Revised Monthly Operating Repts for Nov 1981
ML20052F005
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/05/1982
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20052E950 List:
References
NUDOCS 8205110621
Download: ML20052F005 (2)


Text

b .

OPERATlhG DAT A REPORT DOCKET NO. 52-.317 DATE 5/5/82 COMPLETED BY Elaine Lotito TELEPilONE (301) 78J-.5363 OPERATING STATUS I. Unit Name: Calvert C1iffs #1_,,,,_ Not'5 Revision

2. Reporting Per;od- - Novernber 1981
3. Licensed Therme! Pov er 1.\lW:).
4. Nameplate Rating (Gross SIWep:
5. Design Electrical Rating INet MWe):
6. Maximum Dependable Capacity IGross Mhe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings litems Nurnter 3 ThrauFh 7) Since Last Report.Gi+e Reasons.
9. Power Lesel To hhich Hestricted. lf Any (Net 4 thel:
10. Reasons For Restnctions. lf Any:

This Month Yr..to.Date Cuaulative t

11. Hours in Reporting Period
12. Number O(liours Reactor Was Critical
13. Reactor Reserve Shutdow n llours
14. Hours Generatoe On Line ,
15. Unit Resene Shutdown flours *
16. Gross Thermal Energy Generated (MWH) 17,377,191 107,9C,,983 .
17. Gross Electrical Energy Generated (MWil) __
18. Net E!cetrical Energy Generated (MWH) _
19. Unit Senice Factor
20. Ucit Avalability Factor
21. Unit Capacity Factor (Using \tDC Neti
22. Unit Capacity factor tusing DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Nest 6 Months (T3pe. Date.and Duration of Eacht:
25. If Shut Down At End Of Rc;mrt PerioJ. Estimated Date of Startup-
26. Uniss In Test Status (Prior to Commerci21 Operstioni: Forecset Achiesed INITIA L CRI TICA LITY .

. INITIA L ELECTRICITY Cost \f ERCI A L OPER ATION 8205110621 820505 PDR ADOCK 05000317 (9/77) p PDR

N OPER ATI.N6 DAT A REPORT DOCKET NO. 3.-318 DATE 5/5/82 COMPLETED BY Elaine Lotito TELEP110NE (301) 787 5363 ,

OPERATING STATUS

1. Unit Name: Calvert Cliffs #2 Ni in ' Revision
2. Reportuig PerioJ- November 1981
3. Licenud ThermalIwwer IMWt). _ - . -
4. Nameplate R: ling igm >s MWe r S. Design Electrical Raim;(Net .4ther
6. Masimum DependaMe Capacity (Gross Mbe). _
7. Maximum Dependab!c Capacity (Net Mhel; i
8. If Changes Occur in Capseity Ratina:s tirems Nur-der 3 Thrm.;h 7) Since Last Report.Gise Reasons
9. Pouct Lesel To hhich Hestricted. lf Any INet Mhe n ____ __ _.
10. Reasons For Restnetions.lf Any: _

This hiar.th Yr ,to.Da t e Cumulative

11. Hours in Reporting Period
12. Number Of flours Reactor Was Critical _ ._ _ -
13. Resetor Resene Shutdown Hours
14. Bioues Generator On Line -
15. Unit Resene Shutdown liners '
16. Gross Thermal Energy Generated (MWHI 15,338,562 84, )90,1W ,

17 Gross Electrical Energy Genersted IMWif t -- -

18. Net Electrical Energy Generated (MWHi _
19. Unit Senite factor
20. Unit Asnilability Factor --
11. Urd Capacity Factor IUsing \tDC Neti ..

IL Unit Capacity FactorIU>ing DER Ncti -

23. Urit Forced Outge Rate ._
24. Shutdowns Schedu!cd Over Nest 6 Months (Type. Date.snd Duration of Eschi:
25. If Shut Down At End Of Report PermJ. Estimated Da:e of Startup;
24. Unis:In Test Status IPrior to Commercial Oper,tioni Focecast Atinned INITIA L CRITKALITY INITIA L ELECTRICITY COM%IERCI4L OPERTTION P/77)

- -_ _ - - - - .