.j OPERATING DAT A REPORT DOCKET NO.51-317 DATE 5/5/82 COMPLETED BY Elaine Lotito TELEFilONE (301) 783.-5363 OPERATING STATUS

1. Unit Name:

Calvert Cliffs #1 Notes Revision

2. Reportmg Period-September 1981~
3. Licensed Thermal Power IMW:):
4. Nameplate Rating (Gross MWeI:
5. Desig:t Electrical Rating (Net MWe):
6. Maximum Dependab!c Capacity IGross MWel:
7. Maximum Dependabic Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings iltems Norder 3 Through 7) Since Last Report.Gi e Reasons.
9. Power Lesel To hhich Hestricted. lf Any (Net Mhel: --
10. Reasons For Restnctions,if Any:

Thb Month Yr..to-Da t e Cumulative 9

!!. Ifcurs in Reporting Period

12. Number Os Hours Reactor Was Critical
13. Reacter Resene Shutdown llours
14. Hours Generator On.Line
15. Unit Resene Shutdown flours
16. Glosa Thermal Energy Generated (MWH) 14,206,602 104,773,394
17. Gross Electrical Energy Generated (MWill
18. Net Electrical Energy Generated (MWH)
19. Unit Senice Factor
20. Unit Ava2tability Facter
21. Unit Capacity Factor (Using MDC Net)
22. Unit Copacity Factor (Using DER Net!
23. Unit Forced Outage Rate
24. Shutdowns Schedi:!cd Over Nest 6 Months (Type. Date,and Duration of Eacht:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status IPrior to Commercial Oper. t;oni:

Forecut Achiesed INITIA L CRITIC A LITY INITIAL ELECTRICITY COMMERCI AL OPER ATION 8205110601 820505 PDR ADOCK 05000317 (9/77)

R PDR

OPERATI.NG DAT A REPORT DOCKET NO.10-318 DATE 5]5/82 COMPl.ETED BY Elaine Lotit o

~

TELEPl!ONE (301) 787-5363 OPERATING STA1US

1. Unit Name: Calvert Cliffs #2 N

Revision Septernber 161

2. Reportmg Period:
3. Licenad ThermalIwwer t.'.twti;
4. Nameplate R:tmg (Gross MWel:

$. Desiga Electrical Rating (Net MWei-

6. Masimum DependaMe Capacity 4 Gross MWei.
7. Maximum Dependab!c Capacity (Net Mhe).
8. If Changes Occur in Capseity Ratings tirems Nur,ter 3 Thrm.ph 7) Since Last Report.Gise Reasons.
9. Pouct Lesel To hhich Hestricted.lf Any (Net Mbel:
10. Reasons For Restnctions. lf Any:

This hianth Y..to-Date Cumulative

11. licurs in Reporting Period
12. Number Ol'Ilours Reactor Was Crincal
13. Resetor Reserve Shutdown llours
14. Houn Generster On.Lme
15. Unit Rewne Shutdown flown
16. Cross Thermal Energy Generated (MWH) 11,563,448 80,315,079
17. Gross Electrical Energy Generated (MWil)
18. Net Electrical Energy Generated (MWHi
19. Unit Senice Factor
20. Unit Avsilability Factor
21. Unit Capseity Factor IUsing \\lDC Neti
22. Unit Capacity factorIUsing DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oscr Nest 6 hionths tType. Date.snd Durstron of Eacht:
25. f( Shut Down At End Of Report PerioJ. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operstioni.

Focecast Achieved INITI A L CRITICA LITY.

INITIAL ELECTRICITY COMilERCl;L OPER LTION (9/77)

.