ML20052E987

From kanterella
Revision as of 16:32, 9 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Repts for Aug 1981
ML20052E987
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/05/1982
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20052E950 List:
References
NUDOCS 8205110596
Download: ML20052E987 (2)


Text

-

s OPERATI.NG DATA REPORT DOCKET NO.52-317 DATE 5/5/82 COMPLETED DY Elaine Lotito TELEPilONE (301) 78./ 5363 OPERATING STATUS

1. Unit Name: Calvert Cliffs #1 _

Notes Revision

2. Reporting Period.

August N

3. Licenwd Thermal Powcr iMW ):
4. Nameplate Rating (Gross Alhe):
5. Design Electrical Raimg (Net Mhe):
6. Maximum Dependable Capacity (Gross Mbe):
7. Maximum Dependabic Capacity (Net MWe): --
8. If Changes Oecur in Capseity Ratings (leems Nurnter 3 Thmugh 7) Since Last Report.Gi e Reasons.
9. Power Leiel To hhich Hestricted. lf Any (Net 4then:
10. Reawns For Restnctions. lf Any:

This Manth Yr..to-Date Cumulatin 4

11. ifours In Reportmg Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown liours
14. Ifoues Generator On.Luie .
15. Unit Resene Shutdown flours '
16. Gross Thermal Energy Generated IMWit) __12.371.965 102.938,757 .
17. Gross Electrical Energy Genersted (MWill _ _ _
18. Net Electrical Energy Generated (MWill _
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capscity Factor (Using MDC Nett --
22. Unit Capacity f actor IUsing DER Neil
23. Unit Forced Outage Rate
24. Shutdowns Schedc!cd 0 cr Nest 6 Months (T3pe. Date.and Duration of Eacht-
25. If Shut Down At End Of Report Period,Fstimated Date of Startup:
26. Units in Test Statui tPrior to Commercial 0pers son t: Forecast Achieved INITIA L CRITIC A LITY .

, INITIAL ELECTRICITY CO'.filERCl4L OPE R.gTION l

8205110596 820505 (9/77)  !

PDR ADOCK 05000317 R PDR

OPERATI.NG DAT A nf PORT DOCKET No.10-318 DATE 3/5/82 COMPl.ETED DY Elaine Lotito TELEPilONE 7301) 787.,5363 OPERATING STAT US

1. Unir Name: Calvert Cliffs #2  %:es ' l<evision
2. Reiurtmg Period: _

August 19%T _

~ -

3. Licensed Thermal!wer t'.lW:). _ _ ___ _
4. Nameplate flatinE tG80>s MWeI: -
5. Desig:t Electriest Ratin;lNet Mbei -
6. Masimum Dependaa'e Capacity (Grms Mbe). --
7. Maximum Dependab!c Capacity (Net Mhe):
8. If Changes Occur in Cap., city Ratings (Irems Norder 3 T hrm.ph 7) Sinse Last Rep.nt. Gs'e Reasons.
9. Powcr Lesel To bhich idestricted,1f Any INet Llha ___. _ __
10. Reasons For Restnctions.lf Any: -

_ _ _ _ = - . . - - - .

This M mth Yr to-Date Cumulative

11. Hours in Reporting Period
12. Number Or llours Reactor Was Critical _
13. Reseter Resene Shutdown Hours
14. Houn Generator On.Line .

IS. Unit Resene Shutdown }inurs *

16. Cross Thermal Energy Generated IMWH1 ____10,225,760 78,977,391 *
17. Gross Electrical Energy Generated IMWH)
18. Ne Electrical Energy Generated (MWHi _
19. Unit Senice Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Usmg \tDC Net t .-. .
22. Ur:: Capacity Factor Using DER Net!
23. Unit Forced Ourage Rate -
24. Shutdowns Scheduled Over Nest 6 Months IT3 pe. Date.and Duras,<>n of Eacht:
25. H Shut Down At End Of Report Permd. Estimated Date cf Startup:
26. Unitiin Test S'atus irrior to Commercial Oper tion Foceent Actsesed INITIA L CRITIC A tlT'r INITI \ L ELECTitiCIT Y COM\lERCl AL OPFR \ TION (9/77)

.