ML20052F022

From kanterella
Revision as of 16:26, 9 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Repts for Mar 1982
ML20052F022
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/05/1982
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20052E950 List:
References
NUDOCS 8205110641
Download: ML20052F022 (2)


Text

-

OPER ATING D AT A l' EPORT DOCKET NO.10-317 DATE 5/5/82 COMPLETED BY Elaine L6ti to TELEPl10NE (301) 787-5363 OPE RATING STATUS

1. Unit Name: Calvert Cliffs #1 __

Notes Revision

2. Reporting Period: March 1982
3. Licensed Thermal Power IMW:):
4. Nameplate Rating (Gro>s MWel:
5. Design Electrical Raimg(Net MWe):
6. Maximum Dependab'e Capacity (Gross Mhen
7. Manimum Dependable Capacity (Net Mbe):
8. If Changes Oecur in (ap eity Rating > titems Nurder 3 ThrouFh 7) Since Last Report.Gi e Reasons;
9. Power Lese! To which Hestricted.lf Any INet Athet:
10. Reasons For Resenctions. lf Any:

This Month Yr..to Date Cumubtive P

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line , _ _ -
15. Unit Resene Shutdown linurs '
16. Grass Thermal Energy Generated (MWH) 115,633,_153 .
17. Gross Electrical Energy Generated (\lWil) --
18. Net Electrical Energy Generated (MWH) _
19. Urtit Senice Factor
20. Unit Availability Factor
21. Unit Capacity Fac or IUsing \lDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Ourage Rate
24. Shutdowns Scheduled Over Nest 6 Months (T3pe. Date,and Duration of Eacht-
25. If Shut Down At End Of Report Period, f.stimated Date of Startup:
26. Unit:In Test Statua lPrio. to Commercial Oper. tioni Forecast Achkied lisITIA L CRITIC A LITY INITIA L ELECTitl CITY COMstERCI4L OPI R n TION 8205110641 820505 PDR ADOCK 05000317 ggf77)

R PDR N -

.. o OPERATI.iG D*T A lifPORT DOCKET NO.50-318 DATE 575/82 COMPl.ETED BY Elaine Lotito TELEPl!ONE (301) 781,5363 OPERATING STATUS

1. Unit Name-a s #2 Mn R M sion
2. Reportmg Period. March 1982
3. Licensed ThermalIwer t?.ths). - _ _ . . _
4. Nameplate Rating (Grou Mhe): -
5. Design Electrical Raim; tNet Mhei-
6. Maximum Dependad!c Capacity IGross Mhel.
7. Maximum Dependable Capacity (Net Mbe).
8. If Changes Occur in Capacity Ratings litems Nont er 31hrough 7) Since Last Report.Gi'e Reasons.
9. Power Lesel To hhich Hestricted,if Any INet tfh.:1: _ _ _ _ ..
10. Reasons for Restrictients.lf Any: --. -

This M.inth Yr .to.Date Cumulative

11. Ilours in Reporting Period -
12. Number Of flours Reactor %s Crivital -
13. Reactor Resene Shutdown Hours
14. ilours Generater On Lme _
15. Unit Resene Shutdown linvrs '
16. Gross Thermal Energy Generated (MWill

_90.891 468 .

17. Gross Electrical Energy Generated IMWill . _-

1S. Ne: Electrical Energy Generated (MwHi -

19. Unit Senice Factor
20. Unit Avsitability factor
21. Unit Capacity Factor IUsing MDC Nets _ _ .
22. Ur::: Capacity factor (Using DER Net) l 23. Ur:lt Forced Outage Rate
24. Shutdowns Schedu!cd (ner Nest 6 Months II3pe. Date.snd Duration of Eacht-
25. IlShut Down At End Of Report Pem.J. Estimated Date of Startup:
26. Unit: In Test Status (P >:.,r io Commercial Operstioni Focecast Achiesed INITIA L CRITICA LITY . --

INITi A L ELECTRICITY COM%IERCI \ L OPIR ATION O/77)

.