ML20052E999
| ML20052E999 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 05/05/1982 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20052E950 | List: |
| References | |
| NUDOCS 8205110614 | |
| Download: ML20052E999 (2) | |
Text
-
' b OPERATING ()AT A REPORT DOCKET NO. 50-317 DATE 575/82 COMPLETED B*c En'eLotito TELEPHONE TT6T> 783.-5363 OPE RATING STAT US I. Unit Name:
Calvert Cliffs #1 _._
N"k' Revision October 1981
- 2. Reportmg Period.
- 3. Licensed Thermal Power (Mb.):
- 4. Nameplate Rating (Gross MWel:
- 5. Design Electrical Raimit(Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net Mheb
- 8. If Changes Occur in capacity Ratings (Items Nurnter 3 Through 7) Since Last Report.Gi e Reasons:
- 9. Poact Leiel To hhich Hestricted. lf Any (Net 4 thel:
- 10. Reasons For Restrictiorts. If Any:
This Month Yr..to Date Cumulative t
II. Hours In Reportir:3 eriod P
- 12. Number Ofliones Reactor Was Critical
- 13. Reactor Reserve 55urdown Hours
- 14. Hours Generatoe On Line
- 15. Unit Resene Shutdown linvrs
- 16. Gross Thermal Energy Generated (MWH)
__15.669.389 106.236.181 I7. Gross Electrical Energy Generated (MWHI
- 18. Net Electrical Energy Generated (MWill
- 19. Unit Service Factor
- 20. Ur.at Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity factor (Usmg DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Eacht.
- 23. If Shut Down At End Of Reptert Period. Estimated Date of Startup:
- 24. Unit:In Test Status irrior ta Commercial Operstion):
Forrcut Achiesed INITIA L CRITICA LITY INITIA L ELECTitlCIT Y COMstERCl%L OPERTTION 8205110614 020505 DR ADOCK 05000317 (9/77)
OPER A TI.NG DAT A P EPORI DOCKET NO. 50-318 DATE 75/82 5
C05tPLETED BY Elaine Lottto TELEPHONE (301) 787-5363 OPERATING STATUS
- 1. Unit Name.
Calvert Cliffs #2 Nt~ Revision
- 2. Reporting Period.
October 1981
- 3. Licensed ThermalIwcr d.lW:t
- 4. Nameplate Rating tGross Stwel:
- 5. Desiga Electrical Ratin;(Net MWe):
- 6. Masimum Dependad!c Capacity (Gross MWel.
- 7. Maximurn Dependab!c Capacity (Net MWe);
- 8. If Changes Occur in Capseity Ratings tirems Nunter 31hra;.ph 7) Siate Last Repart.Gi'e Beasons.
- 9. Power Lesel To hhich Hestricted,if An3 (Net stN): _
- 10. Reasons For Restnctions. lf Any:
This hi.> nth Y..to Date Cumuistive
- 11. Hours In Reporting Period P
- 12. Number Of Hours Reactor Was Critics 1
- 13. Resetor Resene Shutdown Hours
- 14. Hours Generstoe On.Line
- 15. Unit Resene Shutdown linurs
- 16. Gross Thermal Energy Generated (MWH)
~
- 17. Gross Electrical Energy Genersted 1%IWIf)
__13,531,590 82,283,221 IS. Net Electrical Energy Generated (Mwill
- 19. Urtit Service factor
- 20. Unit Avsilability Factor
- 21. Unit Capacity Facter IUsing \\lDC Neti
- 22. Urdt Capacity Factor iUsing DER Net)
- 23. Urit Forced Outage Rate
- 24. Shutdowns Schedu!cd Oscr Nest 6 Months iType. Date.snd Duration of Eacht:
- 25. H Shut Down At End Of Report PerioJ. Estimated Date of Startup:
- 26. Unis In Test Status IPrior to Commercial Oper tion 1-Focecast Achiesed INITIA L CRITIC A LITY.
INITIAL ELECTRICITY COMs!ERCl 4L OPERTTION P/77)
.