ML20052F022
Jump to navigation
Jump to search
| ML20052F022 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 05/05/1982 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20052E950 | List: |
| References | |
| NUDOCS 8205110641 | |
| Download: ML20052F022 (2) | |
Text
-
OPER ATING D AT A l' EPORT DOCKET NO.10-317 DATE 5/5/82 COMPLETED BY Elaine L6ti to TELEPl10NE (301) 787-5363 OPE RATING STATUS Calvert Cliffs #1 Notes
- 1. Unit Name:
Revision March 1982
- 2. Reporting Period:
- 3. Licensed Thermal Power IMW:):
- 4. Nameplate Rating (Gro>s MWel:
- 5. Design Electrical Raimg(Net MWe):
- 6. Maximum Dependab'e Capacity (Gross Mhen
- 7. Manimum Dependable Capacity (Net Mbe):
- 8. If Changes Oecur in (ap eity Rating > titems Nurder 3 ThrouFh 7) Since Last Report.Gi e Reasons;
- 9. Power Lese! To which Hestricted.lf Any INet Athet:
- 10. Reasons For Resenctions. lf Any:
This Month Yr..to Date Cumubtive
- 11. Hours in Reporting Period P
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line
- 15. Unit Resene Shutdown linurs
- 16. Grass Thermal Energy Generated (MWH) 115,633,_153
- 17. Gross Electrical Energy Generated (\\lWil)
- 18. Net Electrical Energy Generated (MWH)
- 19. Urtit Senice Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Fac or IUsing \\lDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Ourage Rate
- 24. Shutdowns Scheduled Over Nest 6 Months (T3pe. Date,and Duration of Eacht-
- 25. If Shut Down At End Of Report Period, f.stimated Date of Startup:
- 26. Unit:In Test Statua lPrio. to Commercial Oper. tioni Forecast Achkied lisITIA L CRITIC A LITY INITIA L ELECTitl CITY COMstERCI4L OPI R n TION 8205110641 820505 PDR ADOCK 05000317 ggf77)
R PDR N
o OPERATI.iG D*T A lifPORT DOCKET NO.50-318 DATE 575/82 COMPl.ETED BY Elaine Lotito TELEPl!ONE (301) 781,5363 OPERATING STATUS a
s #2 Mn R M sion
- 1. Unit Name-
- 2. Reportmg Period.
March 1982
- 3. Licensed ThermalIwer t?.ths).
- 4. Nameplate Rating (Grou Mhe): -
- 5. Design Electrical Raim; tNet Mhei-
- 6. Maximum Dependad!c Capacity IGross Mhel.
- 7. Maximum Dependable Capacity (Net Mbe).
- 8. If Changes Occur in Capacity Ratings litems Nont er 31hrough 7) Since Last Report.Gi'e Reasons.
- 9. Power Lesel To hhich Hestricted,if Any INet tfh.:1:
- 10. Reasons for Restrictients.lf Any:
This M.inth Yr.to.Date Cumulative
- 11. Ilours in Reporting Period
- 12. Number Of flours Reactor %s Crivital
- 13. Reactor Resene Shutdown Hours
- 14. ilours Generater On Lme
- 15. Unit Resene Shutdown linvrs
- 16. Gross Thermal Energy Generated (MWill
_90.891 468
- 17. Gross Electrical Energy Generated IMWill 1S. Ne: Electrical Energy Generated (MwHi
- 19. Unit Senice Factor
- 20. Unit Avsitability factor
- 21. Unit Capacity Factor IUsing MDC Nets
- 22. Ur::: Capacity factor (Using DER Net) l
- 23. Ur:lt Forced Outage Rate
- 24. Shutdowns Schedu!cd (ner Nest 6 Months II3pe. Date.snd Duration of Eacht-
- 25. IlShut Down At End Of Report Pem.J. Estimated Date of Startup:
- 26. Unit: In Test Status (P >:.,r io Commercial Operstioni Focecast Achiesed INITIA L CRITICA LITY.
INITi A L ELECTRICITY COM%IERCI \\ L OPIR ATION O/77)
.