ML20052E999

From kanterella
Revision as of 15:30, 9 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Repts for Oct 1981
ML20052E999
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/05/1982
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20052E950 List:
References
NUDOCS 8205110614
Download: ML20052E999 (2)


Text

-

'b OPERATING ()AT A REPORT DOCKET NO. 50-317 DATE 575/82 COMPLETED B*c En'eLotito TELEPHONE TT6T> 783.-5363 OPE RATING STAT US N"k' I. Unit Name: Calvert Cliffs #1 _ ._ Revision

2. Reportmg Period. October 1981
3. Licensed Thermal Power (Mb.):
4. Nameplate Rating (Gross MWel:
5. Design Electrical Raimit(Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net Mheb --
8. If Changes Occur in capacity Ratings (Items Nurnter 3 Through 7) Since Last Report.Gi e Reasons:
9. Poact Leiel To hhich Hestricted. lf Any (Net 4 thel:
10. Reasons For Restrictiorts. If Any: --

This Month Yr..to Date Cumulative t

II. Hours In Reportir:3Period _ - - -

12. Number Ofliones Reactor Was Critical
13. Reactor Reserve 55urdown Hours
14. Hours Generatoe On Line '_ - - - _ _
15. Unit Resene Shutdown linvrs __
16. Gross Thermal Energy Generated (MWH) __15.669.389 106.236.181 .

I7. Gross Electrical Energy Generated (MWHI _

18. Net Electrical Energy Generated (MWill -
19. Unit Service Factor
20. Ur.at Availability Factor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity factor (Usmg DER Net) _,
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Eacht.
23. If Shut Down At End Of Reptert Period. Estimated Date of Startup:
24. Unit:In Test Status irrior ta Commercial Operstion): Forrcut Achiesed INITIA L CRITICA LITY INITIA L ELECTitlCIT Y COMstERCl%L OPERTTION 8205110614 020505 (9/77)

DR ADOCK 05000317 PDR

OPER A TI.NG DAT A P EPORI DOCKET NO. 50-318 DATE575/82 C05tPLETED BY Elaine Lottto TELEPHONE (301) 787-5363 OPERATING STATUS

1. Unit Name. Calvert Cliffs #2 Nt~ Revision
2. Reporting Period. October 1981
3. Licensed ThermalIwcr d.lW:t
4. Nameplate Rating tGross Stwel:
5. Desiga Electrical Ratin;(Net MWe):
6. Masimum Dependad!c Capacity (Gross MWel.
7. Maximurn Dependab!c Capacity (Net MWe); --
8. If Changes Occur in Capseity Ratings tirems Nunter 31hra;.ph 7) Siate Last Repart.Gi'e Beasons.
9. Power Lesel To hhich Hestricted,if An3 (Net stN): _ _ _ _ . _
10. Reasons For Restnctions. lf Any: __-_ _ _ _

This hi.> nth Y ..to Date Cumuistive

11. Hours In Reporting Period P
12. Number Of Hours Reactor Was Critics 1 _- ._ -
13. Resetor Resene Shutdown Hours _
14. Hours Generstoe On.Line
15. Unit Resene Shutdown linurs '

~

16. Gross Thermal Energy Generated (MWH) __13,531,590 82,283,221 ,
17. Gross Electrical Energy Genersted 1%IWIf)

IS. Net Electrical Energy Generated (Mwill _

19. Urtit Service factor
20. Unit Avsilability Factor
21. Unit Capacity Facter IUsing \lDC Neti
22. Urdt Capacity Factor iUsing DER Net)
23. Urit Forced Outage Rate --
24. Shutdowns Schedu!cd Oscr Nest 6 Months iType. Date.snd Duration of Eacht:
25. H Shut Down At End Of Report PerioJ. Estimated Date of Startup:
26. Unis In Test Status IPrior to Commercial Oper tion 1- Focecast Achiesed INITIA L CRITIC A LITY .

INITIAL ELECTRICITY COMs!ERCl 4L OPERTTION P/77)

.