ML20094M016

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1995 for Calvert Cliffs Nuclear Plant
ML20094M016
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/31/1995
From: Cruse C, Olsen H
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9511210229
Download: ML20094M016 (12)


Text

"

CHAOLEs H. CRUSE Baltimore Gas end Electric Company Plant General Manager Calvert Cliffs Nuclear Power Plant Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway '

l Lusby, Maryland 20657 410 586-2200 Ext. 4101 Local l 410 260-4101 Baltimore l November 15,1995 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 October 1995 Operatina Data Reports The subject reports are being sent to you as required by Technical Specification 6.9.1.6.

Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.

Very truly yours, CHC/HOO/bjd y

~

Attachments cc: D. A. Brune, Esquire R. A. Hartfield, NRC J. E. Silberg, Esquire R. I. McLean, DNR L. B. Marsh, NRC J. H. Walter, PSC D. G. Mcdonald, Jr., NRC P. Lewis, INPO T. T. Martin, NRC K. N. Larson, ANI Resident Inspector, NRC

h. ]r )] J 3 r 9511210229 951031 PDR R

ADOCK 05000317 PDR

{fl I

(

l l

l l

oce*************************************************************************

UNIT 1 OPERATING DATA REPORT

co**************************************************************************

Docket No. 50-317 November 15, 1995 Prepared by Herman O. Olsen Telephone: (410) 260-6734 OPERATING STATUS

1. UNIT NAME Calvert Cliffs Unit 1
2. REPORTING PERIOD OCTOBER 1995
3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 918
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Year- Cumulative
  • This month to-Date to Date
11. HOURS IN REPORTING PERIOD 745 7,296 179,557
12. NUMBER OF HOURS REACTOR WAS CRIT *A CAL 745.0 7,190.4 130,071.1
13. REACTOR RESERVE SNUTDOWN HOURS 0.0 0.0 3,019.4
14. HOURS GENERATOR ON LINE 745.0 7,179.0 127,415.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THE,RMAL ENERGY GENERATED (MWH) 1,995,187 19,111,056 324,278,949
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 650,427 6,275,783 107,646,399
18. NET ELECTRICAL ENERGY GENERATED (MWH) 623,792 6,016,217 102,510,485
19. UNIT SERVICE FACTOR 100.0 98.4 71.0
20. UNIT AVAILABILITY FACTOR 100.0 98.4 71.0
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.3 98.8 69.1
22. UNIT CAPACITY FACTOR (USING DER NET) 99.1 97.6 67.6
23. UNIT FORCED OUTAGE RATE 0.0 1.6 8.5
24. SHUTDOWNS SCHEDULED OVER THE NEXT ,

SIX MONTHS (TYPE, DATE AND DURATION):  !

Refueling 03/15/96 47 days

  • Time change
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A 9

.. .,- . - . . _ . _ - . - = . . - - - . - . . - . - . - . - . - . . - . . . . - - .-

AVERAGE DAILY UNIT POWER LEVEL oce*********************************************************************

Docket No. 50-317 Calvert Cliffs Unit No. 1 ]

November 15, 1995 ,

Prepared by Herman O. Olsen Telephone: (410) 260-6734 OCTOBER 1995  !

                              • l Average Daily Power Level Average Daily Power Level Day (MWe-Nat) Day (MWe-Net) 1 839 17 849 2 839 18 848 3 838 19 850 4 838 20 850 5 837 21 851 6 837 22 852 7 835 23 852 8 834 24 845 9 838 25 849 10 834 26 855 11 833 27 827 12 832 28 851 13 833 29 889 l

14 757 30 854 l 1

15 747 16 847 4

l

4 DOCKET NO. 50-317 CALVERT CLIFFS - UNIT I November 15,1995

SUMMARY

OF OPERATING EXPERIENCE October 1995 De unit began the month at 100% (835 MWe).

A scheduled power r4+ ww==M at 0410 on 10/14/95. He reduction was required to clean waterboxes. Power was reduced to 90% at 0510. Power was increased at 2210 on 10/15/95 and returned to 100% at 0000 on 10/16/95.

Power was reduced to 95% at 0955 on 10/27/95 to allow securing of a Circulating Water pump. %e unit remamed at the reduced power to investigate a suspected waterbox saltwater leak. No leakage was found and power was returned to 100% at 0045 on 10/28/95.

He unit continued to operate at 100% power (840 MWe) for the remamder of the month.

1

REFUELING INFORMATION REOUEST

1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2. Scheduled date for next refueling shutdown: March 15,1996
3. Scheduled date for restart following refueling: May 1,1996 *
4. Will refueling or resmtpion of operation thereafter require a Technical Specification change or otherlicense amendment?

Yes.

a. License amendment to allow installation of a new diesel generator.
b. License amendment to reflect the new electrial distribution system configuration.
c. An amendment and exemption to allow the use of four lead fuel assemblies with advance cladding materials.
d. License amendment to extend some instrument surveillances to allow a delayed start of the refueling outage.
c. License amendment to extend the requirement to do an ILRT so that the test does not have to be performed this outage a
f. License amendment to modify the MTC limits to account for additional steam generator tubes plugged.
g. License amendment which would allow the sleeving of steam generator tubes as a repair method.
5. Scheduled date(s) for submitting proposed licensing action and supporting information.
a. October 2,1995 a
b. November 1995 *
c. July 13,1995
d. October 20,1995*
c. November 1995 a
f. January 1996 a
g. Novembei M
6. Important licensing considerations associated with the refueling.

Physical modifications required to bring Calvert Cliffs in compliance with the Station Blackout rule will be completed in the 1996 Unit I refueling outage.

_~

. l I

'?. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. )

(a) 217 (b) 1434 (Note 2) {

Spent fuel pools are common to Units 1 and 2.

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710 (Note 1) (b)0 1

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the l present licensed capacity and nr.intaining space for one full core off-load.

March 2007 NOTE 1: 4710 total licensed site storage capacity.

1830 pool + 2880 ISFSI) l NOTE 2: 240 Spent Fuel Assemblies in the ISFSI.

a Entry has changed since last reported. I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-317 UNIT NAME Cahat tw=-UI - ,

DA1E Npvember 15.1995 .

COMPLETED BY Henman O. Olsea TELEPHONE (4101260 4 734 REPORTMONTH October 1995 -

METHOD OF ,

SHUITING LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSTBd COMPONENT ACTION TO  !

NO. DATE TYPEI (HOURS) REASON 2 REACTOR 3 REPORT # CODE 4 CODE 5 PREVENT RECURRENCE There were no sagnificant power reductions for this anonth.

I i

t P

1 F: Forced 2 Reason. 3 Method. 4 IEEE Standard 805-1984 S: Scheduled A - E,;y..a4 Failure 1 - Manual B - Maintenance orTest 2 - Manual Scram.

C - Refuchng 3 - Automatic Scrarn. 5 IEEE Standard 803A-1983 D - Regulatory Restnction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F- Aer suative 9 - Other G - Operational Error H - Other l

_ u____ _ _ _ _ - _ _ _ . _ _ - - _ . _ _ _ . _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ _ - _ _ _ _ _ _ _-- ___-_-_--_-__2- + ' - _ _ _-_a e - -. -_ ___u_m _. m_-_m.

cc**************************************************************************

UNIT 2 OPERATING DATA REPORT oce*************************************************************************

Docket No. 50-318 November 15, 1995 Prepared by Herman O. Olsen Telephone:(410)260-6734 OPERATING STATUS

1. UNIT NAME Calvert Cliffs Unit 2
2. REPORTING PERIOD OCTOBER 1995
3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 911
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840
8. CHANJE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Year- Cumulative
  • This month to-Date to Date
11. HOURS IN REPORTING PERIOD 745 7,296 162,912
12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 5,741.8 119,778.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
14. HOURS GENERATOR ON LINE 745.0 5,658.7 118,109.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,995,880 14,887,038 302,383,967
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 653,313 4,866,296 99,881,605
18. NET ELECTRICAL ENERGY GENERATED (MWH) 627,239 4,650,795 95,472,405
19. UNIT SERVICE FACTOR 100.0 77.6 72.5
20. UNIT AVAILABILITY FACTOR 100.0 77.6 72.5
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.2 75.9 70.9
22. UNIT CAPACITY FACTOR (USING DER NET) 99.6 75.4 69.4
23. UNIT FORCED OUTAGE RATE 0.0 3.2 5.7
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

N/A

  • Time change
25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A

AVERAGE DAILY UNIT POWER LEVEL oc**********************************************************************

Docket No. 50-318 Calvert Cliffs Unit No. 2 November 15, 1995 Prepared by Herman O. Olsen Telephone: (410) 260-6734 OCTOBER 1995 Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 844 17 848 2 845 18 850 3 843 19 848 4 843 20 849 5 844 21 849 6 845 22 849 7 844 23 849 1

8 844 24 857 9 840 25 853 10 844 26 848 11 845 27 851 12 845 28 851 13 839 29 888 14 744 30 853 l 15 781 16 845

O e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-318 UNIT NAME Cahat Chffs-U2 * -

DATE November 15.1995 COMPLETED BY Hennan O. Olsen TELEPHONE (410) 260-6734 REPORTMONTH October 1995 .

METIIOD OF SIIUITING LICENSEE CAUSE & CORRECTIVE DURA 110N DOWN EVENT SYSTEM COMPONENT AC110N TO NO. DATE TYPEI (llOURS) REASON 2 REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE There were no rigmficant power reductions for this month.

1 F: Forced 2 Rm 3 Method 4 IEEE Standard 805-1984 S: Scheduled A- Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C - Refueling 3 - Automatic Scram 5 IEEE Standard 803A-1983 D - Regulatory Restnction 4 - O*=W E - Operator Traimng & License Examination 5 -Reduced Load F - Admmistrative 9 - Other G - Operational Error H - Other

REFUELING INFORMATION REOUEST

1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 -
2. Scheduled date for next refueling shutdown: March 14,1997 *
3. Scheduled date for restart following refueling: April 23,1997 * *
4. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

No.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

None. .

6. Important licensing considerations associated with the refueling. t None.
7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1434 (Note 2)

Spent fuel pools are common to Units 1 and 2.

8. (a) T,he present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710 (Note 1) (b) 0

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 2007 NOTE 1: 4710 total licensed site storage capacity.

(1830 pool + 2880 ISFSI)

NOTE 2: 240 Spent Fuel Assemblies in the ISFSI.

  • Entry has changed since last reported

l a I

)

l DOCKET NO. 50-318 CALVERT CLIFFS -UNIT 2 ,

November 15,1995 l

SUMMARY

OF OPERATING EXPERIENCE October 1995 The unit began the month at 100% power (840 MWe).

A scheduled power reduchon was performed at 2215 on 10/13/95. Power was reduced to 85% for l waterbox cleaning and Main Turbine Valve testing. Power was retumed ta 100% at 1815 on 10/15/95.

On 10/16/95 at 0333 power was reduced to 87% when a turbine bypass valve failed open. 'Ihe valve was isolated and power was restored to 100% at 0600.

The unit ended the month at 100% power (840 MWe).

l 1

l l

l l

)

1