ML20052F009
Jump to navigation
Jump to search
| ML20052F009 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 05/05/1982 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20052E950 | List: |
| References | |
| NUDOCS 8205110626 | |
| Download: ML20052F009 (2) | |
Text
-
e OPERATLNG DATA REPORT 50-317 DDCKET NO. E3/82 DATE COMPLETED BY Elaine Lotito TELEPHONE (301) /61-3363 OPERATING STATUS Calvert Cliffs #1 Notes -Revision
- 1. Unit Name:
ce er 1981 _
- 2. Reporting Period,
- 3. Licensed Thermal Power iMW:):
- 4. Nameplate Rating (Gross MWe):
S. Design Electrical Ratmg (Net MWe):
- 6. Maxim im Dependable Capacity (Gross MWe)
- 7. Maximusn Dependabic Capacity (Net MWe):
- 8. If Changes Oecur in Capacity Ratings tirems Numter 3 Through 7) Since Last Report.Gi e Reasons.
- 9. Power Lesel To bhich Hestricted. If Any iNet 4 hen:
- 10. Reasons for Restrictions,if Any:
8 This Month Yr.-to-Dat e Cumulative
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line
- 15. Unit Resene Shutdown linurs
- 16. Cross Thermal Energy Generated iMWH)
___19,352.686 109.919,478
~
- 17. Gross Electrical Energy Genersted IMWH)
- 18. Net E!cetrical Energy Generated (MWlh
- 19. Unit Senice Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor tusing MDC Neti
- 22. Unit Cepacity f actor L'>ing DER Net!
- 23. Unit Forced Cutage Rate g4. Shutdowns Scheduled Over Nest 6 Months tT.Spe. Date.and Duration of Each):
- 25. If Shut Down At End Of Regwort PerioJ. Estimated Date of Startup:
- 24. Units In lest Status (Prior o Commerci21 Operstion t Forecast Achieted INITIA L CRITIC A LITY.
INITIA L ELECTRICITY CONI \\lERCl \\ L OPE R ATION 8205110626 820505 PDR ADOCK 05000 top 7)
R
OPER ATlw D
- T A l'LPORT DOCKET NO.50-318 DATE 5/5/82 COMPl.ETED BY Elaine Lotito TELEPil0NE (301) 787--5363 OPERATING STATUS
- 1. Unit Name:
Calvert_f.11Lfs.12,
Revision
- 2. Reporting Period.
December 1981 3, LicenwJ ThermalI uwer 6.'.lW:t
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electriest Raung(Net MWet
- 6. Masirnum DependaWe Capacity IGross Mbek l
- 7. Maximum Dependable Capacity (Net Mheb
- 8. If Changes Oecur in Cap.eesty Ratings (items Nurnter 3 lhrn ph 7) Since Last Report.Clie Reasons.
l
- 9. Power Lesel To hhich Hestricted,if An) (Net 4tN I-
- 10. Reasons For Restrictions. lf Any:
lhis hbnti.
Yr.to-Date Curnulative
- 11. ifours in Reporting Period t
- 12. Number Ofitoun Reactor Was Criticst
- 13. Rescrer Resene Shutdown ilours
- 14. Hours Generator On Lme
- 15. Unit Resene Shutdown linun
- 16. Gross Therrnal Energy Generated tMWill
_ 17,292,925 86,044,556
- 17. Gross Elcetrical Energy Generated l\\ twill IS. Ne Electrical Energy Generated (MWHi
- 19. Urdt Senice Factor
- 20. Unit Availability Factor
- 25. Unit Capseity Factor IUsing \\tDC Nett
- 22. Ur.it Capacity Factor IU>ing DER Net!
- 23. Unit Forced Outaa Rate
- 24. Shutdowns Scheduled Oser Nes 6 Months II)pe. Date.and Durstmn of Escht:
- 25. If Shut Down At End Of Report perioJ. Estimated Date of Startup:
- 26. Units in Test Status lPrior to Commercial Oper.+tioni Forecast Achieved INITI AL CRITICALITY.
INITIAL ELECTRICITY COMilERCI AL OPI R \\ TION l
D/77)
_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - -._