ML13304B679

From kanterella
Revision as of 01:37, 6 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards 1980 Annual Rept,Vol 3,Marine Environ Analysis & Interpretation.
ML13304B679
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/22/1981
From: Baskin K
Southern California Edison Co
To: Miraglia F
Office of Nuclear Reactor Regulation
Shared Package
ML13304B680 List:
References
NUDOCS 8107270064
Download: ML13304B679 (2)


Text

REGULATORY 46ORMATION DISTRIBUTION SYS* (RIDS)

ACCESSION NaR:8107270064 DUC.DATE; 81/07/22: NOTARIZED:-NO FACIL50-*r 1 rtBh i,1r la, unlr%c, vc 9 i ctr 50-362 San Onofre Nuclear Station, Unit 3, Southern Californ 05000362 AUTH,NAME AUTHOR AFFItIATION BESKINK.P9 Southern California Edison Co.

RECIP.NAMEi RECIPIENT AFFILIATION MIRAGLIAF. Licensing Branch 3o

SUBJECT:

Forwards "1980.Annual ReptVol 3,Marine Environ Analysis &

Interpretation,"

DISTRIBUTION CODE: C002S COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Environ. Comments.

NOTES:Send all FSAR & ER amends to L Chandler. 05000362 1 cy:J Hanchett (Region V),D Scalettirl cy of all envir info RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME, LTTR ENCL ID CODE/NAME LTTR ENCL ACTION:- ORB #3 BC: 06 7 7 LIC BR #3 BC 06 7 7 COLBURN,T. 05 1 1 ROODH, 05 1 1 INTERNAL: ACCIDNT EVAL 19 1 1 EF TREAT SYS 15 1 1 ENV ENG BR 16 1 1 HYDRO-GEO BR 21 1 1 I&El 13 2 2 NRC PDRi 02 1 1 OELD 1 0 RAD ASSESS BR17 1 1 01N 1 1 SIT ANAL BR 18 1 1 EXT NAL: ACRS 1 0 LPDR 03 1 1 NATL LAB 21 5 5 NSIC 04 1 1 NTIS 1 1 JUL 30 198 TOTAL NUMBER OF COPIES REQUIRED: LTTRI ENCL

Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 K. P. BASKIN TELEPHONE MANAGER OF NUCLEAR ENGINEERING, July 22, 1981 (213) 572-1401 SAFETY, AND LICENSING Director, Office of Nuclear Reactor Regulation Attention: Mr. Frank Miraglia, Branch Chief Licensing Branch No. 3 (

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 San Onofre Nuclear Generating Station Units 2&3 In accordance with the July 6, 1978 approval of the Preoperational Monitoring Program (PMP) for San Onofre Units 2&3, the results of the PMP have been incorporated into the 1980 Annual Report for San Onofre Nuclear Generating Station. Volume III presents the Marine Environmental Analysis and Interpretations. Copies of Volume III are being sent to both the Office of Inspection and Enforcement, Region V, and the Division of Project Management as required by the Unit 1 Environmental Technical Specifications (ETS) and the approval for the Preoperational Monitoring Program for Units 2&3.

In 1978, the PMP was initiated in compliance with requirements of the Nuclear Regulatory Commission. The PMP along with other environmental monitoring programs provides a baseline of oceanographic and marine biological data prior to the operation of Units 2&3. The Preoperational Monitoring Program is complimentary to the Unit 1 ETS program and essentially expands the study area further offshore into the area of Units 2&3 diffusers. The PMP was started in June, 1978, and terminated in June, 1980, with 24 months of oceanographic and biological studies.

Enclosed are seven copies of Volume III of the 1980 Annual Report for San Onofre Nuclear Generating Station. NRC distribution should be in accordance with distribution Code No. B028. If there are any questions, please contact me.

Very truly yours, 5 Enclosures b cc: R. H. Engelken, NRC Region V Leonard Burtman - CRWQCB, San Diego Region 6107270064 810722 PDR ADOCK 05000361 PDR