DATE 5/5/82 COMPLETED BY Elaine Lotito TELEPHONE (301) 78J-5363 OPERATING STATUS

1. Unit Name: Calvert Cliffs #1 _ _, N

Revision

2. Reportmg Period. June 1981
3. Licensed Thermal Pow er IMht):
4. Nameplate flating (Gross MWe P
5. Design Electrical Raimg(Net MWe):
6. Maximum Dependable Capacity IGross MWel:
7. Masimum Dependable Capacity (tiet MWe):
8. If Changes Occur in Capuity Ratiigs tirems Number 3 Thrnugh 7) Since Last Report.Gi'e lleasons.
9. Power Lesel To hhich liestricted. lf Any (Net Lthen: ___
10. Reasons For Resenctions. lf Any:

This Month Yr. to Date Cumulative i

f i1. Ifours in Reporting Period

12. Number Of flours Reactor Was Critical
13. Resetor Reserve Shutdown Hours
14. Hours Generator On Line , __
15. Unit Resene Shutdown flnurs '
16. Grou Thermal Energy Generated tMWH) 1,577,314 ___9.682.451 100.249.243 -
17. Gross Electrical Energy Generated IMWHI -- _ _ _
18. Net Electrical Energy Generated (MWHi -
19. Unit Senice Factor -
20. Ucit Availability Factor
21. Unit Capeity Factor (Using MDC Net)
22. Unit Capacity f actor (Using DER Neti _
23. Unit forced Outage Raie

}4. Shutdowns Scheduled Over Nest 6 Mnnths (T>pe. Dste.and Duration of Eacht:

25. If Shut Down At End Of Reprt Period Estimated Date of Startup:
26. Unis:In Test Status (Prior to Commercial Oper tion L Forecast Achieved INITIA L CRITICA LITY .

INITIA L ELECTitICITY COststERC14L OPERTTION 8205110569 820505 PDR ADOCK 05000317 (4/77)

R PDR

i ,

OPf R ATI.AG D AT A REPORT DOCKET NO. }0-318 DATE _5/5/82 COMPLETED DY Elaine Lotito TELEPilONE T35I-) 781-5363 OPERATING STAT US g, t,Nt Narne Calvert Clif f s #2 N tes' Revision

2. Reportmg Per.iod-J'ine 1981 J. Licensed ThermalIwcr aMWtb - . _ .
4. Nameplate Rating IGrou MWe1: . _-
5. Design Electrical Ratmg (Net MWei-
6. Matimum Depend 4We Capacity (Gre ss Mbel.
7. Maximum Dependable Capacity (Net Mbet - - - -
8. If Changes Occur it: Cap.eesty Ratinp tirems Nunt er 31hrn .gb 7) Since Last Repost. Gi'e Reasons.
9. Pouct Leiel To bhich Hestricted.lf An> INet Alb.3 _ _ _ . -
10. Reasons for Restrictians,if Any: -

= --

This Month Yr .to Data Cumulative

!!. Ilours in Reporting Period - - -

12. Number Of Ifoun Reactor Was Critical _ --_ -. _
13. Resetur Reserse Shutdown Hours
14. Houn Generstee On-Line ,
15. UrJt Reserve Shutdown linurs
16. Gross Thermal Energy Generated (MWH1 __1.783.301 _6,738,368 75.489,999 .
17. Gross Electrical Energy Generated IMWill -- --

IS. Net Electrical Energy Generated (MWill _

19. Unit Sersice f actor
20. Ur.it Availability Factor
21. Unit Capacity factor IUsing MDC Neti _
22. Ur.?: Copacity factor (L' sing DER Net) --
23. Unit forced Outage Rate .-
24. f.hutdowns Scheduled Over Nest 6 Monti s lT>pe. Date.ind Duration of Eachl
25. H Shut Down At End Of Report PerioJ. Estimated Date of Startup:
26. Units in Test Status irrior to Commercial Oper.tioni. Forecast Achieved INITI A L CRITK A LITY INITIAL ELECTRICITY COMMERCl AL OPE R \TlON