ML20052E999

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for Oct 1981
ML20052E999
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/05/1982
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20052E950 List:
References
NUDOCS 8205110614
Download: ML20052E999 (2)


Text

-

' b OPERATING ()AT A REPORT DOCKET NO. 50-317 DATE 575/82 COMPLETED B*c En'eLotito TELEPHONE TT6T> 783.-5363 OPE RATING STAT US I. Unit Name:

Calvert Cliffs #1 _._

N"k' Revision October 1981

2. Reportmg Period.
3. Licensed Thermal Power (Mb.):
4. Nameplate Rating (Gross MWel:
5. Design Electrical Raimit(Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net Mheb
8. If Changes Occur in capacity Ratings (Items Nurnter 3 Through 7) Since Last Report.Gi e Reasons:
9. Poact Leiel To hhich Hestricted. lf Any (Net 4 thel:
10. Reasons For Restrictiorts. If Any:

This Month Yr..to Date Cumulative t

II. Hours In Reportir:3 eriod P

12. Number Ofliones Reactor Was Critical
13. Reactor Reserve 55urdown Hours
14. Hours Generatoe On Line
15. Unit Resene Shutdown linvrs
16. Gross Thermal Energy Generated (MWH)

__15.669.389 106.236.181 I7. Gross Electrical Energy Generated (MWHI

18. Net Electrical Energy Generated (MWill
19. Unit Service Factor
20. Ur.at Availability Factor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity factor (Usmg DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Eacht.
23. If Shut Down At End Of Reptert Period. Estimated Date of Startup:
24. Unit:In Test Status irrior ta Commercial Operstion):

Forrcut Achiesed INITIA L CRITICA LITY INITIA L ELECTitlCIT Y COMstERCl%L OPERTTION 8205110614 020505 DR ADOCK 05000317 (9/77)

PDR

OPER A TI.NG DAT A P EPORI DOCKET NO. 50-318 DATE 75/82 5

C05tPLETED BY Elaine Lottto TELEPHONE (301) 787-5363 OPERATING STATUS

1. Unit Name.

Calvert Cliffs #2 Nt~ Revision

2. Reporting Period.

October 1981

3. Licensed ThermalIwcr d.lW:t
4. Nameplate Rating tGross Stwel:
5. Desiga Electrical Ratin;(Net MWe):
6. Masimum Dependad!c Capacity (Gross MWel.
7. Maximurn Dependab!c Capacity (Net MWe);
8. If Changes Occur in Capseity Ratings tirems Nunter 31hra;.ph 7) Siate Last Repart.Gi'e Beasons.
9. Power Lesel To hhich Hestricted,if An3 (Net stN): _
10. Reasons For Restnctions. lf Any:

This hi.> nth Y..to Date Cumuistive

11. Hours In Reporting Period P
12. Number Of Hours Reactor Was Critics 1
13. Resetor Resene Shutdown Hours
14. Hours Generstoe On.Line
15. Unit Resene Shutdown linurs
16. Gross Thermal Energy Generated (MWH)

~

17. Gross Electrical Energy Genersted 1%IWIf)

__13,531,590 82,283,221 IS. Net Electrical Energy Generated (Mwill

19. Urtit Service factor
20. Unit Avsilability Factor
21. Unit Capacity Facter IUsing \\lDC Neti
22. Urdt Capacity Factor iUsing DER Net)
23. Urit Forced Outage Rate
24. Shutdowns Schedu!cd Oscr Nest 6 Months iType. Date.snd Duration of Eacht:
25. H Shut Down At End Of Report PerioJ. Estimated Date of Startup:
26. Unis In Test Status IPrior to Commercial Oper tion 1-Focecast Achiesed INITIA L CRITIC A LITY.

INITIAL ELECTRICITY COMs!ERCl 4L OPERTTION P/77)

.