ML20052E966
| ML20052E966 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 05/05/1982 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20052E950 | List: |
| References | |
| NUDOCS 8205110577 | |
| Download: ML20052E966 (2) | |
Text
-
e OPERATING DAT A REPORT DOCKET NO. SG 117 DATE.142f82 COMPLETED BYliaine I/orito TELEPHONF. (1n11 7R7 5163 OPERATING STATUS Calvert Cliffs #1 Notes ' Revision I. Unit Name:
- 2. Reporting Period-
- 3. Licensed Thc mal Power (MWI):
- 4. Nameplate Rating (Gro>s MWer
- 5. Dnign Electrical RatmgINet MWe):
- 6. Matimum Dependab!c Capacity IGross MWel:
- 7. Mami. m Dependable Capacity (Net MWe):
- 8. If Chr es Decur in Capacity Ratings (Irems Nur 1 er 3 Through 7) Ece Last Report.Gi*e Reasom.
s
- 9. Power Lese! To hhich Restricted.If An) INet MWel: --
- 10. Reasons for Restrictions. lf Any:
This Month Yr to-Date Cumulative II. Hours in Reporting Period i
- 12. Number Of Hours Reactor was Critical l
- 13. Reactor Resene Shutacan Hours
- 14. Hours Generator On Line
- 15. Unit Resene Shutdown linurs
- 16. Cross Thermal Energy Generated IMWil) 10,546,458 101,113,250
- 17. Gross Electrical Energy Genersted IMWill
- 18. Net Electrical Energy Generated (MWHI
- 19. Unit Senice Factor
- 20. Uni Availability Factor
- 21. Unit Capacity Factor (Using \\lDC Nerg
- 22. Unit Capacity FactoriUsing DER NetI
- 23. Unit Forced Outage Rate
}4.. Shutdowns Scheduled O=et Nest 6 Months IT> pe. Date, and Duration of Eacht:
- 25. If 5 hut Down At End Of Report PerioJ. Estimated Date of Startup:
- 26. Units In Test Status (Priser to Commercial Ost tiunt.
Forccse Achiesed INITIA L CRITICA LITY.
INITI4L ELECTRICITY i
COMMERCI AL OPER tTION 8205110577 820505 (9/77)
PDR ADOCK 05000317 R
1 l
g j
~
"c
/ ~
g A
g-OPERATING DaT \\ REPOR:j
- i. '
DOCKET NO. 50 318 DATE 5/5/82 COMPl.ETED BY Elaine Lotit o TELEfil0NE (301) 782,5363 OPER ATING STATUS
[
Calvert Cliffs #2 h-)!'S Revision l' Unit Name.'
Ju'Ty=1981
"~
~'~
- 2. Reporting Period: -_
- 3. Licensed Thermall'uv.cr s.\\lWt).
- 4. Nameplate Rating IGross MWe1:
i
$. Design Electrical Raim;:(Net Mhe)-
- 6. Masimum Depend 2D:e Capacity (Gross Mbe):
- 7. Maximum Dependab!c Capacity (Net Mbe):
- 8. If Changes Occur in Capadly Ratings litems Nur ter 3 lhnv ph 7) Since Last Report.Gi'e Reasons.
- 9. Power Lesello hhich Hestricted.lf Any (Net Llhd:
- 10. Reasons for Restrictiims. lf Any:
lhis Manth Ys.to Date Cumubtive
!!. Itours in Reporting Period I?. Number Oillours Heactor Was Critital
- 13. Rescrur Resene $5urdown liours
- 14. Hours Generator On Lme
- 15. Unit Resene Shutdown linurs
- 16. Cross Thermal Energy Generated IMWill 8,479,506 77,231,137
- 17. Gruss Electrical Energy Genersted IMWil) t8. Net Electrical Energy Generated (MbHi
- 19. Urtit Senite Factor
- 20. Unit Availability f actor
- 21. Unit Capacity Factor IUsing MDC Net t
- 22. Ur it Copacity Factor IUsing DER Net!
- 23. Unit Forced Outa;;e Rate
- 24. Shutdowns Scheduled Oier Nest 6 Mnnths (Type. Date.snd Duratmn of Eacht:
- 25. If Shur Down At End Of Report PerioJ. Estimated Date of $tartup:
- 26. Units in les Status (Prior to Cnmmercial Operationi Foercwt Acisesed INITIA L Chi TIC A L ITY,
INITIAL ELECTRICITY COM4!ERCI AL OPLR \\ TION (9/77)