Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 ML20247H5661998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Ccnpp ML20216G4601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20248L3641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20202G6611998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198N9441997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Calvert Cliffs Nuclear Power Plant,Units 2 & 3 ML20203H3081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Calvert Cliffs Nuclear Power Plant ML20199D0801997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198J6631997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Calvert Cliffs Nuclear Power Plant ML20210U7031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ccnpp ML20210L0671997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Ccnpp ML20149E2301997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Calvert Cliffs Nuclear Power Plant ML20148L1761997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CCNP ML20141F1401997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20137W8781997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Calvert Cliffs Nuclear Power Plant ML20136J4941997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20134M2891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20133N1031996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20132D1141996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2 ML20134L6621996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Calvert Cliffs Nuclear Power Plant Unit 1 & 2 ML20128Q8011996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Calvert Cliffs Npp,Units 1 & 2 ML20117N2171996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20116M6701996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20115F7281996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112J1291996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112A2421996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20107C1831996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20101D7831996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ccnpp ML20149K8721996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ccnpp ML20096D7031995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ccnpp Units 1 & 2 ML20095H3741995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20096D7171995-11-30030 November 1995 Rev to Monthly Operating Rept for Nov 1995 for Ccnpp Unit 2 ML20094M0161995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Calvert Cliffs Nuclear Plant ML20093G5881995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Calvert Cliffs Nuclear Power Plants Units 1 & 2 ML20092G3521995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Calvert Cliffs Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30
[Table view] |
Text
_ _ _ _ _ _ _ _ - -
PETER E. KATZ Ba!timore Gas and Electric Company Plant General Manager Calvert Cliffs Nuclear Power Plant Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 April 15,1997 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 March 1997 Onerating Data Renorts The subject reports are being sent to you as required by Technical Specification 6.6.4.
Should you have any questions, please contact Mr. Kenneth Greene at (410) 495-4385.
Very truly yours, PEK/HOO/bjd Attachments cc: R. S. Fleishman, Esquire R. A. Hartfield, NRC J. E. Silberg, Esquire R. I. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC Director, Project Directorate I-1, NRC P. Lewis,INPO H. J. Miller, NRC K. N. Larson, ANI g
f Resident Inspector, NRC 9704210052 970331 PDR ADOCK 05000317
[
D,y -
ML l
_ _- a
QQ**************************************************************************
UNIT 1 OPERATING DATA REPORT QC**************************************************************************
Docket No. 50-317 April 15, 1997 Prepared by Herman O. Olsen Telephone : (410) 4 95-6734 OPERATING STATUS
~ -~~~~ ~~ ~ .
- 1. UNIT NAME Calvert Cliffs Unit 1
- 2. REPORTING PERIOD MARCH 1997
- 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835
- 8. CHANGE IN CAPACITY RATINGS NONE
- 9. POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Year- Cumulative This month to-Date to Date
- 11. HOURS IN REPORTING PERIOD 744 2,160 191,965
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 139,455.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 744.0 2,129.9 136,616.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 <
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,006,072 5,706,656 348,434,975 I
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 671,258 1,911,587 115,676,949
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 645,220 1,835,858 110,184,050
- 19. UNIT SERVICE FACTOR 100.0 98.6 71.2
- 20. UNIT AVAILABILITY FACTOR 100.0 98.6 71.2 !
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.9 101.8 69.4 l
- 22. UNIT CAPACITY FACTOR (USING DER NET) 102.6 100.6 67.9 j
- 23. UNIT FORCED OUTAGE RATE 0.0 1.4 8.4
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION): )
N/A j l
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A
UNIT SIIUTDOWNS AND POWER REDUCTIONS ~
DOCKET NO. 50-317 _
UNIT NAME Cahert Cliffs-U1
~
DATE April 15.1997 4
COMPLETED BY Herman O. Olsen TELEPHONE (410)495-6734 REPORT MONTH March 1997 METIIOD OF SilUITING LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSTIEM COM10NENT ACTION TO NO. DATE TYPEI (1IOURS) REASON 2 REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE There were no significant power reductions for this month. j h
i i
t 1 F: Forced 2 Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual i B - Maintenance or Test 2 - Manual Scram.
C - Refueling Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Exammation 5 - Reduced Load F - Administrative 9 - Other i G - Operational Error !
t H - Other
.~ __ . _ _ _ . . . . . .. . - - -. _ . . .
REFUELING INFORMATION REOUEST
- 1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
- 2. Scheduled date for next refueling shutdown: March 1998
- 3. Scheduled date for restart following refueling: May 1998
- 4. Will refueling or resumption of operat;on thereafter require a Technical Specification change or other license amendment?
N/A
- 5. Scheduled date(s) for submitting proposed licensing action and supposting information.
N/A
- 6. Important licensing considerations associated with the refueling.
N/A
- 7. He number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1520 (Note 2)
Spent fuel pools are common to Units I and 2.
- 8. (a) He present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblics.
(a) 4710 (Note 1) (b) 0 ,
- 9. He projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2007 NOTE 1: 4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI) i NOTE 2: 360 Spent Fuel Assemblies in the ISFSI.
Includes 92 new Batch 2P fuel assemblies and 26 offloaded fuel assemblies.
4 I
r, ._
AVERAGE DAILY UNIT POWER LEVEL odo****,*****************************************************************
Docket No. 50-317 Calvert Cliffs Unit No. 1 April 15, 1997 Prepared by Herman O. Olsen Telephone: (410) 495-6734 MARCH 1997 Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 867 17 866 -
2 867 18 867 3 867 19 868 4 868 20 868 5 868 21 868 4
6 868 22 867 7 869 23 868 8 868 24 868 9 868 25 867 10 867 26 867 11 866 27 867 b
12 867 28 867 13 867 29 868 14 867 30 867 15 866 31 868 16 868
l DOCKET NO. 50-317 l
C'ALVERT CLIFFS - UNIT I April 15,1997
SUMMARY
OF OPERATING EXPERIENCE l
h1 arch 1997 -
i The unit operated at 100% power for the entire month.
l l
\
l i
I 1
i I
l l
1 l
1 I
l l
l l
l
c .
l l
l
? 1 000*************************************************************************
l UNIT 2 l OPERATING DATA REPORT l
00************************************************************************** )
l Docket No. 50-318 l April 15, 1997 l Prepared by Herman O. Olsen l
Telephone : (410) 4 95-6734 OPERATING STATUS l
~~~~~~~~~~~~~~~~
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD MARCH 1997 l 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 911
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840
- 8. CHANGE IN CAPACITY RATINGS NONE
- 9. POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Year- Cumulative This month to-Date to Date i
- 11. HOURS IN REPORTING PERIOD 744 2,160 175,320
, 12. NUMBER OF HOURS REACTOR WAS CRITICAL 337.9 1,753.9 131,596.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 336.3 1,752.3 129,887.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l 16. GROSS THERMAL ENERGY GENERATED (MWH) 777,451 4,511,411 333,605,795
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 262,080 1,513,092 110,250,506
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 249,486 1,451,747 105,428,930
- 19. UNIT SERVICE FACTOR 45.2 81.1 74.1
- 20. UNIT AVAILABILITY FACTOR 45.2 81.1 74.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 39.9 80.0 72.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 39.7 79.5 71.2
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 5.3
- 24. SHUTDONNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION)-
1 N/A i
! 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
1 05/04/97 l
l
~
UNIT SHUTDOWNS AND POWER REDUCTIONS ~
DOCKET NO. 50-318 -
UNIT NAME Calvert Cliffs-U2 .
~
DATE April 15.1997 COMPLETED BY Herman O. Olsen TELEPHONE (410) 495-6734 REPORT MONTH March 1997 METIIOD OF SIRTITING LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSE M COMPONENT ACTION TO NO. DAE TYPEI (IIOURS) REASON 2 REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE 97CD1 03/14/97 S 407.7 C 1 N/A N/A N/A On 03/14/97 a reduction in power was commenced in preparation :or the scheduled refueling outage. The outage commenced on 03/15/97 at 0016 when the unit was removed from the grid.
1 1 F: Forced 2 Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued '
E - Operator Training & License Examination 5 - Reduced Load F - Administrative 9 - Other G - Operational Error H - Other ,
., - - . . - . - . . - __ . -- .- -- ~ . . . _ _ .
REFUELING INFORMATION REOUESI
- 1. Name of facility: Calvert Clifts Nuclear Power Plant, Unit No. 2 ,
l
- 2. Scheduled date for next refueling shutdown: Unit is currently shutdown for refueling.
- 3. Scheduled date for restart following refueling: May 4,1997 l
- 4. Will refueling or resumption of operation thereafter require a Technical Specification change or ,
other license amendment? I Yes.
l
- a. License Amendment to adopt the requirements of Appendix J, Option B for Type B and C testing.
l b. License Amendment to allow the substitution of a blind flange for the outside purge j valve pressure boundary in Modes 1-4.
l
- c. Deleted. l
- d. License Amendment to lower the reactor coolant flow which supports an increased number of steam generator tubes plugged.
- c. Deleted.
- f. License Amendment to allow electrosleeving as a repair method for steam generator tubes.
I
- g. Unreviewed Safety Question to allow pressurization of the Service Water System in response to Generic Letter 96-06. *
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- a. November 26,1996 l b. August 1,1996 l
- c. Deleted
- d. January 31,1997
- e. Deleted
- f. July 26,1996 i
- g. March 6,1997 *
- 6. Important licensing considerations associated with the refueling.
None.
L J
-_. =_- - .. .. . . . . - - _ _ . . - . . .
'7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 191 * (b) 1520 (Note 2)
- j Spent fuel pools are coctmon to Units 1 and 2.
- 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in l licensed storage capacity that has been requested or is planned, in number of fuel assemblies. l i
(a) 4710 (Note 1) (b) 0
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
3 March 2007 l
NOTE 1: 4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
- NOTE 2: 360 Spent Fuel Assemblies in the ISFSI. ,
Includes 92 new Batch 2P fuel assemblies and 26 offionded fuel assemblies. l Entry has cieuged since last reported.
l I
i
~
. AVERAGE DAILY UNIT POWER LEVEL e4.*********************************************************************
l Docket No. 50-318 Calvert Cliffs Unit No. 2 April 15, 1997 Prepared by Herman O. Olsen Telephone: (410) 495-6734 MARCH 1997 Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 791 17 -3 2 783 18 -3 3 777 19 -3 4 770 20 -3 5 763 21 -3 6 757 22 -3 7 751 23 -3 8 746 24 -3 4
9 739 25 -3
, 10 734 26 -3 11 728 27 -3 12 722 28 -3 13 715 29 -3 14 667 30 -3 15 -3 31 -3 16 -2 1
1
_. )
. t QOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 April 15,1997
SUMMARY
OF OPERATING EXPERIENCE I
- March 1997 The unit began the month at 90% power as part of a gradual planned reduction in power (fuel coastdown),
in preparation for the refueling outage.
Power was slowly reduced to 82% by 03/13/97 at 1800. .
t l On 03/14/97 at 2058 power was reduced to support removing the Main Generator from the grid. The Main ;
l generator was removed from the grid and the Refueling Outage commenced on 03/15/97 at 0016. ;
The reactor coolant system was placed in a reduced inventory status on 03/22/97 at 1125 to support the planned Steam Generator Inspections. On 03/23/97 the unit entered mode 6, refueling with the reactor vessel head detensioned. The reactor coolant system exited the reduced inventory status on 03/23/97 at 2045.
The following significant work was completed or in progress during the month: l t - - Reactor Vessel Refueling.
l
\
- Steam Generator eddy current testing.
The unit was in mode 6 (refueling) for the remainder month.