ML20052F009

From kanterella
Revision as of 15:27, 9 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Repts for Dec 1981
ML20052F009
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/05/1982
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20052E950 List:
References
NUDOCS 8205110626
Download: ML20052F009 (2)


Text

-

e OPERATLNG DATA REPORT 50-317 DDCKETDATE NO. E3/82 COMPLETED BY Elaine Lotito TELEPHONE (301) /61-3363 OPERATING STATUS

1. Unit Name: Calvert Cliffs #1 Notes -Revision
2. Reporting Period, ce er 1981 _
3. Licensed Thermal Power iMW:):
4. Nameplate Rating (Gross MWe):

S. Design Electrical Ratmg (Net MWe):

6. Maxim im Dependable Capacity (Gross MWe)
7. Maximusn Dependabic Capacity (Net MWe):
8. If Changes Oecur in Capacity Ratings tirems Numter 3 Through 7) Since Last Report.Gi e Reasons.
9. Power Lesel To bhich Hestricted. If Any iNet 4 hen:
10. Reasons for Restrictions,if Any: .

8 This Month Yr.-to-Dat e Cumulative

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line , -
15. Unit Resene Shutdown linurs *
16. Cross Thermal Energy Generated iMWH) ___19,352.686 109.919,478

~

17. Gross Electrical Energy Genersted IMWH) -
18. Net E!cetrical Energy Generated (MWlh __
19. Unit Senice Factor
20. Unit Availability Factor
21. Unit Capacity Factor tusing MDC Neti
22. Unit Cepacity f actor L'>ing DER Net!
23. Unit Forced Cutage Rate g4. Shutdowns Scheduled Over Nest 6 Months tT.Spe. Date.and Duration of Each):
25. If Shut Down At End Of Regwort PerioJ. Estimated Date of Startup:
24. Units In lest Status (Prior o Commerci21 Operstion t Forecast Achieted INITIA L CRITIC A LITY .

INITIA L ELECTRICITY CONI \lERCl \ L OPE R ATION 8205110626 820505 PDR ADOCK 05000 top 7)

R

OPER ATlw D

  • T A l'LPORT DOCKET NO.50-318 DATE 5/5/82 COMPl.ETED BY Elaine Lotito TELEPil0NE (301) 787--5363 OPERATING STATUS
1. Unit Name: Calvert_f.11Lfs.12 , , _ _ _ _

Revision

2. Reporting Period. December 1981 3, LicenwJ ThermalI uwer 6.'.lW:t
4. Nameplate Rating (Gross MWe):
5. Design Electriest Raung(Net MWet ___
6. Masirnum DependaWe Capacity IGross Mbek l 7. Maximum Dependable Capacity (Net Mheb
8. If Changes Oecur in Cap.eesty Ratings (items Nurnter 3 lhrn ph 7) Since Last Report.Clie Reasons. .

l

9. Power Lesel To hhich Hestricted,if An) (Net 4tN I- _ _ _ . _ _ . . . _ . -
10. Reasons For Restrictions. lf Any: _

lhis hbnti. Yr .to-Date Curnulative

11. ifours in Reporting Period __

t

12. Number Ofitoun Reactor Was Criticst __ _
13. Rescrer Resene Shutdown ilours __
14. Hours Generator On Lme _
15. Unit Resene Shutdown linun '
16. Gross Therrnal Energy Generated tMWill _ _ 17,292,925 86,044,556 ,
17. Gross Elcetrical Energy Generated l\ twill IS. Ne Electrical Energy Generated (MWHi -
19. Urdt Senice Factor -
20. Unit Availability Factor
25. Unit Capseity Factor IUsing \tDC Nett .-
22. Ur.it Capacity Factor IU>ing DER Net!
23. Unit Forced Outaa Rate
24. Shutdowns Scheduled Oser Nes 6 Months II)pe. Date.and Durstmn of Escht:
25. If Shut Down At End Of Report perioJ. Estimated Date of Startup:
26. Units in Test Status lPrior to Commercial Oper.+tioni Forecast Achieved INITI AL CRITICALITY.

INITIAL ELECTRICITY COMilERCI AL OPI R \ TION _.

l D/77)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - - ._