b OPERATlhG DAT A REPORT DOCKET NO. 52-.317 DATE 5/5/82 COMPLETED BY Elaine Lotito TELEPilONE (301) 78J-.5363 OPERATING STATUS Not'5 I. Unit Name:
Calvert C1iffs #1_,,,,_
Revision
- 2. Reporting Per;od-
- Novernber 1981
- 3. Licensed Therme! Pov er 1.\\lW:).
- 4. Nameplate Rating (Gross SIWep:
- 5. Design Electrical Rating INet MWe):
- 6. Maximum Dependable Capacity IGross Mhe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings litems Nurnter 3 ThrauFh 7) Since Last Report.Gi+e Reasons.
- 9. Power Lesel To hhich Hestricted. lf Any (Net 4 thel:
- 10. Reasons For Restnctions. lf Any:
This Month Yr..to.Date Cuaulative t
- 11. Hours in Reporting Period
- 12. Number O(liours Reactor Was Critical
- 13. Reactor Reserve Shutdow n llours
- 14. Hours Generatoe On Line
- 15. Unit Resene Shutdown flours
- 16. Gross Thermal Energy Generated (MWH) 17,377,191 107,9C,,983
- 17. Gross Electrical Energy Generated (MWil)
- 18. Net E!cetrical Energy Generated (MWH)
- 19. Unit Senice Factor
- 20. Ucit Avalability Factor
- 21. Unit Capacity Factor (Using \\tDC Neti
- 22. Unit Capacity factor tusing DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Nest 6 Months (T3pe. Date.and Duration of Eacht:
- 25. If Shut Down At End Of Rc;mrt PerioJ. Estimated Date of Startup-
- 26. Uniss In Test Status (Prior to Commerci21 Operstioni:
Forecset Achiesed INITIA L CRI TICA LITY.
INITIA L ELECTRICITY Cost \\f ERCI A L OPER ATION 8205110621 820505 PDR ADOCK 05000317 (9/77) p PDR
N OPER ATI.N6 DAT A REPORT DOCKET NO. 3.-318 DATE 5/5/82 COMPLETED BY Elaine Lotito TELEP110NE (301) 787 5363 OPERATING STATUS
- 1. Unit Name:
Calvert Cliffs #2 Ni in ' Revision November 1981
- 2. Reportuig PerioJ-
- 3. Licenud ThermalIwwer IMWt).
- 4. Nameplate R: ling igm >s MWe r S. Design Electrical Raim;(Net.4ther
- 6. Masimum DependaMe Capacity (Gross Mbe).
- 7. Maximum Dependab!c Capacity (Net Mhel; i
- 8. If Changes Occur in Capseity Ratina:s tirems Nur-der 3 Thrm.;h 7) Since Last Report.Gise Reasons
- 9. Pouct Lesel To hhich Hestricted. lf Any INet Mhe n ____ __ _.
- 10. Reasons For Restnetions.lf Any:
This hiar.th Yr,to.Da t e Cumulative
- 11. Hours in Reporting Period
- 12. Number Of flours Reactor Was Critical
- 13. Resetor Resene Shutdown Hours
- 14. Bioues Generator On Line
- 15. Unit Resene Shutdown liners
- 16. Gross Thermal Energy Generated (MWHI 15,338,562 84, )90,1W 17 Gross Electrical Energy Genersted IMWif t
- 18. Net Electrical Energy Generated (MWHi
- 19. Unit Senite factor
- 20. Unit Asnilability Factor
- 11. Urd Capacity Factor IUsing \\tDC Neti IL Unit Capacity FactorIU>ing DER Ncti
- 23. Urit Forced Outge Rate
- 24. Shutdowns Schedu!cd Over Nest 6 Months (Type. Date.snd Duration of Eschi:
- 25. If Shut Down At End Of Report PermJ. Estimated Da:e of Startup;
- 24. Unis:In Test Status IPrior to Commercial Oper,tioni Focecast Atinned INITIA L CRITKALITY INITIA L ELECTRICITY COM%IERCI4L OPERTTION P/77)
.