Similar Documents at Surry |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr ML18153A3421999-03-26026 March 1999 Provides Updated Medical Status Rept for Wb Gross in Accordance with License SOP-20476-02,Docket 55-5228,as Amended by 980320 License Amend.Informs That Gross Exhibits No Performance Problems & Will Continue on Current Medicine ML20204H0331999-03-17017 March 1999 Forwards Rev 5 to PSP for Surry & North Anna Power Stations & Associated Isfsis.Description & Justification for Changes Included with Plan Rev.Rev 5 to PSP Withheld Per 10CFR73.21 ML18153A3411999-03-15015 March 1999 Forwards Signed Applications & Medical Certificates for Initial License at Surry Power Station Units 1 & 2 for Listed Individuals.Without Encls 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML18153C3661990-09-20020 September 1990 Forwards Topical Rept VEP-NE-3-A, Qualification of WRB-1 CHF Correlation in VEPCO Cobra Code. ML18153C3701990-09-18018 September 1990 Forwards Addl Info Re Facility Containment Isolation Valve Type C Test,Per 900914 10CFR50,App J Exemption Request ML18152A2341990-09-14014 September 1990 Requests Exemption from 10CFR50,App J Section III.D.3 Re Local Leak Rate Testing During Every Reactor Shutdown. Basis & Justification for Exemption Encl ML20059J3341990-09-13013 September 1990 Forwards Rev 15 to Nuclear Security Personnel Training & Qualification Plan.Rev Withheld ML18151A2901990-08-31031 August 1990 Forwards Rev 10 to Updated FSAR for Surry Power Station Units 1 & 2,representing Second Updated FSAR Submitted This Yr ML18153C3451990-08-29029 August 1990 Forwards Proprietary Semiannual Fitness for Duty Program Performance Data Rept for 900103-0630.Rept Includes Summaries of Mgt Sanctions Imposed,Actions Taken to Correct Program Weaknesses & Events Reported to Nrc.Encl Withheld ML18153C3381990-08-22022 August 1990 Responds to NRC 900723 Ltr Re Violations Noted in Insp Rept 50-280/90-21 & 50-281/90-21.Corrective actions:as-found-as- Left Conditions of Auxiliary Feedwater Evaluated & Found Operable ML18153C3391990-08-22022 August 1990 Requests Approval for Use of Plugs Fabricated of nickel- chromium-iron Uns N-06690 Matl (Alloy 690) to Plug Tubes in Steam Generators for Mechanical & Welded Applications ML18153C3161990-08-0101 August 1990 Provides Supplemental Response to NRC 900629 Ltr Re Electrical Crossties,Load Shedding on Nonblackout Unit & Emergency Diesel Generator Reliability.Emergency Diesel Generator Reliability Program in Place,Per Reg Guide 1.155 ML18153C3171990-08-0101 August 1990 Resubmits Synopsis of Changes to Updated Operational QA Program Topical Rept Vep 1-5A ML18153C3091990-07-30030 July 1990 Provides Outline of Plan to Meet 10CFR50 App G Requirements, for Low Upper Shelf Energy Matls,Per NRC 900521 Request ML18153C3061990-07-30030 July 1990 Forwards Revised Tech Spec Pages,Addressing Constitution of Quorum & Timeliness of Mgt Safety Review Committe Meeting Minutes,Per NRC Request ML18153C3051990-07-26026 July 1990 Advises That Util Submitted Decommissioning Funding Plan & Financial Assurance Info W/Isfsi License Application ML18153C3041990-07-26026 July 1990 Responds to NRC 900626 Ltr Re Violations Noted in Insp Rept 50-281/90-20.Corrective Actions:Leaking Drain Plug & Upper Drain Plug on Motor Replaced W/Oil Drain Assemblies Composed of Piping & Valves ML18153C3031990-07-26026 July 1990 Advises of Withdrawal of Request for NRC Review & Approval of Engineering Evaluation 8.Revised Evaluation Will Be Maintained Onsite for NRC Audit During Future Insps,Per Generic Ltr 86-10 ML18153C3101990-07-26026 July 1990 Forwards Decommissioning Financial Assurance Certification Rept..., Nuclear Decommissioning Trust Agreement & Nonqualified Nuclear Decommissioning Trust Amended & Restated Trust Agreement, Per 10CFR50.75 ML18153C2901990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Listed Transmitters Compiled.Transmitters Found Installed within Reactor Protection or ESFAS Have Been Replaced ML18153C2861990-07-12012 July 1990 Requests Cancellation of Operator Licenses for Listed Individuals.Licenses No Longer Required ML18153C2871990-07-11011 July 1990 Responds to Violations Noted in Insp Repts 50-280/90-18 & 50-281/90-18.Corrective Actions:Permanent Drain Line Installed & Matrix Which Describes Proper Ventilation Alignment for Plant Conditions Provided for Personnel Use ML18153C2851990-07-0606 July 1990 Forwards Response to Generic Ltr 90-04 Re Status of Generic Safety Issues ML18153C2831990-07-0303 July 1990 Advises That MW Hotchkiss No Longer Needs Operator License SOP-20548-1.Cancellation of License Requested ML18153C2821990-07-0303 July 1990 Requests Exemption from 10CFR50,App J,Paragraph III.A.6(b), Which Requires That When Two Consecutive Periodic Type a Tests Fail to Meet Applicable Acceptance Criteria Type a Test Shall Be Performed at Plant ML18153C3591990-06-28028 June 1990 Responds to SALP Repts 50-280/90-16 & 50-281/90-16 for Period 890701-900331.Corrective Actions Focus on Issues of Maint Backlog,Maint planning,post-maint Testing,Staffing & Procurement ML18153C2611990-06-21021 June 1990 Responds to NRC 900522 Ltr Re Violations Noted in Insp Repts 50-280/90-07 & 50-281/90-07.Corrective actions:as-built Configurations of 120-volt Ac & Dc Vital & Semivital Panel Breaker Installations Verified to Be Acceptable ML18153C2581990-06-18018 June 1990 Forwards Reissued Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989. Rept Contains Info Re SR-89,Sr-90 & Fe-55 Analytical Results for Liquid Composite Samples ML18153C2591990-06-18018 June 1990 Forwards Response to NRC 900524 Request for Addl Info Re NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Engineering Will Initiate Study to Evaluate Enhancements of Cooldown & Possible Heatup Operation ML18153C2541990-06-15015 June 1990 Forwards Corrected Tech Specs Page 3.1-3,per Identification of Typo in 900522 Application for Amends to Licenses DPR-32 & DPR-37 ML18153C2521990-06-14014 June 1990 Responds to NRC 900515 Ltr Re Violations Noted in Insp Repts 50-280/90-09 & 50-281/90-09.Corrective Actions:Abnormal Procedures & Fire Contingency Action Procedures Being Upgraded Via Technical Procedure Upgrade Program ML18153C2501990-06-0808 June 1990 Confirms That Primary Policy Re Onsite Property Damage Insurance,Provided by Nuclear Mutual Limited ML18153C2361990-05-29029 May 1990 Responds to NRC 900427 Ltr Re Violations Noted in Insp Repts 50-280/90-14 & 50-281/90-14.Corrective Actions:Personnel Involved Counseled as to Importance of Properly Recording & Reporting Surveillance Data ML18153C1971990-04-24024 April 1990 Responds to Unresolved Items Noted in Insp Repts 50-338/89-12,50-339/89-12,50-280/88-19 & 50-281/88-19 Re Secondary Sys Containment Leakage & Concludes Leakage Need Not Be Quantified & Not Included in as-found Leakage ML18153C1961990-04-20020 April 1990 Forwards Facility Previous Tests & Projected Leakage Totals for Type C Testing for Valves & Penetrations,Per 900108 Ltr ML18153C1901990-04-18018 April 1990 Requests That Operator License OP-20447-1 for Ja Yourish Be Cancelled ML18153C1861990-04-0505 April 1990 Requests Exemption from 10CFR50,App J,Paragraph III.A.6(b). Util Implemented Corrective Action Program Which Meets Intent of Regulation in Establishing Containment Integrity ML18153C1671990-03-30030 March 1990 Submits Supplemental Response to 10CFR50.63, Loss of All AC Power. Understands That Load Mgt Schemes for Both Blackout & Nonblackout Units Allowed by Station Blackout Rule ML18151A2551990-03-30030 March 1990 Forwards Rev to, Corporate Emergency Response Plan & Rev to, Corporate Plan Implementing Procedures. ML18151A4941990-03-29029 March 1990 Forwards Listed Info Re Licensee Guarantees of Payment of Deferred Premiums,Per 10CFR140.21(e) ML18153C1631990-03-27027 March 1990 Responds to Violations Noted in Insp Repts 50-280/86-05 & 50-281/86-05.Corrective Action:Surveillance Tests Being Performed in Accordance W/Administrative Requirements of Station Procedures & Plans Implementing New Review Process ML18153C1551990-03-20020 March 1990 Clarifies 900108 Request for Exemption from 10CFR50,App J Re Type C Testing Requirements ML18153C1511990-03-19019 March 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47. Operability & Surveillance Requirements for Steam Generator Overfill Protection Sys Will Be Incorporated in Tech Spec Change ML18153C1661990-03-16016 March 1990 Discusses Waiver of Compliance Re Containment Vacuum Sys Operability,Per 900315 & 16 Telcons ML18153C1471990-03-14014 March 1990 Discusses Functional Test for High Setpoint for PORVs ML18153C1571990-03-12012 March 1990 Forwards List of Emergency Operating Procedures in Preparation for 900402-12 Insp.Vol I Is Emergency Operating Procedure Set & Consists of 47 Notebooks.Vol II Contains Fire Contingency Action (App R) Procedures ML18153C1371990-03-0808 March 1990 Forwards Suppl to 1986 Inservice Insp Summary Rept,Adding Two Missing NIS-2 Forms Containing Info Re Replacement of Bolting Matl on 1-RC-SV-1551C (Flange a) & 1-RC-HCV-1556A ML18153C1281990-03-0101 March 1990 Submits 1989 Annual Steam Generator Inservice Insp Rept Results.No Steam Generator Tubes Plugged in 1989 ML18153C1261990-03-0101 March 1990 Responds to Generic Ltr 90-01 Re NRC Regulatory Impact Survey.Survey Covers Type of Insp,Audit or Evaluation by NRC Resident,Nrc Regional Ofc,Nrc Teams & INPO ML18153C1231990-02-22022 February 1990 Responds to NRC 900123 Ltr Re Violations Noted in Insp Repts 50-280/89-32 & 50-281/89-32.Corrective Actions:Use of Lab Hood Attached to F-2 Fan Suction Prohibited & Contaminated & Radioactive Items Removed from Hood ML18152A4881990-02-0606 February 1990 Responds to NRC 891222 Ltr Re Violations Noted in Insp Repts 50-280/89-34 & 50-281/89-34 on 891029-1125.Corrective Actions:Steps in Operating Procedure 2-OP-1.3 Associated W/ Valve Test Being Evaluated for Inclusion in OP-7.1.1 ML18153C0991990-02-0101 February 1990 Withdraws 891018 Application for Amends to Licenses DPR-32 & DPR-37,increasing Pressurizer Safety Valve Setpoint Tolerance to +/- 3% of Nomical Lift Setpoint.Emergency Tech Spec Change Granted on 891116 Provided Modified Tolerances ML18153C0951990-01-29029 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Belief in Appropriateness to Address Generic Ltr 89-13 Concerns within Context of Established Programmatic Improvements Noted 1990-09-20
[Table view] |
Text
e VIRGINIA ELECTRIC AND POWER COMPANY RICHM.OND,VI;JlGINIA 23261 October 10, 1980 Mr. M. R. Beebe Serial No. 829 U. S. Nuclear Regulatory Commission NO/RMT:ms Office of Management and Program Analysis .Docket Nos. 50-280 Licensee Operations Evaluation Branch 50-281 Washington, D. C. 20555 License Nos. DPR-32 DPR-37
Dear.Mr. Beebe:
We are forwarding the enclosed draft copies of summary data sheets which you sent for our comment and review. The recommended changes are shown marked on the sheets and presented in summation on the attached Table.of Changes.
Very truly yours,
- 4L B. R. Sylvia Manager - Nuclear Operations and Maintenance Enclosures cc: Mr. R. A. Hartfield, Chief Licensee Operations Evaluation Branch Office of Management and Program Analysis p
Attachment Page 1 TABLE OF CHANGES Page Title Quarter Change Effluent and Waste Disposal - Supp. N/A MPC: N/R.
Total Rad. : N/R Effluent and Waste Disposal - Supp. 1 & 2 Avg. Energy: Beta - N/R Gamma - N/R 1 & 2 A. 1-6:
B. 2-5:
A.
N/R N/R N/R e
B. N/R Effluent and Waste Disposal - Supp. 3 & 4 Avg. Energy: Beta - N/R Gamma - N/R A. 1-6: N/R B. 2-5: N/R A. N/R B. N/R Gaseous Effluents 3 B.3: Delete 1.4.ZE-04 and enter 4.26E-04 4 B.3: Delete 5.94E-03 and enter 1.78E-02 3 C.3: Delete 2.36E-02 and enter 7.08E-02 4 C.J: Delete 7.90E-04 and enter 2.37E-03*
Liquid Effluents 2 I-131: Delete 2.50E-02 and enter 2.54E-02 4 NA-24: Delete 2.68E-Ol and enter 2.64E-Ol Liquid Effluents - Summation 1 E. Delete 1.39E08 and enter 1.27E08 Liquid Effluents Summation 3 A.2: Delete 8.47E~IO and enter 8.48E-10
____ INSTALLATION -~R~----- LOCATION 19 MT NW NEWPORT NEWS EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT FOR YEAR 1978
_,,.J.
LI '
*---sWP1:t"ITT'.N'f:AL I N F O P M ~ -----------------------
UNIT NUMBER - LICENSEE vrITTffN"tA E[ECTPfe1J>nwrn-
... -----.o=o ci<E"r 1,Hr-;-s TYPE PWR 0-2 Ao COOLING WATER SOURCE JAMES RIVER LICENSED POWER (MWT)
- *-Tr~Tn*,.-c--c~nrc~cnr-ir7ToT712 _________ _
?441.0
,.umN'f T NUMBER. :;> A-,E....L'""E..,..CTRI"C;'"'K~crw I ...
---*------..,......*~c""'E..,_N'"S.,.E...E-rv"t.,..R"'G"'l'ITIN....
---~D'""'PcKErNO-;-sn..:2,n LICENSED POWER (MWT)
INHTAL-C-RTtlCALI1Y03To7i73 ....
?441.0 COOLING WATER SOURCE JAMES RIVER
- MA)!IMUM PERMJc;SI8LE CONCENTRATIONS (MICROCURIES/ML) /II/ K *-*---------
- _ _ _ _M_EA$UREMENTS AND APPROXIMATIONS OF TOTAL RADIOACTIVITY!!-/-~------------
N/A=NoT APPC!CARLE N/D=NoT DETECTFn
,,N~/R=N oTR[P O"R 'rfn
_ _ _.:::.I_N--S_TA'""L"'L=-A_T:. . :I: . _O_N_ __,c;_U_R_R_Y_ _ _ _ _ _ _ _ _ _ _ _L_O_C_A_T_ION 19 MI NW NEWPORT NE_W.:::.S_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
fFFLUENT AND WASTE DISPOSAL SEMIAMNUAL REPORT FOR YEAR 1978 SUPPLEMENTAL INFORMATION AVERAGE ENERGY CMEV/DISINTEGRATION) ,,-
RETA GAMMA QUARTER QUARTER QUARTER QUARTER 1 2 1 ? r N//L /V /fl- N//2-BATCH RElEASfc:; QUARTER QUARTER t"1 A1 LIQUID 1 I: 2 I.NUMBER oF BATCH RElEAsEs-2.TOTAL TIME PERIOD FOR BATCH RELEASE(MINl-
'3:..:.:.,,:M:....:A--X~lMUM f!ME PERIOD FOR A BATCH RELEASE CMINl-4.AVERAGf TIME PERIOD FOR AATCH RELEASESCMINl-
5:....:.'--M-l~NWtJl,1fTf*lEPERIOD FOR A BATCH RELEASECMIN>----------'
6.AVERAGE STREAM FLOW DURING PERIODS OF RELEASE
-~~~~~;...:...,O~F-"tl~rFLuENT INTO A F[oWING STREAMilT57Wr'"N~,-~~~~.
t!_}__fl_ ---- f!:l
..... ~:
0
~UMfff~ OF BATCH RE[EASES-
_ _ _ _ _ _2_._T_OTAL TIME PERIOD FOR BATCH RELEASES (MIN)- N //2..
3.MAXLMffi.fl"nrE""flERTOU-FoR A -e~A~T~c~H~R~EL~E~A~s~E~<M~I~N-,---------~Lc:=------------------------------~ ('
4 AVERAGf TIME PERIOD FOR BATCH RELEASESCMINl-0 5.MINIMOM PERIOD FOR A BATCH RELEASEiMINI-NOR AL ELF:AS S A.LIQUID
'--'-"--N:....:U:..::._MBER"""OFP~E~[-E~A=s-E=s---------------------P- tv-/-~-------------------------
- 2. TOTAL ACTIVITY RELEASED (CURIES) s.GAstoos
_ _ _ _ ___..;l::.._*~N_UMBER oF RELEASES 2.TOTAL ACTIVITY RE[EASED (CURIES) N /1;=-------------------
r.
, I
~
~
N/A=NoT A ~ q
..;; N/D=NoT DETECTfn N/R=NoT REPORTFn
_ _ _I_N_S_T~ALLATION SURRY LOCATION 19 Mt NW NEWPORT NEWS FFFLUENT ANO WASTE DISPOSAL SEMIANNUAL REPORT FOR YEAR 1978 SUPPLEMENTAL INFORMATION AVERAGE ENERGY (MEV/DISINTEGRATIONI BETA GAMMA QUARTER QUARTER QUARTER QUARTER 3 4 3 4 f'J/R. u/~
QUARfE=R-----------------------------
BATCH RELEASFC: QUARTER A1 LIQUID 3 ::1: 4 I.NUMBER oF BATCH RELEASES-2.TOTAL TIME PERIOD FOR BATCH RELEASE!MINl-3.MAXIMUM TIME PERIOD FOR A BATCH RELEAs-E~(M~I~N~l---------------------------------------
4.AVERAGF TIME PERIOD FOR BATCH RELEASESCMINl-
~5~.~M~I-NlMUM T~ERIOD FOR A s*ATCH RELE'.-AsFrMIN)-
6.AVERAGF STREAM FLOW DURING PERIODS OF RELEASE OF EFFLUENT INTO A FLOW ING STREAM< LTS/M IN 1-
'~ B GASEOUS 0
- - - - - = NUM-BE1roFlrATCH RE[EASES-
- 2. TOTAL TJME PERIOD FOR BATCH RELEASESCMIN)- lv.. ID 3.MAXIMUM TIME PERIOD FOR A BATCH RELEA*sE"-,,(M[TI..,N"'I,--------- - ' - { - L ' > ~ - - - - - - - - - - -
4.AVERAGE TIME PERIOD FOR BATCH RELEASES(MINl-5.MJNIMUM PERI00 FOR A BATCA R E L E A S E I M I - , ; r r = - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - ~
- ABNoRMA[ RELFASES A* LI QUID L!_}J " - - - - - - - - - - - -
90 u=MB'"E-.R~O""Fc-,,;R...-EL....,E.....A...,S"".E " " " s . - - - - - - - - - - - - - - - - - - - - - - -
?.. TOTAL ACTIVITY RELEASED (CURIES)
GASE00S r, I.NUMBER OF RELEASES .1}
2~.-TOill"LACTTVTT=v-..-R-ELr,E...-A~S~E~D~(~C~a-R~I-E~S~)--------------fY.-f*-'---'~------------~
j --
N)A-NQT APPLY A
.i N/D=NoT DETECT~O
,-Nr-c/R=N*orREP"ffRTF.:O - - - - - - - - - - - - - - - - - - - -
- - * - - INsTALLATION=c;I.IRRY ----**-******-*----**-***-***------*-**-*---**---*-******--***-- *****
__ EFFLUENT AND WASTE DISPOSAL SF.MI ANNUAL REPORT _l 97A - - * - - - * - - - -----*----*---***---
, L, GASEOUS EFFLUENTS-SU~MATION OF ALL RE_L~~?ES *---- . ****---- *-*--*-**** *---------**-------*---** .....,.. ____ _
lJ_~_!_T____(}_U~~TEP _ QUARTER EST. TOTAL ______________________________ ,...
l ?. ERROR,%
_ _ _ _A_. fISSION AN~ ACTIVATION G A S _ E _ S - - - - - - - - - - - - - - - - - - ~ ~ - - - - - - ~ * - - - - - - - - - - - - - - - - ~
_ _ _ _ _ .l
2.AVERAGE RfLEASE RATE FOR PERioD**-----------ucf,sEC ________ - - - ------ - - -
~3.PERCENT oF TECHNICAL SPECIFICATION LIMIT % l.77E-Ol* 3.71E-~O~l_*_ _ _ _ _ _ _ _ __
B. IOIH"'!_ES 1.TOTAL IODINE-131
2~.~A~V~f=.~R~A~G=Ec"-"-p=E~L=E~AS~.E~R~A~T~E~F~o=Rc---P=E=R=I-o=D------u~C~I~,sEC
_ _ _ _ _ _.J~~CENT oF TECHNICAL SPECIFICATION Lil.1IT _ _%
.C. pARTICULATl:S CI 2. 8AE-04,
_ _ _ _6_._4_4~_!1_.~*
- 5. 9 3 E - 0 2 = - - * - - - - - - - - - - - - - - - - - - - - - -
- 2. 22E-o l
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
--- ~
}*PARTICULATES WITH HALF-LIVES> 8 DAYS CI 3.6QE-O~* 3.0JE-04*
z.AvERAGE pf[EAsr-~oR PERIOD ----~u~C,....I7SEC *-=-~-----------------------*
3.PERCENT oF TECHNICAL SPECIFICATION LIMIT 'I\ s.74E-04* I.23E-03*
4~.~G~R~O~S~ADIOACTIVITY y-*--2.:HE-06* l.4c;~*-.---------------------------
(1
}*TOTAL RFLEASE CI 2.AVERAGE RELEASE ~ATE FOR PERIOD UCI/SEC
~3~..... P.rRCENTl)F"-rEcANICAL SPECIFICATION LIMIT 'l\.
*---~-----------------------*----------- '*,)
r,)
N7A:NOT Al'llltcAALE N/o:NOT DETEr.TEO ---*------*--------------------*----*----*-*-----***--*----
-- ~IR=NOT ~EPOPTED - -
I I
~ ---------IN_sTALLAT ION:<;UPPY _________________________ ------- ------------------------------------------ ------------------------* ------------------- ------------ ------ ---- -*--* -*--*--~*-*
EFFLUENT ANO WASTE DISPOSAL SEMIANNUAL REPORT 1978
---****---------~ --~-**---*-*----*--*--**-----r*--*--*-----------------
___ --------------- GASEOUS_ EFFLUENTS-SUMMATION __ OF_ ALL __ REL~~SES __ ___ __ ---------------------- ___ ----------------------------- _________________ _
UNIT QUARTER QUARTER EST. TOTAL
---r* 4 - - -ERPORo'li___ -
18:l _______ l
- TOTAL PF.LEASE______ CI 2.34E 02* 1 o66E 03,:_*_______
2.AVE:RAGE PELEASE_ RATE FOR PERIOD ---UCI/SEi: ----- - .
_ _ _ _ __,3._PERCENT OF TECHNICAL "?PECIFICATION L~-~-!l_---~ I .92E-02* 3 58E-QJc...*_ __
0
_ _ _ _B~*~JODI_Nf~
_ _ _ _ ___..TOTAL IonINE-13~1'----,_ _ _ _ _ _ _ _ _ _ _ _ _ _~CI 2.AVERAGE PELEASE RATE FOR PERIOD
~3.PERCENT _9F TEC~_ICAL SPECIFICATION LIMIT C. pARTICULATE"S UCI/SEC
- 3. 93E-os.
lo42E-ft4 4.'l."c-o 1. 74E,_--"o--=3c..*--------- _____________
§.94E 83
,. 18 e-02.
1.PARTICULATES WITH HALF-LIVES> 8 DAYS CI 2o96E-03, 2ol3E-04*
~VERAGE p!:[EASE RATE'" FOR PERIOD -----0-c-1,sn:'--7-.o-BE-02. 2., !37/Z-03 3.PERCENT oF TECHNICAL SPECIFICATION LIMIT ~ 2.J~E-Q2 ~.9eE 8 : ~ 4 - - - - - - - - - - - - - - - - - - - - - - ~ - - - -
"'4'-".~G~A[pHA RADIOACTIVITY CI 3.6~.;;;o;-.-g~sr-,o ,
1*
I 1.TOTAL RF:LEASE cr--s-;n--r-o 1* 2. 3 r;ro 1,
=2-*_AVERAGE PELEASE RATE FOR PERIOD UCI/SEC 3.P~ToF"!E"CflNIC.IIL SPECIFICATION LIMIT ,,;-**---
N/A:Ndf APP[JC::A
,...j N/Q:NOT DETECTED ----------- ---
111/R:N""°OT-REPOPTED
_____I~N~S~T_A_L_L_A_TION:SU_R_R_Y_________________
EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPOPT 1978
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _GAS EFFLUENTS GROUN_D____RELEAS_E_ _ _ _ _ __
CONTINUOUS MODE BATCH MOD.~E__,~~ I'."-~
NucLIDES RELEASED UNIT QUARTER QUARTER QUARTER QUARTER 1 2 1 2
("',
FIS5 ION GASES.'....--------..,.---....,,....-.,,.,..,---=.---~--=-.=.=--=..----------------------------------- _ __
~A~R-41 . Cl 6.SOE-01* 4.45E-03*
KR-85 KR-B~M CI CI 7.07E-Ol*
- 3. 87E-o
3 .1 --04*
KR-87 CI 3.9SE-02*
KR-AA XE-133 XE-133M XE-135 CI CI Cl CI t .21E-02*
7.SlE 02*
1.21E 00*
1.42E 01*
l.63E 03*
1.19E Ol*
2.16E 01*
e
,*i:~
IODINES 1-131 CI i .69E-04* s.92E-02* ,.J I-132 CI lo 04E-06* 2. 93E-04*
1-133 CI 4.69E-06* l .6AE-04*
1-135 CI 1.78E-07*
PARTICULATES co-5fl er 4.64E-05* I. 14E-04*
co-60 CI 7.71E-05' l.21E-04*
cs-134 CI 2.14E-05* 2. ?8E-06*
cs-137 Cl 3.58E-06* 1. 91E-05*
cs-138 Cl 5.43E-03* 5.13E-06*
MN-54 Cl 3.35E-06* 2 .49E-06*
RB-88 ct N1A=NOT APPLtCAB[E
.; N1o=NOT DF.TFCTED N1R=N-OT REPORTED*------------
- fFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT 1978
- GAS EFFLUENTS GROUND_ _ _R_ELE:...:A.:::.S:::.E_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
CONTINUOUS MOOE BATCH MODE
- NucLIDES RELFASEO UNIT QUARTER 3
QUARTER 4
QUARTEP 3
QUARTER 4
FIS5_10N GASES AR-41 Cl 1.26E 00* s. OJE-01*
KR-85 CI 2.27E-Ol*
- KR-BSM KR-1'17 KR-BA CI Cl CI
- 9. 72E-o2*
5 .S4E-OJ*
B.lAE-01*
5 .29E-O l*
9.23E-o l*:._____
- XE-133 XE-133M XE-135 CI Cl CI 6.76E 0 l*
3.90E-o6*
4.73E 00, l.62E 03*
7.Sf,E 00*
2.0lE 0 l*
- I-132 I-13.3 I-134 CI Cl Cl 1.s1E-o6*
8.47E-OS, 4.0~-05*
4.42E-06*
- C0-58 CO-f>O cs-134 Cl Cl CI S.27E-03*
9.83£-04*
2.98E-06*
a.9oE-os*
s.94E-os*
l .63E-07*
- 2. 09E-05*
3.SlE-04*
2.47E-05*
6.98t-06,
- 1. B2E-02*
2.'HE-05'
- RB-88 CI 1. 09E-05* 6 .69E-03*
- N1A=NOT APPLJCAR[E N1o=NOT DFT~cTEO
NtR=MOT REPnoTE~D---
~ _______ INsTALLATIO"'l=SlJRRY -***-***----------*---**-------**----*--------*-*-------**--**--**---**--*---*--**----*-. *--------*-****** **- **------------*-*-*** -------------***** *-* ***--------
__FFFLUENT_ANO WASTE DISPOSAL SEMIANNUAL REPORT 1978
~ ------- - - - - - - - - - - - - *LIQUID EFFLUENTS
-*- -**- -------------- - - - * * - - - ---*--- ----------------------,------- *-- ------------***-. ---*-----*-- - . *---*-*-*******----- .* 1 !
CONTINUOUS MOOE BATCH MOOE
~ NuclIDES RE~D--------* uNlT -QUARTER _________ QUAR~T=E=Rc----~Q-U-AR_T_ER. - QU.!\RTER *-*--***--*---- *-- --*--- - - - - -
1 2 1 ?
~ _ _ _ _ AR-41 CI 4. 74E-05* 6.45E-04* ------------
BA-LA-140 CI 2.69E-03* 2.48E-05*
~ ----~g~:i:;~---------g*~~----=2:..::*..c:.5_7E-04* t;~~=~::---------------------------- -------- ,,...,
'C.9_-:.S7 CI l .95E-03* l .30E-03*
co-58 Cl 2.42E-Ol* 6.15E-Ol*
~ ----~C0-60 CI 2.45E-Ol* 4.25E-Ol,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
CR-51 CI 7.54E-02* 3.0lE-01*
~S.::)34 CI 5.71E-02* 4.03E-02*----*-------**-----
~ cs-l36 c1 1.44E-03, *-----
_ _ _ _ _c=s-137 CI 1. l 9E-O l* 9. 4:::.8.::.E_-.::.0:;;.2;;._*- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - * - - - - -
cs-138 ct 1.BaE-02,
~ C-14 CI 4.88E-03* l .B2E-03*
~FE::59 cI I. n*r-03,--1-. 22t-03-.---
I-l 3 l CI 3
- 59 E 02 2 , 5 " 4 . . : . . £ _ - o _ : 2 . = - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
~ -----i"-132 Cl 4.31E-02* 7.46t-°"0_4_*-
- I-133 Cl 4.49E-02* s.o7E-03_*_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
I- 34 CI 4.~r~-----
~ ----~I~--135 CI 5.27E-02* 5ol6E-04*
MN-54 CI l.46E-o~~65E---o~2~.------
NA-24 Cl s.92E-Ol* 1.s"!E-03*
~ NB-95 CI 7. 35E=<fY.---?-;-41l~~
RB-!lfl CI 3.46E-03' sR-89 Cl 2.60E-04*
~ SR-90 CI 4o46E-04* 2.38E-05*
~.xE-133 CI 6.09E-Ol* 9. 81 E-o 1*
~
~
~
xE-135 CI 8.91E-02* 4 0 98E-02_*_ __
, .... ~
~
~ l ....
*------*** --------------------- 'I ***
N1A=NOT APP[TC11'~
N1o=NOT DET~cTED 'L.,.
- N1R=NOT REPoPfEO--_ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ---------------------------------- ------* - ----- ---
~. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ' - - - - - - - - - - - - - - - - - - - - - - - - -~
_____ I,.,_,N5TALLATION=.~S~U~R_R~Y---------------------~-~--------~
EFFLUENT ANO WASTE DISPOSAL SEMIANNUAL REPORT 1978 LI QlJ ID EFFLUENTS CONTI NlJOUS MODE NucLIDES RELEASED UNIT QUARTER QUARTER 3 4 I AR-41 CI 2.06E-04* l.82E-02'
~
BA-LA-140 CI 3.44E-05° 2~..:-os**--------------
CE-141 CI 3. 04E-06* ~
CE-144 CI 2. 79E-04* 4. 07E-04*
_ _ _ _ _ co-s 1,_ _ _ _ _ _ _ _ ___,,c..,,,1_ __.....;;.6. 62E-o4, ". S3E-o4, __
co-5R Cl 7.62E-Ol* s.57E-Ol* ,ii co-60 CI 5.62E-ol* 4.fr6E-Ol 0
cR-51 ct 4.50r f.os*E-o~-
cs-134 Cl 2.66E-Ol* 2.67E-Ol* <ll
=fs-136 CI --- 9. 41Jr-03-.- - -
cs-137 Cl 5.43E-ol* 6.21E-0I* I c-14 CI 1.91E-03* 4.lOE-o
- FE-59 CI 4.44E-04* 6.SAE-04* ~
~1*-131 CI 2.06E-03* 7;7*9E:;oi*
I-132 1-133 c1 CI 8.63E-03*
3.22E=o3* 7.92E-Ol*
s.~~re:--=-~0~1,:___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ ,;
J-134 CI l .lOE-02* 1.20E-Ol*
I-135 Cl 6.~3* 3.42E-lfr, (ij KR-85 CI 6o56E-02* 3.0SE-01*
MN-54 c I 1. 64E-o 2* 1*;1)!Jt-"()3.
NA-?4 Cl 4. 77E-02* f 0 68E 61 2,G.4E:-o/
N'""'s-95 cl 1.09E-03* r.T3r---(f~-- ----
RB-88 CI l.6AE-02*
sR-M ct 4.321:-'0~,- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
xE-133 CI 8.65E-02* A.RSE-01*
~x~S- CI 2.63E-02* 1.90r-OT*------------------------------------
D N1A=ITTiT APPL(CA N1D=NOT DETFCTEO
N"1R=NOT REPOQfE-o_ __
. - - **~-- -------~----* ---*- -*--* .. --* **---------------*- - ------*- *--- ----*- -- -*--- - -* ... ~-- --~~ ---*-***-*-***--**- ______,,_ ---- . -*-* .. **---*- -----* -* ---** . - - ****-- ---- - . -*---.
- - - - INsTALLATION=<;URRY ----------------------------------------- .... -- -- -*------- ****- ---------**---------- *-*- ---** -- - ----------*-* - . --- ---- ***--*-------**- - *----* ---------- ------ - ~ ___ ;: __
' _________ EFFLUENT AND WASTE DISP_OSAL SEMIAN"'IUAL_,.REPORT _l 97A _*-*--**----------------**-----*-------*------..- - - - -
It ----------------------- LIQUID __ EFFLlJENTS-SUMMATION _OF_ ALL_ REL~SES _____________ ----------------------*--------------------------- ---*------
~ ------------------ _LJ~_!__:r: ____________QUARTER QUARTER EST* TOTAL___________________________ . _
1-- ? ERROR,% , ...
~A~"-F.....!15SION AND ACTIVATION PRODUCTS l,TOTAL Rf.LFnSE(NOT INCLUDING TRITIUM,
_ _ _ _ _____;G=..A_SES, ALPHA l * - - - - - - - - - - ----*-=---C=-I___ 7 .!...l_Q_E-0 l
- 44E-O },_________________________ _
2,AVERAGE DILUTED CONCENTRATION
~D_URING PEPI0D UCI/ML _9~3_l~'."!_()*_!._,_:7JE."."..10,:__*_ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - -
30ptRCENT OF APPLICABLE LIMIT % ,,..,
B. RITIUM 1 TOTAL RELF.ASE CI 2.27E 02* l.32E 02*
2 0AVERAGE DILUTED CONCENTRATION
_ _ _ _ ____,D,:..,l;;.,JR_:I;:..,N~G-P...::E'---R.:.I_O_D_~--------------U=--C~I'---/_M_L_ _ 3
3 0pERCENT OF APPLICABLE LIMIT %
- c. 01ssO[VED AND ENTRAINED GASES l 0rOTAL RFLEASE CI l,79E 00, l.14E 00
- 2 0AVERAGE DILUTED CONCENTRATION DURING PEPJOD UCI/ML 2.72E-09* l.67E-09*
3 0pERCENT OF APPLICAALE LIMIT
- o. GROSS ALPHA PADIOACTIVttv
_ _ _ _--=--:l~TOTAL RELFASE CI l .38E-OS* 3o98E-OS~
/, 3q oe, E. VOLUME OF WASTE RELEASED(PRIOR TO DILUTION) LITERS 3,58( 6~ l.27E OA*
F. VOLUME OF DILUTION WATER USED DURING PERIOD LITERS 6,92E 11* 5.77E 11*
- - - ~ - - - - - - - - - - ~ - - - - - - - - - - - - - - - - *'
N/A:NOf APPLJCAR[E
_ _ _ _N_/D:NOT DETECTED NIR=NOT REPORTED ----------- ---------------------------
I >
~- ---------------------------------------------------------
EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT 1978
~
'f'. ---------------"L:..:I:...;.Q_c::Uc.::I:..::Dc___:::Ec:...Fc:...F-=L,-'-U-=E-'N..:..T.=.S-=-SUMM~T ION_ _ Q f ~ ~ ~ L E A S , . = E = . S - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -UNIT - - - " -QUARTER 3 QUARTER 4
EST. T O T A L ~ - - - - - - - - - - - - - - - - - - -
ERROR~% -
A. FzssION AND ~CTIVATION PRODUCTS I.TOTAL RELFASE!NOT INCLUDING TRITIU~,
- *---~G=A.c..;SES,ALPHAI 2
CI 5.3_~~:-0l*
TEF'.D. ----:C:-:O;c.N:..C..E""N"'T.:R:--::A""'T'""Ic:0~111,-----------'-----...:c.8'.::.::,*H !:i-10
_ _ _ _ _. . .cD:c. U: :,. :R-'-'I'--'NG PERT OD UC I /ML 8
l.27E-09.
- 3 pERCENT OF APPLICABLE LIMIT 0
B, TRITIUM
- --~2..-'. AVE RAGE DI L*-u=T=E=D~c=o~N=cE=N=T=-R~A~T=t~O~N---------------C.
DURING PEc:>IOD CI l .62E 02* _ 2.2(,E 02
- UCit._~L__ 2. 76E-07* 3. 7?.E-07* ------ I
- - - - - ~ 3 -pERCEf\JTi:i"F7iP15[TcAl:JI°E LIMIT c.
0 DJ5SOLVED AIIJD ENTRAINED GASES I.TOTAL RELFASE 2,AVERAGt-DILUTED CONCENTRATION CI 1, 9AE-O l* l,43E oo,:___..:.__________________________
DURING PERIOD UCI/ML 2,99E-l O* 2
3 0 pER~6F"APPLICAB[~IMIT %
D, GROSS ALPHA RADIOACTIVI
- I.TOTAL RELF:I\SE E. V.9LUME OF WASTE RELEASF.D!PRIOR TO DILUTION)
CI LITERS 2 0 4AE-05* l .9AE-05*
I.23E OA* l.9SE 08*
F. Vo!,.UME OF DILUTION WATER USED DURING PERIOD LITERS 6.39E 11* S.93E 11*
e N/A:NOT APP[rcAR[E
N~/-'R:NOT N/Q:NOT D ETECrED---------------------------------------------------------
REPORTED I-
______ INSTALLATION=_*- c;UPRY _____ -**--*-----*-*-**---- **--*--*-*---*-**--*-,.*- .... -*-*- *--------*--***------*- - - ***---* ---
i'
- v*
*---- EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT I97R
- - - - - - -*----(JANUARY-JUNE) -*-*- -- -******-*-- -**-* - - - -***-*-----** --- ------*---------
-- - - - - ... - ------ SOLID WASTE -AND IRRADIATED-FUEL SHfPi1Ei-J'f5___ - - ----**-*--- .-
A.souo ~lASTE <:;HIPPED OFFSITE FOR BURIAL OR DISPOSAL (NOT lPR}dITATED FUEL)
_____ 1*.;...T,_'(_.~E OF WA5.J5 _U_Nq _____~-MO~----~].!..!...JQTA_!.____________
PERI Ou ERROR,%
A.spENT RESINc;oFILTER SLUDGES,EVAPORATOR MJ 2.8gE 02*
BOTTOMS,ETC 0 Cl . *3.06l 02* .
BoDRY COMPREc;sIBLE WASTE,CONTAMINATED M3
EQUIPMENT,FTC. CI
._ _c_.~!RRADIATED cOMPONENTS,CONTROL M3 Roos,nc:
3.soLID WASTE OISPOsTflofJ-
~N~u_M_~_E_R_O_F_sHIPMENTS MODE OF TRANSPORTAJION cr-*-*-*---
MJ CI *---------
p ..
~ 30
--- BARNWELL S C
- ---------- 0 0
- - - - - - * - - * - * - - - - - - - - - - - - - - - - - - - - - - - - - *~
NtA=NoT APPLICAALE N/D=NoT DETECTFD *----*------------------- . - -------------------~---*----- --- - - - -
N/R=NoT REPO!f"TEO r
I I
_ _ _c_IN_S_T_,__ALLATION= _ _s~~RY _______ _
- - - - - - - -~------**-----------*-*--- ----c:*'1:~ ~
E~F_;_FLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT 197A.:..__~*---~-------~-----------*
<JULY-DECEMBER!
SOLID WASTE AND IRRAOIATED ruEL SHIPMfiiiTS A.SOLID WASTE <;HJPPEDOFFSITE FOR BUPIAL OR ors?ITT;"AL (NOT IPFfADTAfED FUEL)-------***-----------*----****-------------*********------------------*---- ..,.,
_ _ _ _;:.1;:.*TLY!..P_:E:._.:O;;...F_:.;W.;..;A.;c!S..c.T..:.E_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __:U;;...N_~I:...;T~--:6-=-.,;..MONTH EST* TO_.:....T::.A:=.L_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
PERloU--~RROR,%
_ _ _ _A_.spENT RES_INSoFILTER SLU~_§I_S,EV~PO~~T~_R_ _ _ _~M~3 3. l 4E_ 02 * ---------*----------------- - - - - - - - - - - - - - - - - - - - - - - _____ _
BOTTOMSoETc. CI 2.f>Of.. 02
- _ _ _ _B_.-=D..:..:RY COMPREsc;IRLE WASTE,CONTAMINATED M3 EQUWMEITT*. 1:TC.
CoJRRADIATED COMPONENTS,CONTROL M3 ROS, * ~
D.oTHER(DESCQJ~B:..:E::_c>'.___ _ _ _ _ _ _ _ _ _ _ _ _ _~M:;;3_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~ ,r 3.soLID WASTF. DISPOSITION-NUMBER OF SHIPMENTS MODE OF TRANSPORTATION DESTINATION
_ _ _ _ _ _ _ _ _3..::2_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _B_A_R_NWELL S
' e I =No
_ _ _NID=NoT DETECTF:n_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~
N/R=NoT REPORT~n