Revised Monthly Operating Repts for Jan 1982
ML20052F011
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/05/1982
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20052E950 List:
References
NUDOCS 8205110632
Download: ML20052F011 (2)


Text

-

J s

OPER AT1.NG DAT A REPORT DOCKET NO. 50-317 DATE 5/5/82 COMPLETED BY Elaine Lotito TELEPilONE (301) 78.7 5363 OPERATING STATUS

, _ gg,,,

Calvert Cliffs #1 Notes ' Revision

2. Repunting Period.

J nua n 1982

3. Li:ensed Thermal Power tMW ):
4. Nameplate Rating (Gro>s MWel:
5. Desiga Electrical Raim;(Net MWe):
6. Maximum Dependable Capacity (Gross MWel:
7. Maximum Dependabic Capacity (Net MWe):
8. If Changes Occur in Capeity Rati,gs litems Nur,ter 3 ThrouFh 7) Since Last Report.Gise Reasons.

1

9. Power Lesel To bhich Hestricted. lf Any (Net Athen:
10. Reasons For Restrictions. If Any:

This Month Yr..to-Da t e Cumulative

11. Hours in Reportir g Period
12. Number O(ifoun Reactor Was Critical
13. Reactor Resene Shutdown l{ours
14. Hours Generator On.Lme
15. Unit Resene Shutdown flours
16. Gross Thermal Energy Generated 1MWH) 111,892,782
17. Gross Electrical Energy Generated IMWH)
18. Net Electrical Energy G-nerated (MWill
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using \\tDC Neil
22. Unit Capacity Factor tusing DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Nest 6 Months (Type. Date, and Duration of Each t:
25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units in Test Status (Prior o Commerci21 Operstion):

Foreca Achiesed INITIA L CRITICA LITY INITIA L ELECTRICIT Y COMilERCI A L OPE R ATION 8205110632 820505 gDRADOCK 05000317 PDR (9/77)

.y c

OPER A T!.\\G DA T A i t POR T DOCKET NO. 3 -318 DATE 5/5/82 COMPL ETED BY Elaine 1.t>t i to T ELEI'll0NE (301) 787.5363 OPERATING STATUS

1. Unit Name:

CaIvert C1iffs #2 b o t

January 193T

~~

Revision

2. Reportmg Period: __
3. Licensed ThermslI'vwer t.'.twil;
4. Nameplate R: ling IGrois AIWe): =

$. Design Electrical Ratmg INet Mhel:

6. Maximum DependaMe Capacity (Gross Mbel.
7. Maximum Dependabic Capacity (Net Mhe).

fi. If Changes Occur in Capsary Ratings litems Nomter 3 Thrngh 7) Since Last Rerust. Gi'c iteasons.

9. Power Lesel To hhich Hestricted.lf Any INet Athei:
10. Reasons For Resenctions. lf Any:

This M anth Ye to-Date Ct.mulative

!!. I! curs in Reporting Period

12. Number O(Ilours Reactor %s Critical
13. Resetor Re>erse shutdown liours
14. tfours Generator On Lme l$. Unit Resene Shutdown flours
16. Gross Thennal Energy Generated IMWH) 88,007.706 17 Gross Electrical Energy Generated IMWill IS. Net Elcetrical Energy Generated IMWHi
19. Unit Senice factor
20. Unit Assilability f actot
21. Urd Capacity Factor IUung \\lDC NetI
22. Ur.it Cepaciry Fsetor Uunj DER Net)
23. Unit Forced Outage R:te
24. f,hutdowns Scheduhd Over Nest 6 Mnnths IT>pe. liste, and Duratmn un Eacht:

2$. If Shut Down At End Of Report PetioJ. Estimated Date of Startup.

24. Units in Test Status tPrior to Commercul operation)

Focecast Actsesed thlTIAL CRITICALITY INITIA L ELECintlCITY COMMERCl 4L OPE R ATION (1/77)