o . ,

6' a

PETER E. KWrZ Baltimore Gas and Electric Company Plant General Manager Calven Cliffs Nuclear Power Plant Calven Cliffs Nuclear Power Plant 1650 Calven Cliffs Parkway Lusby, Maryland 20657 410 495-4101 June 14,1996 U. S. Nuclear Regulatory Commission Washington,DC 20555 ATifNTION: Document Control Desk l

l

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 May 1996 Operating Data Resorts l

The subject reports are being sent to you as required by Technical Specification 6.9.1.6.

Should you have any questions, please contact Mr. Bruce Mrowca at (410) 495-3989.

Very truly yours,

- c-O PEK/if00/bjd Attachments cc: D. A. Brune, Esquire R. A. Hartfield, NRC J. E. Silberg, Esquire R. I. McLean, DNR  ;

Director, Project Directorate I-1, NRC J. II. Walter, PSC A. W. Dromerick, NRC P. Lewis, INPO T. T. Martin, NRC K. N. Larson, ANI Resident Inspector, NRC 9606190285 960531 PDR ADOCK 05000317 R PDR ,

,, 2

'h

. ... .-. -, - ,. _ _ -. _ , , . . . . . . . . ~ . . . . - - - - . - - . . , . -. .

,,0 .

i e

                                                                                                      • x************************

UNIT 1 '

OPERATING DATA REPORT Docket No. 50-317 [

4 June 14, 1996 Prepared by Herman O. Olsen

~

j Telephone : (410) 495-6734 l OPERATING STATUS

~~~~~~~~~~~~~~_.

3 i

t >

l 1. UNIT NAME Calvert Cliffs Unit 1  ;

, 2. REPORTING PERIOD MAY 1996 i l 3. LICENSED THERMAL POWER (MWT) 2700 ,

i 4. NAMEPLATE RATING (GROSS MWe) 918  ;

! 5. DESIGN ELECTRICAL RATING (NET MWe) 845 t

, 6. - MAXIt'UM DEPENDABLE CAP' Y (GROSS MWe) 865 7.. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835

8.= CHANGE IN CAPACITY RATINGS NONE -

l 9. POWER LEVEL TO WHICH RESTRICTED N/A -

} 10. REASONS FOR RESTRICTIONS N/A  ;

j Year- Cumulative j This month to-Date to Date 1

{ ....................................  ;

7

11. HOURS IN REPORTING PERIOD 744 3,647 184,668  :
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2,141.3 133,567.4  !

' 3,019.4

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 i 14. HOURS GENERATOR ON LINE 0.0 2,139.6 130,863.3 ,

, 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

< 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 5,619,077 333,121,081

17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 1,879,636 110,591,336 i
18. NET ELECTRICAL ENERGY GENERATED (MWH) (3,896) 1,796,103 105,320,596 1
19. UNIT' SERVICE FACTOR 0.0 58.7 70.9  :

, 20. UNIT AVAILABILITY FACTOR 0.0 58.7 70.9 }

i 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 59.0 69.0 l

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 58.3 67.5 j
23. UNIT FORCED OUTAGE RATE 0.0 0.0 8.2 i
24. SHUTDOWNS SCHEDULED OVER THE NEXT l SIX MONTHS (TYPE, DATE AND DURATION) :

N/A ( ) Represents a negative value

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP: i 06/25/96- I l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-317 UNTT NAME Cahrrt Cliffs-UI DATE June 14.1996 -

COMPLETED BY liennan O. Olse'n TELEPHONE (410)495-6734 REPORT MONTH May 1996 ,

METIIOD OF SIIUTlING LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT. SYSTEM COMPONENT ACITON TO NO. DATE TYPEI (1IOURS) REASON 2 REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE

- 96002 0330 % S 744.0 C 4 N/A N/A N/A The unit was shutdown for a planned Refueling Outage.

1 F: Forced 2 Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C - Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F - Administrative 9 - Other G - Operational Error H - Other

AVERAGE DAILY UNIT POWER LEVEL

  • o**.*******************************************************************

Docket No. 50-317 Calvert Cliffs Unit No. 1 June 14, 1996 l Prepared by Herman O. Olsen Telephone: (410) 495-6734 MAY 1996 4 Average Daily Power Level Average Daily Power Level I Day (MWe-Net) Day (MWe-Net) 1 -4 17 -6 2 -4 18 -6 1 3 -3 19 -8 4 -3 20 -8 5 -3 21 -6 6 -3 22 -5 7 -3 23 -7 8 -4 24 -9 9 -4 25 -10 10 -4 26 -6 11 -4 27 -6 12 -4 28 -6 13 -5 29 -5 14 -5 30 -7 15 -5 31 -5 16 -6

l

'~

REFUELING INFORMATION REOUEST

1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No,1.
2. Scheduled date for next refueling shutdown: Unit shutdown for refueling March 30,1996 ,
3. Scheduled date for restart following refueling: June 25,1996 *
4. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

f 4

Yes.a

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

4 Alllicensing actions complete.a

6. Im; ortant licensing considerations associated with the refueling.

Physical modifications required to bring Calvert Cliffs in compliance with the Station Blackout rule will be completed in the 1996 Unit I refueling outage.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. ,

i (a) 217 (b) 1522 (Note 2)

Spent fuel pools are common to Units I and 2.

8. (a) 'Ihe present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage
capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710 (Note 1) (b) 0

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 2007 1

I NOTE 1: 4710 total licensed site storage capacity.

1 (1830 pool + 2880 ISFSI)

NOTE 2: 240 Spent Fuel Assemblics in the ISFSI.

Entry has changed since last reported.  ;

4 I

< l

  • - =

DOCKET NO. 50-317

. CALVERT CLIFFS - UNIT I  !

< _ June 14,1996

SUMMARY

OF OPERKflNG EXPERIENCE 1

May 1996 The unit began the month in Mode 6, refueling with the reactor head detensioned. Refueling was completed

- and the unit entered Mode 5, cold shutdown on 05/04/96.  ;

The unit entered a planned extension to the refueling outage to perform expanded Steam Generator eddy

. current inspections. The initial inspections revealed potential tube defects that required an expansion of the original scope of testing. The following significant work was completed or in progress during the month:

- Reactor Vessel refueled.'

- 11 A and 12A Reactor Coolant Pump seal replacement.

- expanded scope of Steam Generator eddy current testing.

i i

I s

a b

d 9

f .

j J-

i I  ;

i 4 **************************************************************************** l UNIT 2 ,

OPERATING DATA REPORT Docket No. 50-318 June 14, 1996 l Prepared by Herman O. Olsen Telephone : (410) 4 95-6734 l OPERATING STATUS

! t

1. UNIT NAME Calvert Cliffs Unit 2  !

?

2. REPORTING PERIOD MAY 1996 l
3. LICENSED THERMAL POWER (MWT) 2700  ;

) 4. NAMEPLATE RATING (GROSS MWe) 911 4

5. DESIGN ELECTRICAL RATING (NET MWe) 845

) 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870 ,

7.-MAXIMUMLDEPENDABLE CAP'Y (NET MWe) 840
8. CHANGE IN CAPACITY RATINGS' NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A

- 10 . REASONS FOR RESTRICTIONS N/A Year- Cumulative I

This month to-Date to Date l
11. HOURS IN REPORTING PERIOD 744 3,647 168,023 l
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,520.3 124,763.1 I

, 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6 4

14. HOURS GENERATOR ON LINE 744.0 3,492.2 123,065.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,998,475 9,312,843 315,643,054

, 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 664,306 3,107,568 104,297,096

18. NET ELECTRICAL ENERGY GENERATED (MWH) 638,947 2,982,878 99,712,322 1 19.-UNIT SERVICE FACTOR 100.0 95.8 73.2
20. UNIT' AVAILABILITY FACTOR 100.0 95.8 73.2
21. UNIT CAPACITY FACTOR (USING MDC NET) 102.2 97.4 71.8 4
22. UNIT CAPACITY FACTOR (USING DER NET) 101.6 96.8 70.2 l 23. UNIT FORCED OUTAGE RATE 0.0 4.9 5.5
24. SHUTDOWNS SCHEDULED OVER THE NEXT l; SIX MONTHS (TYPE,-DATE AND DURATION):

N/A-

! 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A-4 4

.-w

-on-

UNIT SIIUTDOWNS AND POWER REDUCTIONS -

~

DOCKET NO. 50-318 ~

~

UNIT NAME Cahrrt Clifis-U2 DATE June 14.1996 -

COMPLETED BY Herman O. Olsen TELEPHONE (410)4954734' REPORT MONTH May 1996 ,

METIIOD OF SIIUTTING LICENSEE CAUSE & CORRECTIVE -

DURATION DOWN EVENT SYSTEM COMPONENT ACTION TO NO. DATE TYPEI (1IOURS) REASON 2 REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE There were no significant power reductions for this month.

I 1 F: Forced 2 Reason 3 Method- 4 IEEE Standard 805-1984 l S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C - Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load l F- Administrative 9 - Other G - Operational Error H - Other

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 June 14, 1996 Prepared by Herman O. Olsen Telephone: (410) 495-6734 MAY 1996 Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 861 17 861 2 862 18 860 3 860 19 859 4 859 20 858 5 858 21 858 6 859 22 856 7 860 23 855 8 860 24 855 9 861 25 858 10 862 26 855 11 861 27 857 12 858 28 858 13 858 29 858 14 859 30 857 15 861 31 858 16 861

y _ __ . _ _ _ .

REFUELING INFORMATION REOUEST

1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2
2. Echeduled date for next refueling shutdown: March 14,1997
3. Scheduled date for restart following refueling: April 23,1997
4. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes.

a. License Amendment to adopt the requirements of Appendix J, Option B for Type B and C testing.
b. License Amendment to allow the substitution of a blind flange for the outside purge valve pressure boundary in Modes 1-4.
c. License Amendment to allow the use of a temporary closure in place of the equipment hatch in Modes 5 and 6.
d. License Amendment to clarify wording on shutdown cooling maintenance Technical Specification to allow opening in containment during the maintenance.a 1
5. Scheduled date(s) for submitting proposed licensing action and supporting informatic l
a. October 1996 i
b. July 1996
c. July 1996
d. July 1996
6. Important licensing considerations associated with the refueling.

None.

7. & number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1522 (Note 2)

Spent fuel pools are common to Units 1 and 2.

j 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710(Note 1) (b)0

9. The projectd date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 2007 NOTE 1: 4710 total licensed site storage capacity.

(1830 pool + 2880 ISFSI)

NOTE 2: 240 Spent Fuel Assemblies in the ISFSI.

Entry has changed since last reported.

7._. . . -

DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 June 14,1996

SUMMARY

OF OPERATINO EXPERIENCE ,

May 1996 The unit began the month at 100% (860 MWe).

On 05/12/96 at 2215 power was immediately reduced to 95% due to a control element assembly (CEA) being dropped during the performance of a surveillance test. The CEA was restored to the correct position and power was returned to 100% on 05/13/96 at 0300.

The unit remained at 100% power for the remainder of the month.

l l

. -