PETER F. KATZ 15ahunore Gas and Electric Company Plant General Manager Calvert Cliffs Nuclear Power Plant Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495 4101 June 13,1997 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docht Nos. 50-317 & 50-318 hia).1997 Ooerating Data Reoorts The subject reports are being ser:t to you as required by Technical Specification 6.6.4.

Should you have any questions, please contact Mr. Kenneth Greene at (410) 495-4385.

Very truly yours, jj L

PEK/HOO/bjd r@ L Attachments cc:

R. S. Fleishman, Esquire R. A. Hartfield, NRC J. E. Silberg, Esquire R. I. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC Directcr, Project Directorate 1-1, NRC P. Lewis, INPO g

H. J. Miller, NRC K. N. Larson, ANI I

Resident inspector, NRC 9706190107 970531 igip!,J,gg}g PDR ADOCK 05000317 a

e.

180034

?

~

QQ**************************************************************************

i l

. UNIT 1 OPERATING DATA REPORT I

  • o************************************+*Docket No. 50-317 l

June 13, 1997 Prepared by Herman O. Olsen Telephone : (410) 495-6734 i

OPERATING STATUS

~~~~-~~~~~~~~~~~

Calvert Cliffs Unit 1

1. UNIT NAME
2. REPORTING PERIOD MAY 1997 l
3. LICENSED THERMAL POWER (!Gfr) 2700
4. NAMEPLATE RATING (GROSS MWe) 918
5. DESIGN ELECTRICAL PATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 I
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A i
10. REASONS FOR RESTRICTIONS N/A l

I Year-Cumulative This month to-Date to Date

[

11. HOURS IN REs0RTING PERIOD 744 3,623 193,428
12. NUMBER OF HOURS REACTOR WAS CRITICAL 691.6 3,570.6 140,866 1 l
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4

{

14. HOURS GENERATOR ON LINE 690.3 3,539.2 130,026.1 i

l

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS. THERMAL ENERGY GENERATED (b@m) 1,841,570 9,486,753 352,215,072
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 614,202 3,174,498 116,939,860 l
18. NET ELECTRICAL ENERGY GENERATED (MWH) 588,518 3,047,615 111,395,807 i
19. UNIT SERVICE FACTOR 92.8 97.7 71.4 i
20. UNIT AVAILABILITY FACTOR 92.8 97.7 71.4
21. UNIT CAPACITY FACTOR (USING MDC NET) 94.7 100.7 69.7 l
22. UNIT CAPACITY FACTOR (USING DER NET) 93.6 99.5 68.2
23. UNIT FORCED OUTAGE RATE 7.2 2.3 8.3 1

I

24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION) :

N/A

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

06/02/97 y

i i

i i

w

l v!(l

!;[([![

,[-

liLli;7f ![:

,i i

~

k y e

t e

ab g

a h

h ed

~

t n

h

n. f t

al t

e n

f it i

I n

e a t

U e

d oh mht o

y i

f s

7 l

4 t

s f

s f

9 O 7 e nf. o ly f

i 3

n s oT 3

r a sd r

t d

r b e e

k 8

f l

o o 4

v r

i 9

. 6 d c as gh mb ed o

8 9

lC

. O 5

t e x a n o e myrpe o

1 w

9 1

edewi t

tn 3 n 9 a

t s

1 A

tt s et ia c

d e

incki n a s s e nl a 4 i

u l

w r

5 3

1 m

E E

d a

si p e

s eb

)

0 n sd en o e ah e ue a 0

0 v

e l

n e

1 V

C i ael r

et r a

y s

o e,

( b ic 8

8 od pr wr ei t a

N s

u i

4 I

e e sl d

d CJ l

(

T E

el u

r s s l

ah p a

a w gd H s ga p r

r eh pa ub C

R EO R k k p. ps m wt a g) a d

d ai r s a c RT U a aad ma i ghi pd e n

n e nt lp aleh a

a RNC l le ri e

ow r

t t

t s gc

.hi s p la gb OOE t

o S

S EE t

t n

M T YE CI R me a r s i

a mt e

T eh wh e or yf io t t iab et r ic ed E

E e

A DD O EAN yd e int A BN

&CT c

s s

r t a

e E

E l

a pdhl e n s mt e e eTl h a ad E

E e

w N

Ei S

E s

s a

d l

on r r m or e et u

.t w

.h ya I

I T

TP U

V t

s r cl n rPf mh u cni n pmpn c

a gndi e r d 4

5 E E A

E ai a

e I

f t

N L L C

R lo n

.d u

d i r a P

e rd n a

s t

U PE o otn vt n ai e e

o t

h d r a r d M T c c u o a o sn c wf t

e rf pe nomid oo z

r ok nOtcf s i O

oome o

r e t

ai e

ei l S

C c i r et t

O vie

r. i la) e s. pd s ga.

t N

a a a z

r s s

3l s ys le u n u e gd r o e el n u ei d g t

Ae w wus e r ci t

t i e a m

s sid h pe e eTf ck dh t

I t

s s oT r r

.a u p w (m. m r T

vl oie a eh e oc r

mc d

n r oo c

r a C

. nl 2 c c ws3.h a

pp 1 i a aS t

r o

U jIfj i!jj;l!ljjl!llll>

j il

.i.

Si D

ccd L ed E

T tau e l l N

aami c R

ES n

uu r

R NE F

d nn ot u e ndh t

OD S

oaa uoet E

P O P

hMMACRO W

MC e

t O

O M1 23459 7

C P

9 jI{!

lllj>

3 9

D 2

1 M4 N

y EE A

a T)

B L

S O A S

M Y C N

S W

H i

i,lI

!}

!jl!li lil!i.

O T

m D

N E

ETT n

T O

SNR o

3 i

U M

NEO 0

a 0

t E VP H

T C EE 7

n S

R L

R 9

i I

m T

O jjjI llf il l'

i E

~

a x

I P

N E

U F

e m

R OG 3

s R

N n

DI NO e

TWT ic O. 2 O C nL 1

f.

D A o

l l

t i&

E s

r i t

MS R

ee c

uT ig r

r r

t n

o l

r si r

li!

jil!i[j' l

i r

a o ene N

Fe Rive 2

c r t l ai y

aa O

teagrTr n n n

SA A or t

o n nt s it E

meliat oi n n u urairar pt el R

iuif gemeh e

n l

,!ljl

,!l!li!!;

oqa e e pd pt N) sEMRROAOO OS a

e I

R 1

A U 8

RABCDEFG1 T

O 3

R l

5 2

Ul D(

l!

f

,jl~

!l;lj!li!iI I

EP Y

F T

l!!

llj!lI il

,l' jl:!

4!'

ii d

E 9

le 7

/

d u T

9 ed A

2 c e

/

D 5

rh 0

oc lf

.i!!!li

l!

FS 2

0 FS O

0-N 7

I 9

l

,4 4'

REFUEI,1NG INFORMATION REOUEST 1.

Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.

2.

Scheduled date for next refueling shutdown: March 1998 3.

Scheduled date for restart following refueling: May 1998 l

4.

Will refueling or resumption of operation thereaner require a Technical Specification change or other license amendment?

Yes.

  • 1.

License Amendment to change Technical Specification Surveillance Requirements for No. IB Emergency Diesel Generator upgrade.

  • l l

2.

Letter to request exemption from G:neral Design Criteria 2 for Nos. l A and 2B l

Emergency Diesel Generator tornado doors.

  • 5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

1.

September 1997

  • t 2.

September 1997

  • l 6.

Important licensing considerations associated with the refueling.

1 None.

  • 7.

He number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1494 (Note 2)

Spent fuel pools are common to Units 1 and 2.

i j

8.

(a) he present licensed spent fuel pool storage capacity, and (b) the size of any increase in l

licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

l-(a) 4710 (Note 1)

(b) 0 l

9.

He projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 2007 NOTE 1:

4710 total licensed site storage capacity.

(1830 pool + 2880 ISFSI)

NOTE 2:

360 Spent Fuel Assemblies in the ISFSI.

Entry has changed since last reported.

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 June 13, 1997 Prepared by Herman O. Olsen Telephone: (410) 495-6734 MAY 1997 Average Daily Power Level Average Daily Power Level Day (MWe-Net)

Day (MWe-Net) 1 867 17 751 2

867 18 780 3

866 19 848 4

863 20 858 5

863 21 856 6

864 22 860 7

863 23 862 8

863 24 862 9

865 25 863 10 865 26 862 11 865 27 861 12 865 28 860 13 864 29 632 14 864 30

-31 15 864 31

-30 l

16 861 l

l I

t I

{

DOCKET NO. 50-317 CALVERT CLIFFS - UNIT 1 June 13,1997

SUMMARY

OF OPERATING EXPERIENCE May 1997 The unit began the month at 100% power.

On 05/29/97 at 1645, a rapid reduction in power was made due to indications of excessive reactor coolant system leakage At 1650 a reactor shutdown was commenced due to a leak on a pressurizer pressure instrument line compression fitting. The unit was removed from the grid at 1815 and the reactor was shutdown and in mode 3 (hot standby) at 1935.

The unit remained in mode 3 (hot standby) for the remainder of the month.

l l

i l

I l

i s

4 k

9 l

l v

e m

~

l l

l oqo*************************************************************************

UNIT 2 OPERATING DATA REPORT oco*************************************************************************

l Docket No. 50-318 June 13, 1997 Prepared by Herman O. Olsen Telephone : (410) 4 95-6734 OPERATING STATUS

~~~~~~~~~~~~~~~~

1.

UNIT NAME Calvert Cliffs Unit 2

2. REPORTING PERIOD MAY 1997 3.

LICENSED THERMAL POWER (MWT) 2700 4.

NAMEPLATE RATING (GROSS MWe) 911 5.

DESIGN ELECTRICAL RATING (NET MWe) 845 6.

MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870 7.

MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 8.

CHANGE IN CAPACITY RATINGS NONE 9.

POWER LEVEL TO WHICH RESTRICTED N/A

10. REASONS FOR RESTRICTIONS N/A Year-Cumulative This month to-Date to Date
11. HOURS IN REPORTING PERIOD 744 3,623 176,783
12. NUMBER OF HOURS REACTOR WAS CRITICAL 257.2 2,011.1 131,853.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
14. HOURS GENERATOR ON LINE 211.8 1,964.1 130,099.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 450,488 4,961,899 334,056,283
17. GROSS ELECTRICAL ENERGY GEN'TED (MWH) 151,152 1,664,244 110,401,658
18. NET ELECTRICAL ENERGY GENERATED (MWH) 135,860 1,585,657 105,562,840
19. UNIT SERVICE FACTOR 28.5 54.2 73.6
20. UNIT AVAILABILITY FACTOR 28.5 54.2 73.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 21.7 52.1 72.2
22. UNIT CAPACITY FACTOR (USING DER NET) 21.6 51.8 70.7
23. UNIT FORCED OUTAGE RATE 0.0 0.0 5.3
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

N/A

25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A l

?

1 I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-31&

UNIT NAME Calvert Clifts-U2 DATE June 13.1997 COMPLETED BY 11erman O. Olsen TELEPliONE (4IO)495-6734 e

REPORT MONTH May 1997 ME1110D OF l

SI(UTTING LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSTEM COMPONENT ACTION TO I

4 CODES PREVENT RECURRENCE WO.

DATE TYPE 3 ! (IlOURS)

REASON 2 REACTOR 3 REPORT #

CODE 97001

' 03/14/97 S

529.3 l

C 4

N/A N/A l

N/A i The unit was shutdown for a planned Refueling Outage.

I i

97002 05/23/97 S

2.9 B

9 N/A JJ 12 The unit was removed from the grid for overspeed testing of the Main Turbine.

i l

1 I

I i

I i

j I

i i

t 1 F: Forced 2 Reason:

3 Method:

4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram.

5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F - Administrative.

9 - Other G - Operational Error 11 - Other

REFUELING INFORMATION REOUEST 1.

Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 2.

Scheduled date for next refueling shutdown: March 1999

  • 3.

Scheduled date for restart following refueling: May 1999

  • 4.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

N/A

  • 5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

N/A

  • 6.

Important licensing considerations associated with the refueling.

None.

7.

The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1494 (Note 2)

Spent fuel pools are common to Units 1 and 2.

8.

(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710 (Note 1)

(b) 0 9.

The projected date of the last refueling that can be discharged to the Spent fuel Pool assuming the present licensed capacity and maintaining space for one full core oft-load.

March 2007 i

NOTE 1:

4710 totallicensed site storage capacity.

(1830 pool + 2880 ISFSI)

NOTE 2:

360 Spent Fuel Assemblies in the ISFSI.

Entry has changed since last reported.

AVERAGE DAILY UNIT POWER LEVEL oqo*********************************************************************

Docket No. 50-318 Calvert Cliffs Unit No. 2 June 13, 1997 Prepared by Herman O. Olsen Telephone: (410) 495-6734 MAY 1997 Average Daily Power Level Average Daily Power Level Day (MWe-Net)

Day (MWe-Net) l 1

-7 17

-23 2

-8 18

-29 3

-9 19

-29 4

-10 20

-30 5

-11 21

-34 6

-10 22

-33 7

-10 23 108 8

-10 24 469 9

-4 25 706 10

-5 26 731 11

-7 27 756 12

-8 28 799 13

-9 29 787 14

-9 30 788 15

-8 31 830 16

-9

\\

l i

I

DOCKET NO. 50-318 OALVERT CLIFFS - UNIT 2 June 13,1997

SUMMARY

OF OPERATING EXPERIENCE May 1997 The unit began the month in mode 6 (refueling).

The following significant outage work was completed during the month:

- Reactor Vessel Refueling.

- Steam Generator Eddy Current Testing.

- Diesel Engine Operability Testing.

The outage ended when the unit was paralleled to the grid on 05/23/97 at 0119.

The unit was removed from the grid at 1507 on 05/23/97 to perform Main Turbine overspeed testing.

After the completion of the overspeed testing the unit was again paralleled to the grid at 1800.

Power was raised in increments to allow the required physics testing following the refueling outage. The unit reached 100% on 05/29/97 at 2050.

The unit operated at 100% for the remainder of the month.