ML20052F018
Jump to navigation
Jump to search
| ML20052F018 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 05/05/1982 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20052E950 | List: |
| References | |
| NUDOCS 8205110637 | |
| Download: ML20052F018 (2) | |
Text
,
a s
OPERATING DAT A REPORT DOCKET NO. J0-317 DATE'5/5/82 COMPLETED BY Elaine Lotito TELEPHONE (301) 787-.5363 OPERATING RTATUS
- 1. Unit N4:ne:
Calvert Cliffs #1 Not*5
- 2. Reporting Period-February 1982 Revision
- 3. Li:ensed Thermal Power tMW J:
- 4. Nameplate Rating (Gross MWeb:
- 5. Design Electrical RaimgINet Mbe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Manimun Dependabic Capacity (Net MWe):
- 8. If Changer Oecur in Cap.uity Ratings iltems Number 3 Through 7) Since Last Report.Gise Reasons.
- 9. Power Lese! To bhich Hestricted.If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr..to-Dat e Cumn! alive
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Resene Shutdown Hours
- 14. Hours Generator On.Line
- 15. Unit Resene Shutdown !!ciurs
- 16. Gross Thermal Energy Generated (MWH) 113,663,773
- 17. Gross Electrical Energy Generated IMWilI
- 18. Net Electrical Energy Generated IMWHI
- 19. Unit Senice Facter
- 20. Ucit Avsilability Factor
- 21. Unit Capacity Factor (Using MDC Neti
- 22. Unit Capacity Factor tusing DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oier Nest 6 Months (13pe. Date and Duration of Eacht.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Unis:In Teil Status (Prior o Commercial Operations:
Forecast Achieved INITIA L CRiiKALITY INITIA L ELECTRICITY COM\\tEP.CI AL OPE R.nTION 8205110637 820505 PDR ADOCK 05000317 g177) p PDR
.y OPER A TI:sG D A T A l'FPOR T DOCKET NO.
5,0-318 DATE 5/5/82 COMPLETED DY Elaine Lotito TELEPHONE (301) 787.5363 OPERATING STAT US
- 1. Unit Name:
Calvert Cliffs #2..
Notes
- 2. Reportmg Period: February 1982-Revision
- 3. Licensed Therms! I uw er iMWtJ;
- 4. Nameptate Rating (Gro>s MWe):
- 5. Design Electrical Rating (Net Mhen-
- 6. Masimum Dependaa!c Capacity IGross Mbe).
)
- 7. Maximurn Dependable Capacity (Net Mhe);
- 8. If Changes Oecur ir. Cap.eaty Ratings litems Nunter.1 Thrm ph 7) Since Last Rc;ost.Gi'e Reasons.
- 9. Power Lese! To bhich liestricted. If An3 (Net Mhen:
- 10. Reasons for Restnctions,if Any:
This hRrth
%.to.Date Cumulatise II. flours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 1.1. Reacter Reserie Shutdown Hours
- 14. Hours Generstoe On Ltr.e
^
- 15. Urdt Resene Shutdown Hours
- 16. Gross Thermal Energy Generated IMWif)
_._88,916,708
~
- 17. Gruss Electrical Energy Gencrsted IMWiiI
- 15. Net Electrical Energy Generated IMWH
- 19. Unit Senice Factor
- 20. Unit Avsitability Factor
- 21. Urdt Capacity Factor (Using MDC Neti
- 12. Ur.it Capacity Factor sUning DER Net!
- 23. Ur:it ForceJ Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months IType. Date. nd Duration of Eacht-
- 25. If Shut Down At End Of Report PerioJ.Estirrsed Date cf Startup:
- 26. Unit in Test StatusiPrior Io Commercial Oper t;on)
Forecast AcIncicJ thlTit t CRITK A LITY INITIAL ELECTHICITY COM\\lERCI AL OPER ATlON D/77)