ML20052F009

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for Dec 1981
ML20052F009
Person / Time
Site: Calvert Cliffs  
Issue date: 05/05/1982
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20052E950 List:
References
NUDOCS 8205110626
Download: ML20052F009 (2)


Text

-

e OPERATLNG DATA REPORT 50-317 DDCKET NO. E3/82 DATE COMPLETED BY Elaine Lotito TELEPHONE (301) /61-3363 OPERATING STATUS Calvert Cliffs #1 Notes -Revision

1. Unit Name:

ce er 1981 _

2. Reporting Period,
3. Licensed Thermal Power iMW:):
4. Nameplate Rating (Gross MWe):

S. Design Electrical Ratmg (Net MWe):

6. Maxim im Dependable Capacity (Gross MWe)
7. Maximusn Dependabic Capacity (Net MWe):
8. If Changes Oecur in Capacity Ratings tirems Numter 3 Through 7) Since Last Report.Gi e Reasons.
9. Power Lesel To bhich Hestricted. If Any iNet 4 hen:
10. Reasons for Restrictions,if Any:

8 This Month Yr.-to-Dat e Cumulative

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line
15. Unit Resene Shutdown linurs
16. Cross Thermal Energy Generated iMWH)

___19,352.686 109.919,478

~

17. Gross Electrical Energy Genersted IMWH)
18. Net E!cetrical Energy Generated (MWlh
19. Unit Senice Factor
20. Unit Availability Factor
21. Unit Capacity Factor tusing MDC Neti
22. Unit Cepacity f actor L'>ing DER Net!
23. Unit Forced Cutage Rate g4. Shutdowns Scheduled Over Nest 6 Months tT.Spe. Date.and Duration of Each):
25. If Shut Down At End Of Regwort PerioJ. Estimated Date of Startup:
24. Units In lest Status (Prior o Commerci21 Operstion t Forecast Achieted INITIA L CRITIC A LITY.

INITIA L ELECTRICITY CONI \\lERCl \\ L OPE R ATION 8205110626 820505 PDR ADOCK 05000 top 7)

R

OPER ATlw D

  • T A l'LPORT DOCKET NO.50-318 DATE 5/5/82 COMPl.ETED BY Elaine Lotito TELEPil0NE (301) 787--5363 OPERATING STATUS
1. Unit Name:

Calvert_f.11Lfs.12,

Revision

2. Reporting Period.

December 1981 3, LicenwJ ThermalI uwer 6.'.lW:t

4. Nameplate Rating (Gross MWe):
5. Design Electriest Raung(Net MWet
6. Masirnum DependaWe Capacity IGross Mbek l
7. Maximum Dependable Capacity (Net Mheb
8. If Changes Oecur in Cap.eesty Ratings (items Nurnter 3 lhrn ph 7) Since Last Report.Clie Reasons.

l

9. Power Lesel To hhich Hestricted,if An) (Net 4tN I-
10. Reasons For Restrictions. lf Any:

lhis hbnti.

Yr.to-Date Curnulative

11. ifours in Reporting Period t
12. Number Ofitoun Reactor Was Criticst
13. Rescrer Resene Shutdown ilours
14. Hours Generator On Lme
15. Unit Resene Shutdown linun
16. Gross Therrnal Energy Generated tMWill

_ 17,292,925 86,044,556

17. Gross Elcetrical Energy Generated l\\ twill IS. Ne Electrical Energy Generated (MWHi
19. Urdt Senice Factor
20. Unit Availability Factor
25. Unit Capseity Factor IUsing \\tDC Nett
22. Ur.it Capacity Factor IU>ing DER Net!
23. Unit Forced Outaa Rate
24. Shutdowns Scheduled Oser Nes 6 Months II)pe. Date.and Durstmn of Escht:
25. If Shut Down At End Of Report perioJ. Estimated Date of Startup:
26. Units in Test Status lPrior to Commercial Oper.+tioni Forecast Achieved INITI AL CRITICALITY.

INITIAL ELECTRICITY COMilERCI AL OPI R \\ TION l

D/77)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - -._