PETER E. Kurz Baltimore Gas and Electric Company Plant General Manager Calven Cliffs Nuclear Power Plant Calv:n Cliffs Nuclear Power Plant 1650 Calven Cliffs Parkway Lusby, Maryland 20657 410 495-4101 December 13,1996 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 November 1996 Operating Data Reports The subject reports are being sent to you as required by Technical Specification 6.6.4.
Should you have any questions, please contact Mr. Kenneth Greene at (410) 495-4385.
Very truly yours, J
=L d
PEK/IlOO/bjd r
Attachments lc
(
cc:
D. A. Brune, Esquire R. A. Hartfield, NRC
'[
J. E. Silberg, Esquire R. I. McLean, DNR Director, Project Directorate I-1, NRC J. H. Walter, PSC
/
A. W. Dromerick, NRC P. Lewis, INPO
/
H. J. Miller, NRC K. N. Larson, ANI Resident Inspector, NRC 9612190198 961,130 I
PDR ADOCK 05000317 l
R ppg 190045
00**************************************************************************
UNIT 1 OPERATING DATA REPORT C0**************************************************************************
Docket No. 50-317 December 14, 1996 Prepared by Herman O. Olsen Telephone : (410) 495-6734
. OPERATING STATUS
,1.
UNIT NAME Calvert Cliffs Unit 1
- 2. REPORTING PERIOD NOVEMBER 1996 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS' N/A Year-Cumulative This month to-Date to Date
- 11. HOURS IN REPORTING PERIOD 720
.8,040 189,061
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5,125.4 136,551.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR.ON LINE 720.0 5,019.2 133,742.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,941,163 13,221,055 340,723,059
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 648,734 4,381,204 113,092,904
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 623,507 4,177,302 107,701,795
- 19. UNIT SERVICE FACTOR 100.0 62.4 70.7
- 20. UNIT AVAILABILITY FACTOR 100.0 62.4 70.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.7 62.2 68.9
- 22. UNIT CAPACITY FACTOR (USING DER NET) 102.5 61.5 67.4
- 23. UNIT FORCED OUTAGE RATE O.0 14.1 8.5
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION) :
N/A
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A
)
~
D' WUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-317 UNIT NAME Calvert Cliff Ul ~
t DATE December 13.1996' COMPLETED BY Herman O. Olsen TELEPHONE (410) 495-6734 -
REPORT MONTH November 1996 METIlOD OF SIlUT11NG LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYS1 Tai COMPONENT ACTION TO 4
CODES PREVENT RECURRENCE NO.
DATE TYPEI (1IOURS)
REASON 2 REACTOR 3 REPORT #
CODE There utre no significant power reductions for this month.
I F: Forced 2 Reason:
3 Method:
4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F - Administrative 9 - Other G - Operational Error H - Other
REFUELING INFORMATION REOUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2.
Scheduled date for next refueling shutdown: March 1998 3.
Scheduled date for restart following refueling: May 1998 4.
Will refuelmg or resumption of operation thereafter require a Technical Specification change or other license amendment?
f N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
N/A t
6.
Lnportant licensing considerations associated with the refueling.
N/A 7.
The number of fuel assemblies (a) in the core and (b) in du synt fuel storage pool.
(a) 217 (b) 1402 (Note 2)
- Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
J (a) 4710 (Note 1)
(b) 0 j
i 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
i March 2007 NOTE 1:
4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2:
360 Spent Fuel Assemblies in the ISFSI.
- Entry has changed since last reported.
AVERAGE DAILY UNIT POWER LEVEL
. coo *********************************************************************
Docket No. 50-317 Calvert Cliffs Unit No. 1 December 14, 1996 Prepared by Herman O. Olsen Telephone: (410) 495-6734 NOVEMBER 1996 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 862 17 866-2 864~
18 861 l
3 865 19 862 4
864 20 866 5
866 21 867 6
866 22 867 7'
B65 23 867 8
865 24 868 9
864 25 867 10 866 26 868 11 867 27 866 12 867 28 869 13 867 29 868 14 867 30 867 i
15 868 16 867 O
DOCKET NO. 50-317 CALVERT CLIFFS - UNIT 1 December 13,1996
SUMMARY
OF OPERATING EXPERIENCE November 1996 The unit operated : 100% power for the entire month.
coo *************************************************************************
UNIT 2 OPERATING DATA REPORT 00C*************************************************************************
Docket No. 50-318 December 14, 1996 Prepared by Herman O. Olsen Telephone : (410) 4 95-6734 OPERATING STATUS
~~~~~~~~~~~~~~~~
1.
UNIT NAME Calvert Cliffs Unit 2 2.
REPORTING PERIOD NOVEMBER 1996 3.
LICENSED THERMAL POWER (MWT) 2700 4.
NAMEPLATE RATING (GROSS MWe) 911 5.
DESIGN ELECTRICAL RATING (NET MWe) 845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Year-Cumulative This month to-Date to Date
- 11. HOURS IN REPORTING PERIOD 720 8,040 172,416
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 662.3 7,855.6 129,098.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 652.4 7,817.6 127,391.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,719,196 20,785,461 327,115,672
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 573,822 6,883,116 108,072,644
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 549,776 6,608,322 103,337,766
- 19. UNIT SERVICE FACTOR 90.6 97.2 73.9
- 20. UNIT AVAILABILITY FACTOR 90.6 97.2 73.9
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 90.9 97.8 72.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 90.4 97.3 70.9
- 23. UNIT FORCED OUTAGE RATE 9.4 3.1 5.4
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
Refueling 03/14/96 46 days
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A 1
t
.. ~...
. = _ -
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-318 UNIT NAME Calvert Cliffs-U2 ^
DATE December 13.19%
COMPLETED BY Herman O. Olsen TELEPHONE (410) 495-6734 REPORT MONTH November 1996 METilOD OF l
S1RTITING LICENSEE CAUSE & CORRECTIVE DURABON DOWN EVENT SYSTEM COMPONENT ACTION TO (1IOURS)
REASON 2 REACTOR 3 REPORT #
CODE 4 CODES PREVENT RECURRENCE NO.
DATE TYPEI 96003 111796 F
67.6 A
3 96005 JB FCV The unit automatically tripped on 11/17/96 at 1059 duc to a low steam generator level. Indications were that a feedwater regulating vahr had closed while operating at 100% power. Subsequent imrstigation identified that the feedback spring retaining bolt on #21 Main Fced Regulating Vahr positioner had broken, causing the valve to close. The valve was repaired and the unit was returned to operation on 11/20/96 at 0640. The root cause of the trip (broken bolt) is still under imestigation.
i 1 F: Forced 2 Reason:
3 Method:
4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Semm.
S lEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F - Administrative 9 - Other G - Operational Error 11 - Other
s.
v
(
REFUELING INFORMATION REOUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 2.
Scheduled date for next refueling shutdown: March 14,1997 3.
Scheduled date for restart following refueling: April 28,1997 4.
Will refueling or resumptiou of operation thereafter require a Technical Specification change or other license amendment?
Yes.
I a.
License Amendment to adopt the requirements of Appendix J, Option B for Type B q
and C testing.
b.
License Amendment to allow the substitution of a blind flange for the outside purge valve pressure boundary in Modes 1-4.
c.
License Amendment to allow the use of a temporary closure in place of the equipment i
hatch in Modes 5 and 6.
d.
License Amendment to lower the reactor coolant flow which supports an increased number of steam generator tubes plugged.
4 e.
License Amendment to clarify wording on shutdown cooling maintenance Technical Specification to allow openings in containment during the maintenance.
f.
License Amendment to allow electrosleeving as a repair method for steam generator i
tubes.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
a.
November 26,19% a b.
August 1,1996 c.
December 19%
d.
January 1997 c.
December 1996 f.
July 26,1996 6.
Important licensing considerations associated with the refueling.
None.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1402 (Note 2)
- Spent fuel pools are common to Units 1 and 2.
j 8.
(a) 'Ihe present licensed spent fuel pool storage capacity, and (b) the size of any increase in j
licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
4 (a) 4710 (Note 1)
(b)0 i
9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
i March 2007 NOTE 1:
4710 totallicensed site storage capacity.
(1830 pool + 2880 ISFSI) j 1
NOTE 2:
360 Spent Fuel Assemblies in the ISFSI.
- Entry has changed since last reported.
a
. _. - _ ~.... _. _ _ _. _. _ _
+.
i b
.1 AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2-j December 14, 1996 Prepared by Herman-0. Olsen'
)
lL Telephone: (410) 495-6734 i
NOVEMBER 1996 1
+
i Average Daily Power Level Average Daily' Power Level I
Day (MWe-Net)
Day (MWe-Net)
I, 1-858 17 376 i
2 858 18
-29 l
3 861 19
-29 4
861 20 333 5
861 21 838 6
861 22 852 7
861 23-855-8 860
-24 857 9
829 25 860 10 850 26 861 11 851 27 861 12 853 28 861 1
I 13 854 29 861 14 856 30 861 15 858 16 857 n
l i
DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2
)
December 13,1996 i
SUMMARY
OF OPERATING EXPERIENCE November 1996 The unit began the month at 100% power.
On 11/09/96 at 0357, power was reduced to approximately 95% due to a loss of a circulating water pump.
Power was returned to 100% at 1640.
j On 11/17/96 at 1059 an automatic reactor trip occurred due to a low steam generator water level. Based j
on the indications received, the operators believed that a feedwater regulating valve had closed while operating at 100% power. Subsequent investigation identified that the feedback spring retaining bolt on the positioner for #21 Main Feedwater Regulating Valve had broken. This caused the valve to close and thus caused the trip. Repairs were made to the valve and the unit was returned to operation on 11/20/96 at 0634. The unit reached 100% on 11/21/96 at 0600.
The unit remained at 100% power for the remainder of the month.
1