Text
-
J s
OPER AT1.NG DAT A REPORT DOCKET NO. 50-317 DATE 5/5/82 COMPLETED BY Elaine Lotito TELEPilONE (301) 78.7 5363 OPERATING STATUS
, _ gg,,,
Calvert Cliffs #1 Notes ' Revision
- 2. Repunting Period.
J nua n 1982
- 3. Li:ensed Thermal Power tMW ):
- 4. Nameplate Rating (Gro>s MWel:
- 5. Desiga Electrical Raim;(Net MWe):
- 6. Maximum Dependable Capacity (Gross MWel:
- 7. Maximum Dependabic Capacity (Net MWe):
- 8. If Changes Occur in Capeity Rati,gs litems Nur,ter 3 ThrouFh 7) Since Last Report.Gise Reasons.
1
- 9. Power Lesel To bhich Hestricted. lf Any (Net Athen:
- 10. Reasons For Restrictions. If Any:
This Month Yr..to-Da t e Cumulative
- 11. Hours in Reportir g Period
- 12. Number O(ifoun Reactor Was Critical
- 13. Reactor Resene Shutdown l{ours
- 14. Hours Generator On.Lme
- 15. Unit Resene Shutdown flours
- 16. Gross Thermal Energy Generated 1MWH) 111,892,782
- 17. Gross Electrical Energy Generated IMWH)
- 18. Net Electrical Energy G-nerated (MWill
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using \\tDC Neil
- 22. Unit Capacity Factor tusing DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Nest 6 Months (Type. Date, and Duration of Each t:
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units in Test Status (Prior o Commerci21 Operstion):
Foreca Achiesed INITIA L CRITICA LITY INITIA L ELECTRICIT Y COMilERCI A L OPE R ATION 8205110632 820505 gDRADOCK 05000317 PDR (9/77)
.y c
OPER A T!.\\G DA T A i t POR T DOCKET NO. 3 -318 DATE 5/5/82 COMPL ETED BY Elaine 1.t>t i to T ELEI'll0NE (301) 787.5363 OPERATING STATUS
- 1. Unit Name:
CaIvert C1iffs #2 b o t
January 193T
~~
Revision
- 2. Reportmg Period: __
- 3. Licensed ThermslI'vwer t.'.twil;
- 4. Nameplate R: ling IGrois AIWe): =
$. Design Electrical Ratmg INet Mhel:
- 6. Maximum DependaMe Capacity (Gross Mbel.
- 7. Maximum Dependabic Capacity (Net Mhe).
fi. If Changes Occur in Capsary Ratings litems Nomter 3 Thrngh 7) Since Last Rerust. Gi'c iteasons.
- 9. Power Lesel To hhich Hestricted.lf Any INet Athei:
- 10. Reasons For Resenctions. lf Any:
This M anth Ye to-Date Ct.mulative
!!. I! curs in Reporting Period
- 12. Number O(Ilours Reactor %s Critical
- 13. Resetor Re>erse shutdown liours
- 14. tfours Generator On Lme l$. Unit Resene Shutdown flours
- 16. Gross Thennal Energy Generated IMWH) 88,007.706 17 Gross Electrical Energy Generated IMWill IS. Net Elcetrical Energy Generated IMWHi
- 19. Unit Senice factor
- 20. Unit Assilability f actot
- 21. Urd Capacity Factor IUung \\lDC NetI
- 22. Ur.it Cepaciry Fsetor Uunj DER Net)
- 23. Unit Forced Outage R:te
- 24. f,hutdowns Scheduhd Over Nest 6 Mnnths IT>pe. liste, and Duratmn un Eacht:
2$. If Shut Down At End Of Report PetioJ. Estimated Date of Startup.
- 24. Units in Test Status tPrior to Commercul operation)
Focecast Actsesed thlTIAL CRITICALITY INITIA L ELECintlCITY COMMERCl 4L OPE R ATION (1/77)