Text
_ _ _ _ _.
i
~
p PErr.:n E. KArz Baltimore Gas and Electric Company Plant General Manager Calvert Cliffs Nuclear Power Pl.nt Calvert Cliffs Nuclear Power Plant 1650 Calven Cliffs Parkway Lusby, Maryland 20657 410 495-4101 January 15,1997 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 December 1996 Ooerating Data Reports The subject reports are being sent to you as required by Technical Specification 6.6.4.
Should you have any questions, please contact Mr. Kenneth Greene at (410) 495-4335.
Very truly yours,
./ -
l n.
h PEK/llOO/bjd Attachments l
cc:
D. A. Brune, Esquire R. A. Ilartfield, NRC J. E. Silberg, Esquire R. I. McLean, DNR Director, Project Directorate I-1, NRC J.11. Walter, PSC A. W. Dromerick, NRC P. Lewis, INPO l
- 11. J. Miller, NRC K. N. Larson, ANI j, & h(/
Resident Inspector, NRC I
/
9701230164 961231 PDR ADOCK 05000317 R
j UNIT 1 OPERATING DATA REPORT Docket No. 50-317 January 15, 1997 Prepared by Herman O. Olsen Telephone : (410) 495-6734 OPERATING STATUS
~~~~~~~~~~~~~~~~
1.
UNIT NAME Calvert Cliffs Unit 1 2.
REPORTING PERIOD DECEMBER 1996 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (NET MWe) 845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 8.
CHANGE IN CAPACITY RATINGS NONE 9.. POWER LEVEL TO WHICH RESTRICTED N/A i
- 10. REASONS FOR RESTRICTIONS N/A l
Year-Cumulative This month to-Date to Date
- 11. HOURS IN REPORTING PERIOD 744 8,784 189,805
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,869.4 137,295.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 744.0 5,763.2 134,486.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,005,260 15,226,315 342,728,319
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 672,458 5,053,662 113,765,362
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 646,397 4,823,699 108,348,192
- 19. UNIT SERVICE FACTOR 100.0 65.6 70.9
- 20. UNIT AVAILABILITY FACTOR 100.0 65.6 70.9
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 104.0 65.8 69.1
- 22. UNIT CAPACITY FACTOR (USING DER NET) 102.8 65.0 67.6
- 23. UNIT FORCED OUTAGE RATE 0.0 12.5 8.5
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT j
SIX MONTHS (TYPE, DATE AND DURATION):
i N/A
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-317 UNIT NAME Cahrrt Clifts-UI DATE January 15.1997 COMPLETED BY Herman O. Olsen' TELEPHONE (410)495-6734 REPORT MONTH December 1996 f METIIODOF SIRTITING LICENSEE CAUSE & CORRECT 1VE DURAllON DOWN EVENT SYSTEM COMPONENT ACllON TO (1IOURS)
REASON 2 REACTOR 3 REPORT #
CODE 4 CODES PREVENT RECURRENCE W
DATE TYPEI There were no significant power reductions for this month.
i t
l 1 F: Ferced 2 Reason:
3 Method:
4 IEEE Standard 805-1984 S: S:heduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 I
D - Regulatory Restriction 4 - Continued E - Operator Training & License Exanunation 5 - Reduced Load F - Administrative 9 - Other G - Operational Error H - Other m.
.m m
. -~..-
> = -
REFUELING INFORMATION REOUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2.
Scheduled date for next refueling shutdown: March 1998 3.
Scheduled date for restart following refueling: May 1998 4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendnent?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting infornation.
N/A 6.
Important licensing considerations associated with the refueling.
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1402 (Note 2)
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
I (a) 4710 (Note 1)
(b)0 l
l 9.
'Ihe projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2007 i
I NOTE 1:
4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2:
360 Spent Fuel Assemblies in the ISFSI.
Entry has changed since last reported.
a i
l r
y
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 January 15, 1997 Prepared by Herman O. Olsen Telephone: (410) 495-6734 DECEMBER 1996 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 868 17 867 2
868 18 870 3
869 19 871 1
4 866 20 869 5
869 21 869 6
869 22 869 7
870 23 868 8
870 24 868 9
870 25 869 10 870 26 868 11 868 27 869 12 869 28 869 13 870 29 869 14 866 30 868 15 870 31 868 16 869 l
1 l
t
DOCKET NO. 50-317 CALVERT CLIFFS - UNIT 1 January 15,1997
SUMMARY
OF OPERATING EXPERIENCE December 1996 The unit operated at 100% power for the entire month.
000*************************************************************************
UNIT 2 l
OPERATING DATA REPORT oco*************************************************************************
Docket No. 50-318 January 15, 1997 Prepared by Herman O. Olsen Telephone : (410) 4 95-6734 OPERATING STATUS
~~~~~~~~~~~~~~~~
l 1.
UNIT NAME Calvert Cliffs Unit 2 2.
REPORTING PERIOD DECEMBER 1996 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 911 5.
DESIGN ELECTRICAL RATING (NET MWe) 845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Year-Cumulative This month to-Date to Date 11, HOURS IN REPORTING PERIOD 744 8,784 173,160
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8,599.6 129,842.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,196.6
- 14. HOURS GENERATOR ON LINE 744.0 8,561.6 12 (.,135.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (;MWH) 1,<78,712 22,764,173 329,094,384
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 664,770 7,547,886 108,737,414
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 639,417 7,247,739 103,977,183
- 19. UNIT SERVICE FACTOR 100.0 97.5 74.0
- 20. UNIT AVAILABILITY FACTOR 100.0 97.5 74.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.3 98.2 72.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 101.7 97.6 71.1
- 23. UNIT FORCED OUTAGE RATE 0.0 2.8 5.4 j
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
Refueling 03/14/96 46 days
- 35. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A l
i t
. UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-318 UNIT NAME Cahrrt Cliffs-U2 DATE January 15. 1997-COMPLETED BY Herman O. Olsen TELEPHONE (410) 495-6734 REPORT MONTH December 1996 METilOD OF 1
SIlUITING LICENSEE CAUSE & CORREC11VE DURATION DOWN EVENT SYSTEM COMPONINF ACTION TO (IIOURS)
REASON 2 REACTOR 3 REPORT #
CODE 4 CODES PREVINT RECURRENCE NO.
DATE TYPEI There were no significant power reductions for this month.
1 t
P 6
t
?
[
1 F: Forced 2 Reason:
3 Method:
4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued i
E - Operator Training & License Examination 5 - Reduced Load F - Admimstrative 9 - Other G -Operational Error
}
H - Other t
.m..
. ~,.
i REFUELING INFORMATION REOUEST 1.
Name of facility: Calvert Clifts Nuclear Power Plant, Unit No. 2 2.
Scheduled date for next refueling shutdown: March 14,1997 3.
Scheduled date for restart following refueling: April 29,1997
- 4.
Will refueling or resumption of operation thereafter require a Technical Specification change or otherlicense amendment?
Yes.
License Amendment to adopt the requirements of Appendix J, Option B for Type B a.
and C testing, b.
License Amendment to allow the substitution of a blind flange for the outside purge valve pressure boundary in Modes 1-4.
j License Amendment to allow the use of a temporary closure in place of the equipment c.
l hatch in Modes 5 and 6.
d.
License Amendment to lower the reactor coolant flow which supports an increased number of steam generator tubes plugged.
l License Amendment to clarify wording on shutdown cooling maintenance Technical e.
l Specification to allow openings in containment during the maintenance, f.
License Amendment to al!ow electrosleeving as a repair method for steam generator tubes.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
a.
November 26,1996 b.
August 1,1996 i
c.
January 1997 a d.
January 1997 e.
January 1997
- f.
July 26,1996 6.
Important licensing considerations associated with the refueling.
None.
i 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1402 (Note 2)
Spent fuel pools are common to Units I and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 4710 (Note 1)
(b) 0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2007 i
NOTE 1:
4710 totallicensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2:
360 Spent Fuel Assemblies in the ISFSI.
Entry has changed since last reported.
l 1
1 1
J l
I l
i
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 January 15, 1997 Prepared by Herman O.
Olsen Telephone: (410) 495-6734 DECEMBER 1996 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 861 17 865 i
2 860 18 863 3
862 19 864 4
866 20 863 5
864 21 863 6
864 22 863 7
864 23 853 8
864 24 837 9
864 25 862 10 863 26 863 11 864 27 864 12 864 28 861 13 864 29 833 14 863 30 825 15 864 31 824 16 863 l
l l
... -.. -... ~.
l DOCKET NO. 50-318 CALVEf,T CLIFFS - UNIT 2 January 15,1997
SUMMARY
OF OPERATING EXPERIENCE l
Dgcember 1996 j
The unit began the month at 100% power.
On 12/23/96 at 1225, power was reduced to approximately 95%, as a conservative measure, due to a reduction in the cooling capacity of the main power oatput transformer (U-220000-22).
I Power was maintained between 95 - 100%, based on the outside ambient air temperature, for the remainder i
l of the month.