ML18227A390

From kanterella
Revision as of 18:42, 2 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Attached June, 1975, Operating Status Reports for Turkey Point Unit Nos. 3 & 4
ML18227A390
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/03/1975
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A390 (15)


Text

MONTHLY REPORTS (FOR GRAY BOOK PREPARATION)

NRC TRIBUTION FOR PART 50 DOCK .NIATERIAL (TEMPORARY FORM)

CONTROL NO:

\

FII F MONTHLY REPORT FILE FROM Florida Power & Light Co DATE OF DOC DATE R EC'D LTR TWX RPT OTHER Miami, Fla, AD Shmd TO: ORIG CC OTHER SENT AEC PDR~R~P i Signed CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXXX 50-25 25k DESCR IPTION: ENCLOSURES:

, Ltr trans the following: Monthly Report for June 1975 Plant & Component Operability 6 Availability This Report: to be used in preparing Gray Book by Plans & Operations.

IRHBER OF COPIES REC'D: .

PLANT NAME Turkey T k Point 3 & 4 FOR ACTION/INFORMATION ~ m,A V ~~ 'CR 7-8-75 BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARk (L) STOLZ (L) DICKER (E) g LEAR (L)

W/ Copies W/ Copies W/ Copies W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E) SPELS W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E)~ MIPC/PE W/ Copies W/ Copies W/ Copies W.4 Copies INTE R MAL D I STR I BUT ION TECH REVIEW DENTON LIC ASST 'A/T IND .

SCHROEDER GRIMES R. DIGGS (L) BRAITMAN OGC, ROOM P-506A. MACCARY GAMMILL H. GEAR IN (L) SALTZMAN GOSS I C K/STAF F KNIGHT KASTNER E. GOULBOURNE (L) MELTZ .

CASE PAW LICK I BALLAR0 P, KREUTZER (E)

PLANS Gl AM8USSO SHAO SPANG LE R J. LEE (L)

BOYD STE LLO M. MAIGRET (L) ~MCDONALD MOORE (L) HOUSTON ENVI RO S. REED (E) CHAPMAN DEYOUNG (L) NOVAK MUL LE R M. SERVICE (L) DUBE (Ltr)

SKOVHOLT (L) ROSS DICKER S. SHEPPARD (L) E. COUPE GOLLER (L) (Ltr) IPPO LITO KNIGHTON M. SLATER (E) PETERSON P. COLLINS TED ESCO YOUNG B LOOD H. SMITH (L) HARTFIELD (2)

DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAINAS PROJECT LDR G. WILI IAMS (E) EISENHUT FILE & REGION (2) BENAROYA V. WILSON (L) WIGGINTON T.R. WILSON VOI LMER HAR LESS INGRAM (L)

'STEELE

~ -XTERNAL DISTRIBUTION

~1 LOCAL PDR p NATIONALLABS PD R-SAN/LA/NY

~1 TIC (ABER ATHY) (1)(2)(10) 1 BROOKHAVEN NAT LAB

~1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rrn E-201 Gl 1 1 ASLB 1 CONSULTANTS 1 G. ULRIKSON, ORNL 1 Newton Anderson NEWMARK/8LUME/AGBABIAN 1 AGMED (RUTH GUSSMAN)

ACRS HOLDING/SENT Rrn B-127 GT 1 J. D. RUNKLES, Rin E-201 GT

.O. IDX 8100 MIAMI,B.OIIIOA 3$ IOI

.<%life f/)g+

FLORIDA POWER 5 LIGHT COiVIPANY Pg,~C,S f ~~i, ),-,

July 3, 1975 CD (p

l- JUf g i/7~I" Office of Management Information II S. l'V/(I.>> pi;jjpv and Program Controls U.S. Nuclear Regulatory Commission Ljl e>> ij(~

Washington, D. C. 20555 Gentlemen:

Attached are the June, 1975 Operating Status Reports for Turkey Point Units Nos. 3 and 4.

Very truly yours, g

/'.

chmidt Vice President Power Resources VTC/mid Attachments cc: Mr. Norman C. Moseley Jack 'R. Newman, Esquire 1218 IIbLPIYG BUILD FLO'~IOA

'I I

'0 l h Wl ~ e* ~

f pl

~

E i( P

~p 1

~p

I ~ ~ ~

I

~ I III I ~ I I I 0 ~ Ii I ~ I

~

~ I I I I

I

~ a

~ ~

~ I ~

I'L

~ ~ l a

~

~ ~

~

' I~ ~

~ ~

~

~ ~ ~ ~

I~ ~

a ~

~ I ~

~ ~

~ ~

~ a I ~ ~ ~ 4 a

~

~ a I ~

~ ' ~ a a I~ I I ~ Ia a I ~ ~

~ ~

0 ~ ~- I ~ ~ I I~ I I ' ~

lI I ~

'I ~

~ ~

a

~ ~

~ I

~ I ~

I ~

ENCLOSURE A.

DOCKET~0; UNIT NAME Turkey Point Unit No. 3 July 1, 1975 00i%'LETED BY Mary Lee Montgom'cry TELEPHOiNE NO.. 305 245-2910 -Fxt. 2

'I ~

'DAILY 'UNIT POIKR OUTPUT hoiVIH June AVERAGE DAILY'N)'e-net DAY AVERAGE DAILY hive-net 639 20 639 21 636 623'19 22 640 4 640 23 '39

~

~

24' '627' 622'34 629 630 26. 630 '

550 ~

. 625 28 622 10 624 29

" '616 620 30 612 31 13 625 622 '

, 15 622 623 629 3.8 633 638

~ 4,l Docket No. 50-250 Unit No. 3 reactor was 'I I' UNIT.M1E . Turke Point Unit No. 3 operated at full power except'. for reducing load to perform the periodic Jul '1, 197 5 turbine valve t,ests on June 27, 1975, PREPARED BY TELEPHONE . '0Mar Lee Mont orner 245-2910 Ext. 228 REPORT M3iVVH June',

'1975'NIT SHUTDOWNS/REDUCTIONS.

E MF.THOD OF F-FORCED DURATION SHUTTING DO)(N KO. S-SCHEDULED HOURS) 'REASON ~ THE REACTOR "* CO%1 ENTS 19 75-0 6-27 0 N/A Load on Unit No. 3 reduced to perform periodic test of turbine main steam stop and control valves, reheat intercept and reheat stop valves. 'Non-Nuclear systems)

~ ~

~ "'EASON: 'i ** METHOD:

A-EQJIPiK FAILURE (EXPLAIN@ 1-I ihXUAL B-i~fAINT. OR TEST 2-NIAL SQMi C-REFUELING 3-AUTOMATIC SCRAM D-REGULATORY RESTRICTION E-OPERATOR TRAINIiNG AND LICENSE EXAMINATION F-AD>HNISTRATIVE G-OPERATIOi AL ERROR H-OTHER (nPLAIN) n

ENCLOSURE A DOCKET NO. 50-251

'UNIT NAME . Turkey Point Unit No. 4

.EATH ~

July 1, 1975 KM'LETED BY Mary Lee Montomery TELEPJ 10NE NO. (305 245-2910 Ext. 228

'DAILY UNIT 'OWER OUTPUT N3NIH June 197 5 AVERAGE DAILY N<e-net DAY AVHBA(Z DAILY N<e-net 20 21 36

.22 143 407 24 25 595 26.

27 '526'83 28 10 29

" '66K 30 '6'63 31 13 15 19

I ppcl',ET HO. 50-251 UNIr NAML: TURKEY POXNT NO 4 PORT HONTH JUNE 1975

~

~

DAIE JULY 1, 1975 CgsgiLI";I'IiD BY Kh,RY LEE NONTC~OMERY TELEIiHOVE 305 245-2910 Ext. 228 OPERATING S.TATUS REPORTING. PERIOD: 0001 75 06 01 TIIROUGH 2400'5 06 klOURS IN REPOI<TING PERIOD: 720:0 30'ROSS.

2. CURRENTLY AUBIORIZED POKR LEVEL (gfg) . 2200 MAX. DEPEND. CAPACITY (Mfe NET)

POEM LEVEL TO NIICH RESTRICTED (IF ANY): (MVe NET) None

4. REASONS FOR RESTRICTIONS (IF ANY):

TklIS LATIVE MORI YR- TO-DATE'UiiU TO DATE

5. NOSER OF HOURS 'IHE REACTOR CRITICAL ...........;.............;.;

WAS

.. 287. 9 2323.6 ll 657.4 6.. REACTOR RESERVE SMJIDO1% HOURS ........ 97.3 97.3';

. HOURS GENERATOR OiV LINE ............; 218. 8 2232.0 11 289.9 8." UNIT RESERVE SkIUTImh'N HOURS ......; .. 9. GROSS TkIE15IAL EiVERGY GEiVERATED(M)H) .. 354 306 4659 680 23 011 890

10. GROSS ELECTRICAL DiERGY GENERATED

'fhILtg ll1 I l)3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

(P<IL ~ ~ ~ ~

115 098 1510 476 7 284 737 ll: NET ELECTRICAL ENERGY GENERATED (Mh'H) 104 538 1429 108 6 898 164 12, RECTOR AVAILAB LITY FACTOR Ql 40.0 53.5 73. 4

13. 'NIT AVAILABILITYFACTOR Q2 30.4 51.4 71.1
14. UNIT CAPACITY FACfOR J3,.............. 21.8 49.4 66.5 f
15. UNIT FORCED OUTAGE RATE g4 0.9 0.1 4.8
16. SHtJID01NS SCHEDULED OVER. NEXT 6 MOiVVI1S (TYPE, DATE AND DURATION OF EACH):

None

17. IF SHUTD01% AT END OF REPORT PERIOD, ESTDIATED DATE OF STARTUP:

I-IOURS REACTOR WAS CRITICAL X 100 REACTOR AVAILABILITYFACTOR GROSS HOURS IN REPOI<TIN PERIOD HOURS GEiVERATOR-ON LINE X- 100 UNIT AVAILABILITYFACTOR GROSS HOUI~ IN I~~RT PERIOD NET ELECTRICAI POWER GENERATED X 1 0 0 FACTOR MAX. DLiPEiVDAHLE CAI'ACI'IY X GROSS HOURS IN REPORT PERIOD FORCED OtJTAGE HOURS X 100 kIOURS GENL'IKfOR ON I.IiVE +

FORCED OUTAGE l IOVIS

SUK~1ARY: Unit. No. 4 was.returned to service Docket No. 50'-, 251 on June 21, 1975 after completion of ~ ,.- GAIT YME -. Turke Point Unit No. 4 and inspections. Reactor was refueling'aintenance, returned to full power based on performance DATE- Jul:

I 1 1975 of reactor physics test'program. Unit No.'

performance was satisfactory ex'cept for mal- PREPARED BY Mar Lee Yiont orner functions of heater drain pump discharge control valve actuator linkage on June 27, 1975.

TELEPHONE (3051 245-291 t. 2 and condenser tube leak on June 28, 1975.

REPORT ~oiiH June,'975 UN IT SHUTDONNS/RE'DUCT I ONS 1 PE i~1ETHOD OF F-FORCED DURATION SHUTTING DO%if XO. S-SCHEDULED 0-AMOURS) REASON

  • THE ACTOR COP<ANTS 05 75-03-29 S 496. 5 Unit No. 4 was removed from service (de3.iberate manual shutdown) for refueling, maintenance and inspection: {Nuclear and.non-Nuclear'.systems) 06 75-06-22 2.7 B ,

N/A Unit No. 4 was removed from service to perform turbine overspeed trip test. (Non-Nuclear system) 07 75-06-22 N/A Load on Unit No. 4 was reduced to 54% R;P.. to clean steam generator feedwater pump No. 4A suction strainer. {Non-Nuclear system).

08 75-06-27 2.0 A Reactor tripped by steam generator No. 4A low level in coincidence with steam flow greater =than feedwater flow during transient caused by malfunction of heater drain pump discharge contiol valve actuator linkage. (Non-Nuclear syst'm). '

09 75>>06-28 >>0 A ~

AN/A Load on Unit No. 4 was-reduced to 40$ R.P. to repair condenser tube leak (Non-Nuclear system)

  • REASON -; ** METHOD:

'-EQJIPiiKNT FAILURE {'EXPLAIN/ 1-M4%JAL B-iWINT. OR TEST 2-h~egAL SCRui C-REFUELING ~

g A~~(<TIC'CRAM D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER (EXPLAIN)