Monthly Operating Repts for Mar 1997 for Calvert Cliffs Nuclear Power Plant
ML20137W878
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/31/1997
From: Katz P, Olsen H
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9704210052
Download: ML20137W878 (12)


Text

_ _ _ _ _ _ _ _ - -

PETER E. KATZ Ba!timore Gas and Electric Company Plant General Manager Calvert Cliffs Nuclear Power Plant Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 April 15,1997 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 March 1997 Onerating Data Renorts The subject reports are being sent to you as required by Technical Specification 6.6.4.

Should you have any questions, please contact Mr. Kenneth Greene at (410) 495-4385.

Very truly yours, PEK/HOO/bjd Attachments cc: R. S. Fleishman, Esquire R. A. Hartfield, NRC J. E. Silberg, Esquire R. I. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC Director, Project Directorate I-1, NRC P. Lewis,INPO H. J. Miller, NRC K. N. Larson, ANI g

f Resident Inspector, NRC 9704210052 970331 PDR ADOCK 05000317

[

D,y -

ML l

_ _- a

QQ**************************************************************************

UNIT 1 OPERATING DATA REPORT QC**************************************************************************

Docket No. 50-317 April 15, 1997 Prepared by Herman O. Olsen Telephone : (410) 4 95-6734 OPERATING STATUS

~ -~~~~ ~~ ~ .

1. UNIT NAME Calvert Cliffs Unit 1
2. REPORTING PERIOD MARCH 1997
3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 918
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Year- Cumulative This month to-Date to Date
11. HOURS IN REPORTING PERIOD 744 2,160 191,965
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 139,455.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
14. HOURS GENERATOR ON LINE 744.0 2,129.9 136,616.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 <
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,006,072 5,706,656 348,434,975 I
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 671,258 1,911,587 115,676,949
18. NET ELECTRICAL ENERGY GENERATED (MWH) 645,220 1,835,858 110,184,050
19. UNIT SERVICE FACTOR 100.0 98.6 71.2
20. UNIT AVAILABILITY FACTOR 100.0 98.6 71.2  !
21. UNIT CAPACITY FACTOR (USING MDC NET) 103.9 101.8 69.4 l
22. UNIT CAPACITY FACTOR (USING DER NET) 102.6 100.6 67.9 j
23. UNIT FORCED OUTAGE RATE 0.0 1.4 8.4
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION): )

N/A j l

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A

UNIT SIIUTDOWNS AND POWER REDUCTIONS ~

DOCKET NO. 50-317 _

UNIT NAME Cahert Cliffs-U1

~

DATE April 15.1997 4

COMPLETED BY Herman O. Olsen TELEPHONE (410)495-6734 REPORT MONTH March 1997 METIIOD OF SilUITING LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSTIEM COM10NENT ACTION TO NO. DATE TYPEI (1IOURS) REASON 2 REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE There were no significant power reductions for this month. j h

i i

t 1 F: Forced 2 Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual i B - Maintenance or Test 2 - Manual Scram.

C - Refueling Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Exammation 5 - Reduced Load F - Administrative 9 - Other i G - Operational Error  !

t H - Other

.~ __ . _ _ _ . . . . . .. . - - -. _ . . .

REFUELING INFORMATION REOUEST

1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2. Scheduled date for next refueling shutdown: March 1998
3. Scheduled date for restart following refueling: May 1998
4. Will refueling or resumption of operat;on thereafter require a Technical Specification change or other license amendment?

N/A

5. Scheduled date(s) for submitting proposed licensing action and supposting information.

N/A

6. Important licensing considerations associated with the refueling.

N/A

7. He number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1520 (Note 2)

Spent fuel pools are common to Units I and 2.

8. (a) He present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblics.

(a) 4710 (Note 1) (b) 0 ,

9. He projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 2007 NOTE 1: 4710 total licensed site storage capacity.

(1830 pool + 2880 ISFSI) i NOTE 2: 360 Spent Fuel Assemblies in the ISFSI.

Includes 92 new Batch 2P fuel assemblies and 26 offloaded fuel assemblies.

4 I

r, ._

AVERAGE DAILY UNIT POWER LEVEL odo****,*****************************************************************

Docket No. 50-317 Calvert Cliffs Unit No. 1 April 15, 1997 Prepared by Herman O. Olsen Telephone: (410) 495-6734 MARCH 1997 Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 867 17 866 -

2 867 18 867 3 867 19 868 4 868 20 868 5 868 21 868 4

6 868 22 867 7 869 23 868 8 868 24 868 9 868 25 867 10 867 26 867 11 866 27 867 b

12 867 28 867 13 867 29 868 14 867 30 867 15 866 31 868 16 868

l DOCKET NO. 50-317 l

C'ALVERT CLIFFS - UNIT I April 15,1997

SUMMARY

OF OPERATING EXPERIENCE l

h1 arch 1997 -

i The unit operated at 100% power for the entire month.

l l

\

l i

I 1

i I

l l

1 l

1 I

l l

l l

l

c .

l l

l

? 1 000*************************************************************************

l UNIT 2 l OPERATING DATA REPORT l

00************************************************************************** )

l Docket No. 50-318 l April 15, 1997 l Prepared by Herman O. Olsen l

Telephone : (410) 4 95-6734 OPERATING STATUS l

~~~~~~~~~~~~~~~~

1. UNIT NAME Calvert Cliffs Unit 2
2. REPORTING PERIOD MARCH 1997 l 3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 911
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Year- Cumulative This month to-Date to Date i
11. HOURS IN REPORTING PERIOD 744 2,160 175,320

, 12. NUMBER OF HOURS REACTOR WAS CRITICAL 337.9 1,753.9 131,596.3

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
14. HOURS GENERATOR ON LINE 336.3 1,752.3 129,887.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l 16. GROSS THERMAL ENERGY GENERATED (MWH) 777,451 4,511,411 333,605,795
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 262,080 1,513,092 110,250,506
18. NET ELECTRICAL ENERGY GENERATED (MWH) 249,486 1,451,747 105,428,930
19. UNIT SERVICE FACTOR 45.2 81.1 74.1
20. UNIT AVAILABILITY FACTOR 45.2 81.1 74.1
21. UNIT CAPACITY FACTOR (USING MDC NET) 39.9 80.0 72.7
22. UNIT CAPACITY FACTOR (USING DER NET) 39.7 79.5 71.2
23. UNIT FORCED OUTAGE RATE 0.0 0.0 5.3
24. SHUTDONNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION)-

1 N/A i

! 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

1 05/04/97 l

l

~

UNIT SHUTDOWNS AND POWER REDUCTIONS ~

DOCKET NO. 50-318 -

UNIT NAME Calvert Cliffs-U2 .

~

DATE April 15.1997 COMPLETED BY Herman O. Olsen TELEPHONE (410) 495-6734 REPORT MONTH March 1997 METIIOD OF SIRTITING LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSE M COMPONENT ACTION TO NO. DAE TYPEI (IIOURS) REASON 2 REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE 97CD1 03/14/97 S 407.7 C 1 N/A N/A N/A On 03/14/97 a reduction in power was commenced in preparation :or the scheduled refueling outage. The outage commenced on 03/15/97 at 0016 when the unit was removed from the grid.

1 1 F: Forced 2 Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C - Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued '

E - Operator Training & License Examination 5 - Reduced Load F - Administrative 9 - Other G - Operational Error H - Other ,

., - - . . - . - . . - __ . -- .- -- ~ . . . _ _ .

REFUELING INFORMATION REOUESI

1. Name of facility: Calvert Clifts Nuclear Power Plant, Unit No. 2 ,

l

2. Scheduled date for next refueling shutdown: Unit is currently shutdown for refueling.
  • l
3. Scheduled date for restart following refueling: May 4,1997 l
4. Will refueling or resumption of operation thereafter require a Technical Specification change or ,

other license amendment? I Yes.

l

a. License Amendment to adopt the requirements of Appendix J, Option B for Type B and C testing.

l b. License Amendment to allow the substitution of a blind flange for the outside purge j valve pressure boundary in Modes 1-4.

l

c. Deleted. l
d. License Amendment to lower the reactor coolant flow which supports an increased number of steam generator tubes plugged.
c. Deleted.
f. License Amendment to allow electrosleeving as a repair method for steam generator tubes.

I

g. Unreviewed Safety Question to allow pressurization of the Service Water System in response to Generic Letter 96-06. *
5. Scheduled date(s) for submitting proposed licensing action and supporting information.
a. November 26,1996 l b. August 1,1996 l
c. Deleted
d. January 31,1997
e. Deleted
f. July 26,1996 i
g. March 6,1997 *
6. Important licensing considerations associated with the refueling.

None.

L J

-_. =_- - .. .. . . . . - - _ _ . . - . . .

'7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 191 * (b) 1520 (Note 2)

  • j Spent fuel pools are coctmon to Units 1 and 2.
8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in l licensed storage capacity that has been requested or is planned, in number of fuel assemblies. l i

(a) 4710 (Note 1) (b) 0

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

3 March 2007 l

NOTE 1: 4710 total licensed site storage capacity.

(1830 pool + 2880 ISFSI)

NOTE 2: 360 Spent Fuel Assemblies in the ISFSI. ,

Includes 92 new Batch 2P fuel assemblies and 26 offionded fuel assemblies. l Entry has cieuged since last reported.

l I

i

~

. AVERAGE DAILY UNIT POWER LEVEL e4.*********************************************************************

l Docket No. 50-318 Calvert Cliffs Unit No. 2 April 15, 1997 Prepared by Herman O. Olsen Telephone: (410) 495-6734 MARCH 1997 Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 791 17 -3 2 783 18 -3 3 777 19 -3 4 770 20 -3 5 763 21 -3 6 757 22 -3 7 751 23 -3 8 746 24 -3 4

9 739 25 -3

, 10 734 26 -3 11 728 27 -3 12 722 28 -3 13 715 29 -3 14 667 30 -3 15 -3 31 -3 16 -2 1

1

_. )

. t QOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 April 15,1997

SUMMARY

OF OPERATING EXPERIENCE I

March 1997 The unit began the month at 90% power as part of a gradual planned reduction in power (fuel coastdown),

in preparation for the refueling outage.

Power was slowly reduced to 82% by 03/13/97 at 1800. .

t l On 03/14/97 at 2058 power was reduced to support removing the Main Generator from the grid. The Main  ;

l generator was removed from the grid and the Refueling Outage commenced on 03/15/97 at 0016.  ;

The reactor coolant system was placed in a reduced inventory status on 03/22/97 at 1125 to support the planned Steam Generator Inspections. On 03/23/97 the unit entered mode 6, refueling with the reactor vessel head detensioned. The reactor coolant system exited the reduced inventory status on 03/23/97 at 2045.

The following significant work was completed or in progress during the month: l t - - Reactor Vessel Refueling.

l

\

- Steam Generator eddy current testing.

The unit was in mode 6 (refueling) for the remainder month.