ML17334A534

From kanterella
Revision as of 00:58, 4 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Updated FSAR for DC Cook Nuclear Plant,Units 1 & 2. Description of QA Program Addressed in Section 1.7 Expanded
ML17334A534
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/20/1984
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML17334A535 List:
References
AEP:NRC:0509D, AEP:NRC:509D, NUDOCS 8407260106
Download: ML17334A534 (2)


Text

lNDlANA 8 NlCHIGAN ELECTRlC CONPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 July 20, 1984 AEP:NRC:0509D Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 FSAR UPDATE Compliance with 10 CFR 50.71(e)

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

We are transmitting to you under separate cover thirteen (13) copies of the page changes associated with the 1984 updated version of the Final Safety Analysis Report (FSAR) for the Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2, as recpxired by 10 CFR 50.71(e). A list of replacement pages is included with each set.

At the recpxest of the NRC Regional staff, we have expanded the description of the Quality Assurance Program addressed in Section 1.7.

We believe the expanded description continues to satisfy the criteria of 10 CFR 50, Appendix B.

The updates of Chapters 3 and 14 for Unit 1 have been prepared by our fuels vendor. As of this transmittal date, we have identified no discrepancies with that input; however, our review is not complete. We will continue to review the changes to those Chapters, and will notify the NRC if any significant discrepancies are identified.

Please note that we have dated the pages of this update of the FSAR with "July 1984" to establish a point of reference for future updates.

We hereby certify that the information contained in this update to the FSAR, to the best of our knowledge, accurately presents changes made since the previous submittal.

C lo Letter to Mr. Harold R. Denton AEP:NRC:0509D This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, Al xich

'~

g49.

ice Pr sident '1 MPA/dew Attachment CC: John E. Dolan W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff E. R. Swanson, NRC Resident Inspector - Bridgman