ML20052F018

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for Feb 1982
ML20052F018
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/05/1982
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20052E950 List:
References
NUDOCS 8205110637
Download: ML20052F018 (2)


Text

,

a s

OPERATING DAT A REPORT DOCKET NO. J0-317 DATE'5/5/82 COMPLETED BY Elaine Lotito TELEPHONE (301) 787-.5363 OPERATING RTATUS

1. Unit N4:ne:

Calvert Cliffs #1 Not*5

2. Reporting Period-February 1982 Revision
3. Li:ensed Thermal Power tMW J:
4. Nameplate Rating (Gross MWeb:
5. Design Electrical RaimgINet Mbe):
6. Maximum Dependable Capacity (Gross MWe):
7. Manimun Dependabic Capacity (Net MWe):
8. If Changer Oecur in Cap.uity Ratings iltems Number 3 Through 7) Since Last Report.Gise Reasons.
9. Power Lese! To bhich Hestricted.If Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr..to-Dat e Cumn! alive

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Resene Shutdown Hours
14. Hours Generator On.Line
15. Unit Resene Shutdown !!ciurs
16. Gross Thermal Energy Generated (MWH) 113,663,773
17. Gross Electrical Energy Generated IMWilI
18. Net Electrical Energy Generated IMWHI
19. Unit Senice Facter
20. Ucit Avsilability Factor
21. Unit Capacity Factor (Using MDC Neti
22. Unit Capacity Factor tusing DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oier Nest 6 Months (13pe. Date and Duration of Eacht.
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Unis:In Teil Status (Prior o Commercial Operations:

Forecast Achieved INITIA L CRiiKALITY INITIA L ELECTRICITY COM\\tEP.CI AL OPE R.nTION 8205110637 820505 PDR ADOCK 05000317 g177) p PDR

.y OPER A TI:sG D A T A l'FPOR T DOCKET NO.

5,0-318 DATE 5/5/82 COMPLETED DY Elaine Lotito TELEPHONE (301) 787.5363 OPERATING STAT US

1. Unit Name:

Calvert Cliffs #2..

Notes

2. Reportmg Period: February 1982-Revision
3. Licensed Therms! I uw er iMWtJ;
4. Nameptate Rating (Gro>s MWe):
5. Design Electrical Rating (Net Mhen-
6. Masimum Dependaa!c Capacity IGross Mbe).

)

7. Maximurn Dependable Capacity (Net Mhe);
8. If Changes Oecur ir. Cap.eaty Ratings litems Nunter.1 Thrm ph 7) Since Last Rc;ost.Gi'e Reasons.
9. Power Lese! To bhich liestricted. If An3 (Net Mhen:
10. Reasons for Restnctions,if Any:

This hRrth

%.to.Date Cumulatise II. flours in Reporting Period

12. Number Of Hours Reactor Was Critical 1.1. Reacter Reserie Shutdown Hours
14. Hours Generstoe On Ltr.e

^

15. Urdt Resene Shutdown Hours
16. Gross Thermal Energy Generated IMWif)

_._88,916,708

~

17. Gruss Electrical Energy Gencrsted IMWiiI
15. Net Electrical Energy Generated IMWH
19. Unit Senice Factor
20. Unit Avsitability Factor
21. Urdt Capacity Factor (Using MDC Neti
12. Ur.it Capacity Factor sUning DER Net!
23. Ur:it ForceJ Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months IType. Date. nd Duration of Eacht-
25. If Shut Down At End Of Report PerioJ.Estirrsed Date cf Startup:
26. Unit in Test StatusiPrior Io Commercial Oper t;on)

Forecast AcIncicJ thlTit t CRITK A LITY INITIAL ELECTHICITY COM\\lERCI AL OPER ATlON D/77)