ML20052E987
Jump to navigation
Jump to search
| ML20052E987 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 05/05/1982 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20052E950 | List: |
| References | |
| NUDOCS 8205110596 | |
| Download: ML20052E987 (2) | |
Text
-
s OPERATI.NG DATA REPORT DOCKET NO.52-317 DATE 5/5/82 COMPLETED DY Elaine Lotito TELEPilONE (301) 78./ 5363 OPERATING STATUS
- 1. Unit Name:
Calvert Cliffs #1 Notes Revision August N
- 2. Reporting Period.
- 3. Licenwd Thermal Powcr iMW ):
- 4. Nameplate Rating (Gross Alhe):
- 5. Design Electrical Raimg (Net Mhe):
- 6. Maximum Dependable Capacity (Gross Mbe):
- 7. Maximum Dependabic Capacity (Net MWe):
- 8. If Changes Oecur in Capseity Ratings (leems Nurnter 3 Thmugh 7) Since Last Report.Gi e Reasons.
- 9. Power Leiel To hhich Hestricted. lf Any (Net 4then:
- 10. Reawns For Restnctions. lf Any:
This Manth Yr..to-Date Cumulatin 4
- 11. ifours In Reportmg Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown liours
- 14. Ifoues Generator On.Luie
- 15. Unit Resene Shutdown flours
- 16. Gross Thermal Energy Generated IMWit)
__12.371.965 102.938,757
- 17. Gross Electrical Energy Genersted (MWill
- 18. Net Electrical Energy Generated (MWill
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capscity Factor (Using MDC Nett
- 22. Unit Capacity f actor IUsing DER Neil
- 23. Unit Forced Outage Rate
- 24. Shutdowns Schedc!cd 0 cr Nest 6 Months (T3pe. Date.and Duration of Eacht-
- 25. If Shut Down At End Of Report Period,Fstimated Date of Startup:
- 26. Units in Test Statui tPrior to Commercial 0pers son t:
Forecast Achieved INITIA L CRITIC A LITY.
INITIAL ELECTRICITY CO'.filERCl4L OPE R.gTION l
8205110596 820505 PDR ADOCK 05000317 (9/77)
R PDR
OPERATI.NG DAT A nf PORT DOCKET No.10-318 DATE 3/5/82 COMPl.ETED DY Elaine Lotito TELEPilONE 7301) 787.,5363 OPERATING STAT US
- 1. Unir Name:
Calvert Cliffs #2
%:es ' l<evision August 19%T ' '
~
- 2. Reiurtmg Period:
- 3. Licensed Thermal!wer t'.lW:).
- 4. Nameplate flatinE tG80>s MWeI: -
- 5. Desig:t Electriest Ratin;lNet Mbei
- 6. Masimum Dependaa'e Capacity (Grms Mbe). --
- 7. Maximum Dependab!c Capacity (Net Mhe):
- 8. If Changes Occur in Cap., city Ratings (Irems Norder 3 T hrm.ph 7) Sinse Last Rep.nt. Gs'e Reasons.
- 9. Powcr Lesel To bhich idestricted,1f Any INet Llha ___. _ __
- 10. Reasons For Restnctions.lf Any:
_ _ _ _ = -.. - - -.
This M mth Yr to-Date Cumulative
- 11. Hours in Reporting Period
- 12. Number Or llours Reactor Was Critical
- 13. Reseter Resene Shutdown Hours
- 14. Houn Generator On.Line IS. Unit Resene Shutdown }inurs
- 16. Cross Thermal Energy Generated IMWH1
____10,225,760 78,977,391
- 17. Gross Electrical Energy Generated IMWH)
- 18. Ne Electrical Energy Generated (MWHi
- 19. Unit Senice Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Usmg \\tDC Net t
- 22. Ur:: Capacity Factor Using DER Net!
- 23. Unit Forced Ourage Rate
- 24. Shutdowns Scheduled Over Nest 6 Months IT3 pe. Date.and Duras,<>n of Eacht:
- 25. H Shut Down At End Of Report Permd. Estimated Date cf Startup:
- 26. Unitiin Test S'atus irrior to Commercial Oper tion Foceent Actsesed INITIA L CRITIC A tlT'r INITI \\ L ELECTitiCIT Y COM\\lERCl AL OPFR \\ TION (9/77)
.