PETru E. KATz Baltimore Gas and Electric Company o
Calvert Cliffs Nuclear Power Plant Plant General Manager Calvert Cliff Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 October 15,1996 U. S. Nuclear Regulatory Commission Washington, DC 20555 1
ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuc! car Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 September 1996 Operating Data Reports l
l The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
Should you have any questions, please contact Mr. Bruce browca at (410) 495-3989.
l Very truly yours, l
/ /
i 1
l p P'
/
l PEK/llOO/bjd Attachments cc:
D. A. Brune, Esquire R. A. Ilartfield, NRC
)
I J. E. Silberg, Esquire R. I. McLean, DNR l
Director, Project Directorate 1-1, NRC J.11. Walter, PSC l
A. W. Dromerick, NRC P. Lewis, INPO
,l f f/f 9610210176 960930 4
ri R
PDn 210041
UNIT 1 OPERATING DATA REPORT Docket No. 50-317 October 15, 1996 Prepared by Herman O. Olsen Telephone : (410) 4 95-6734 OPERATING STATUS 1.
UNIT NAME Calvert Cliffs Unit 1 2.
REPORTING PERIOD SEPTEMBER 1996 3.
LICENSED THERMAL POWER (MWT) 2700 4.
NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Year-Cumulative This month to-Date to Date j
j
- 11. HOURS IN REPORTING PERIOD 720 6,575 187,596
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 3,660.4 135,086.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 720.0 3,554.2 132,277.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,931,022 9,282,542 336,784,546
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 634,135 3,069,069 111,780,769
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 608,302 2,916,820 106,441,313
- 19. UNIT SERVICE FACTOR 100.0 54.1 70.5
- 20. UNIT AVAILABILITY FACTOR 100.0 54.1 70.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.2 53.1 68.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.0 52.5 67.1
- 23. UNIT FORCED OUTAGE RATE 0.0 18.8 8.6
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A
m UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-317 UNIT NAME Calvert Clifts-UI DATE October 15.1996 COMPLETED BY 11erman O.Olsen TELEPilONE (410)495-6734 REPORT MONTH September 1996 METilOD OF SillTFTING LICENSEE CAUSE & CORRECTIVE
- DURATION DOWN EVENT SYSTEM
. COMPONENT ACTION TO
' NO.
DATE 1YPEI I (IIOURS)
REASON 2 REACTOR 3 REPORT #
CODE 4 CODE 5 PREVENT RECURRENCE There w ere no significant power reductions for this month.
l 1 F: Forced 2 Reason:
3 Method:
4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued
' E - Operator Training & License Examination 5 - Reduced Load F-Administrative 9 - Other G - Operational Error H - Other i
- AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 October 15, 1996 Prepared by Herman O. Olsen Telephone: (410) 495-6734 SEPTEMBER 1996 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 837 17 846 2
839 18 849 3
840 14 849 4
840 20 849 5
841 21 850 6
842 22 849 i
7 840 23 850 8
840 24 849 9
840 25 851 10 839 26 852 11 839 27 851 12 839 28 851 13 841 29 852 14 842 30 851 15 844 16 844
REFUELING INFORMATION REOUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2.
Scheduled date for next refueling shutdown: March 1998 i
3.
Scheduled date for restart fallowing refueling: May 1998 4.
Will refueling or resumption ofoperation thereafter require a Technical Specification change or other license amendment?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
4 N/A 6.
Impoitant licensing considerations associated with the refueling.
N/A 7.
The number of fu:1 assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1474 (Note 2)
- Spent fuel pools are common to Units 1 and 2.
8.
(a) he present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 4710(Note 1)
(b) 0 j
\\
l 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assunung the present licensed capacity and maintaining space for one full core off-load.
f March 2007 s
NOTE 1:
4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2:
288 Spent Fuel Assemblies in the ISFSI.
- Entry has changed since last reported.
a
DOCKEi NO. 50-317 CALVERT CLIFFS - UNIT 1 October 15,1996
SUMMARY
OF OPERATING EXPERIENCE September 1996 He unit operated at 100% (approximately 840 MWe) for the entire month.
I i
i
UNIT 2 OPERATING DATA REPORT l
i Docket No. 50-318 October 15, 1996 Prepared by Herman O. Olsen Telephone : (410) 4 95-6734 OPERATING STATUS
- I
~~~~~~~~~~~~~~~~
1.
UNIT NAME Calvert Cliffs Unit 2 2.
REPORTING PERIOD SEPTEMBER 1996 3.
LICENSED THERMAL POWER (MWT) 2700 4.
NAMEPLATE RATING (GROSS MWe) 911 5.
DESIGN ELECTRICAL RATING (NET MWe) 845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 8.
CIUtNGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Year-Cumulative This month to-Date to Date 4
- 11. HOURS IN REPORTING PERIOD 720 6,575 170,951 1
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,448.3 127,691.1 l
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 720.0 6,420.2 125,993.6
'=
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,919,423 17,078,769 323,408,980
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 623,534 5,651/537 106,841,065
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 598,701 5,426,646 102,156,090
- 19. UNIT SERVICE FACTOR 100.0 97.6 73.7 l
- 20. UNIT AVAILABILITY FACTOR 100.0 97.6 73.7 i
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.0 98.3 72.3
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.4 97.7 70.7 4
- 23. UNIT FORCED OUTAGE RATE 0.0 2.7 5.4
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION) :
N/A
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, 3
ESTIMATED DATE OF START-UP:
]
N/A 1
P i
l l
1
UNIT SHUTDOWNS AND POWER REDUCTIONS
. DOCKET NO.
50-318 UNITNAME Calvert ClitTs-U2 DATE October 15.1996 COMPLETED BY Herman O.Olsen TELEPIIONE (410)495-6734 REPORT MONTH September 1996 l
METHOD OF SIIUTTING LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSTEM COMPONTNT ACTION TO NO.
DATE
'TYPEI (IIOURS)
REASON 2 REACTOR 3 REPORT #
CODE 4 CODES PREVENT RECURRENCE There were no significant power reductions for this month.
T C
t l
1 F: Forced 2 Reason:
3 Method:
4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination.
5 - Reduced Load F-Administrative 0 - Other G - Operational Error II-Other
' AVERAGE DAILY UNIT POWER LEVEL
- w*******************
Docket No. 50-318 Calvert Cliffs Unit No. 2 October 15, 1996 Prepared by Herman O.
Olsen Telephone: (410) 495-6734 SEPTEMBER 1996 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 834 17 840 2
836 18 842 3
837 19 843 4
837 20 843 5
836 21 844 6
837 22 843 7
751 23 844 8
739 24 842 9
778 25 844 10 832 26 844 11 834 27 845 12 834 28 845 13 836 29 846 14 837 30 847 15 838 16 837
REFUELING INFORMATION REOUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 2.
Scheduled date for next refueling shutdown: March 14,1997 3.
Scheduled date for restart following refueling: April 28,1997
- 4.
Will refueling or resumption of operation thereafter require a Technical Specification change or.
other license amendment?
Yes.
a.
License Amendment to adopt the requirements of Appendix J, Option B for Type B and C testing.
b.
License Amendment to allow the substitution of a blind flange for the outside purge valve pressure boundary in Modes 1-4.
c.
License Amendment to allow the use of a temporary closure in place of the equipment hatch in Modes 5 and 6.
d.
License Amendment to lower the reactor coolant flow which supports an increased i
number of steam generator tubes plugged.
i License Amendment to clarify wording on shutdown cooling maintenance Technical c.
Specification to allow openings in containment during the maintenance.
f.
License Amendment to allow electrosteeving as a repair method for steam generator tubes.
5.
Scheduled date(s) for submitting proposed licensing action and supporting infomtation.
a.
October 1996 b.
August 1,1996 c.
October 1996
- d.
January 1997
- e.
October 1996
- f.
July 26,1996 6.
Important licensing considerations associated with the refueling.
None.
7.
'Ihe number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1474 (Note 2)
- l Spent fuel pools are common to Units 1 and 2.
8 (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblics.
(a) 4710(Note 1)
(b) 0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
March 2007 NOTE 1:
4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2:
288 Spent Fuel Assemblies in the ISFSI.
- Entry has changed since last reported.
I 4
l 4
l 4
- .:..~
q
- DOCKId NO. 50,18
- CALVERT CLIFFh - UNIT 2 October 16,1996
SUMMARY
OF OPERATING EXPERIENCE September 1996 The unit began the month at 100% power.
On 09/07/96 0230 power was reduced to 90% to perform waterbox cleaning.: Power was restored to 100% on 09/09/96 at 1700 The unit remained at 100% power for the remainder of the month.
1 O
.,.,,