.j OPERATING DAT A REPORT DOCKET NO.51-317 DATE 5/5/82 COMPLETED BY Elaine Lotito TELEFilONE (301) 783.-5363 OPERATING STATUS
- 1. Unit Name:
Calvert Cliffs #1 Notes Revision
- 2. Reportmg Period-September 1981~
- 3. Licensed Thermal Power IMW:):
- 4. Nameplate Rating (Gross MWeI:
- 5. Desig:t Electrical Rating (Net MWe):
- 6. Maximum Dependab!c Capacity IGross MWel:
- 7. Maximum Dependabic Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings iltems Norder 3 Through 7) Since Last Report.Gi e Reasons.
- 9. Power Lesel To hhich Hestricted. lf Any (Net Mhel: --
- 10. Reasons For Restnctions,if Any:
Thb Month Yr..to-Da t e Cumulative 9
!!. Ifcurs in Reporting Period
- 12. Number Os Hours Reactor Was Critical
- 13. Reacter Resene Shutdown llours
- 14. Hours Generator On.Line
- 15. Unit Resene Shutdown flours
- 16. Glosa Thermal Energy Generated (MWH) 14,206,602 104,773,394
- 17. Gross Electrical Energy Generated (MWill
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Senice Factor
- 20. Unit Ava2tability Facter
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Copacity Factor (Using DER Net!
- 23. Unit Forced Outage Rate
- 24. Shutdowns Schedi:!cd Over Nest 6 Months (Type. Date,and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Oper. t;oni:
Forecut Achiesed INITIA L CRITIC A LITY INITIAL ELECTRICITY COMMERCI AL OPER ATION 8205110601 820505 PDR ADOCK 05000317 (9/77)
R PDR
OPERATI.NG DAT A REPORT DOCKET NO.10-318 DATE 5]5/82 COMPl.ETED BY Elaine Lotit o
~
TELEPl!ONE (301) 787-5363 OPERATING STA1US
- 1. Unit Name: Calvert Cliffs #2 N
Revision Septernber 161
- 2. Reportmg Period:
- 3. Licenad ThermalIwwer t.'.twti;
- 4. Nameplate R:tmg (Gross MWel:
$. Desiga Electrical Rating (Net MWei-
- 6. Masimum DependaMe Capacity 4 Gross MWei.
- 7. Maximum Dependab!c Capacity (Net Mhe).
- 8. If Changes Occur in Capseity Ratings tirems Nur,ter 3 Thrm.ph 7) Since Last Report.Gise Reasons.
- 9. Pouct Lesel To hhich Hestricted.lf Any (Net Mbel:
- 10. Reasons For Restnctions. lf Any:
This hianth Y..to-Date Cumulative
- 11. licurs in Reporting Period
- 12. Number Ol'Ilours Reactor Was Crincal
- 13. Resetor Reserve Shutdown llours
- 14. Houn Generster On.Lme
- 15. Unit Rewne Shutdown flown
- 16. Cross Thermal Energy Generated (MWH) 11,563,448 80,315,079
- 17. Gross Electrical Energy Generated (MWil)
- 18. Net Electrical Energy Generated (MWHi
- 19. Unit Senice Factor
- 20. Unit Avsilability Factor
- 21. Unit Capseity Factor IUsing \\lDC Neti
- 22. Unit Capacity factorIUsing DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oscr Nest 6 hionths tType. Date.snd Durstron of Eacht:
- 25. f( Shut Down At End Of Report PerioJ. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operstioni.
Focecast Achieved INITI A L CRITICA LITY.
INITIAL ELECTRICITY COMilERCl;L OPER LTION (9/77)
.