|
---|
Category:Letter
MONTHYEARIR 05000250/20240032024-11-13013 November 2024 Integrated Inspection Report - 05000250/2024003 & 05000251/2024003 & Notice of Violation L-2024-188, Supplement to License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-11-12012 November 2024 Supplement to License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-187, Supplement to the Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-11-12012 November 2024 Supplement to the Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles ML24305A1482024-11-0606 November 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 ML24276A2162024-11-0101 November 2024 Request for Withholding Information from Public Disclosure L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure 2024-09-25
[Table view] Category:Operating Report
MONTHYEARL-2022-039, And Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 And Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
MONTHLY REPORTS (FOR GRAY BOOK PREPARATION)
NRC TRIBUTION FOR PART 50 DOCK .NIATERIAL (TEMPORARY FORM)
CONTROL NO:
\
FII F MONTHLY REPORT FILE FROM Florida Power & Light Co DATE OF DOC DATE R EC'D LTR TWX RPT OTHER Miami, Fla, AD Shmd TO: ORIG CC OTHER SENT AEC PDR~R~P i Signed CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXXX 50-25 25k DESCR IPTION: ENCLOSURES:
, Ltr trans the following: Monthly Report for June 1975 Plant & Component Operability 6 Availability This Report: to be used in preparing Gray Book by Plans & Operations.
IRHBER OF COPIES REC'D: .
PLANT NAME Turkey T k Point 3 & 4 FOR ACTION/INFORMATION ~ m,A V ~~ 'CR 7-8-75 BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)
W/ Copies W/ Copies W/ Copies W/ Copies CLARk (L) STOLZ (L) DICKER (E) g LEAR (L)
W/ Copies W/ Copies W/ Copies W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E) SPELS W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E)~ MIPC/PE W/ Copies W/ Copies W/ Copies W.4 Copies INTE R MAL D I STR I BUT ION TECH REVIEW DENTON LIC ASST 'A/T IND .
SCHROEDER GRIMES R. DIGGS (L) BRAITMAN OGC, ROOM P-506A. MACCARY GAMMILL H. GEAR IN (L) SALTZMAN GOSS I C K/STAF F KNIGHT KASTNER E. GOULBOURNE (L) MELTZ .
CASE PAW LICK I BALLAR0 P, KREUTZER (E)
PLANS Gl AM8USSO SHAO SPANG LE R J. LEE (L)
BOYD STE LLO M. MAIGRET (L) ~MCDONALD MOORE (L) HOUSTON ENVI RO S. REED (E) CHAPMAN DEYOUNG (L) NOVAK MUL LE R M. SERVICE (L) DUBE (Ltr)
SKOVHOLT (L) ROSS DICKER S. SHEPPARD (L) E. COUPE GOLLER (L) (Ltr) IPPO LITO KNIGHTON M. SLATER (E) PETERSON P. COLLINS TED ESCO YOUNG B LOOD H. SMITH (L) HARTFIELD (2)
DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAINAS PROJECT LDR G. WILI IAMS (E) EISENHUT FILE & REGION (2) BENAROYA V. WILSON (L) WIGGINTON T.R. WILSON VOI LMER HAR LESS INGRAM (L)
'STEELE
~ -XTERNAL DISTRIBUTION
~1 LOCAL PDR p NATIONALLABS PD R-SAN/LA/NY
~1 TIC (ABER ATHY) (1)(2)(10) 1 BROOKHAVEN NAT LAB
~1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rrn E-201 Gl 1 1 ASLB 1 CONSULTANTS 1 G. ULRIKSON, ORNL 1 Newton Anderson NEWMARK/8LUME/AGBABIAN 1 AGMED (RUTH GUSSMAN)
ACRS HOLDING/SENT Rrn B-127 GT 1 J. D. RUNKLES, Rin E-201 GT
.O. IDX 8100 MIAMI,B.OIIIOA 3$ IOI
.<%life f/)g+
FLORIDA POWER 5 LIGHT COiVIPANY Pg,~C,S f ~~i, ),-,
July 3, 1975 CD (p
l- JUf g i/7~I" Office of Management Information II S. l'V/(I.>> pi;jjpv and Program Controls U.S. Nuclear Regulatory Commission Ljl e>> ij(~
Washington, D. C. 20555 Gentlemen:
Attached are the June, 1975 Operating Status Reports for Turkey Point Units Nos. 3 and 4.
Very truly yours, g
/'.
chmidt Vice President Power Resources VTC/mid Attachments cc: Mr. Norman C. Moseley Jack 'R. Newman, Esquire 1218 IIbLPIYG BUILD FLO'~IOA
'I I
'0 l h Wl ~ e* ~
f pl
~
E i( P
~p 1
~p
I ~ ~ ~
I
~ I III I ~ I I I 0 ~ Ii I ~ I
~
~ I I I I
I
~ a
~ ~
~ I ~
I'L
~ ~ l a
~
~ ~
~
' I~ ~
~ ~
~
~ ~ ~ ~
I~ ~
a ~
~ I ~
~ ~
~ ~
~ a I ~ ~ ~ 4 a
~
~ a I ~
~ ' ~ a a I~ I I ~ Ia a I ~ ~
~ ~
0 ~ ~- I ~ ~ I I~ I I ' ~
lI I ~
'I ~
~ ~
a
~ ~
~ I
~ I ~
I ~
ENCLOSURE A.
DOCKET~0; UNIT NAME Turkey Point Unit No. 3 July 1, 1975 00i%'LETED BY Mary Lee Montgom'cry TELEPHOiNE NO.. 305 245-2910 -Fxt. 2
'I ~
'DAILY 'UNIT POIKR OUTPUT hoiVIH June AVERAGE DAILY'N)'e-net DAY AVERAGE DAILY hive-net 639 20 639 21 636 623'19 22 640 4 640 23 '39
~
~
24' '627' 622'34 629 630 26. 630 '
550 ~
. 625 28 622 10 624 29
" '616 620 30 612 31 13 625 622 '
, 15 622 623 629 3.8 633 638
~ 4,l Docket No. 50-250 Unit No. 3 reactor was 'I I' UNIT.M1E . Turke Point Unit No. 3 operated at full power except'. for reducing load to perform the periodic Jul '1, 197 5 turbine valve t,ests on June 27, 1975, PREPARED BY TELEPHONE . '0Mar Lee Mont orner 245-2910 Ext. 228 REPORT M3iVVH June',
'1975'NIT SHUTDOWNS/REDUCTIONS.
E MF.THOD OF F-FORCED DURATION SHUTTING DO)(N KO. S-SCHEDULED HOURS) 'REASON ~ THE REACTOR "* CO%1 ENTS 19 75-0 6-27 0 N/A Load on Unit No. 3 reduced to perform periodic test of turbine main steam stop and control valves, reheat intercept and reheat stop valves. 'Non-Nuclear systems)
~ ~
~ "'EASON: 'i ** METHOD:
A-EQJIPiK FAILURE (EXPLAIN@ 1-I ihXUAL B-i~fAINT. OR TEST 2-NIAL SQMi C-REFUELING 3-AUTOMATIC SCRAM D-REGULATORY RESTRICTION E-OPERATOR TRAINIiNG AND LICENSE EXAMINATION F-AD>HNISTRATIVE G-OPERATIOi AL ERROR H-OTHER (nPLAIN) n
ENCLOSURE A DOCKET NO. 50-251
'UNIT NAME . Turkey Point Unit No. 4
.EATH ~
July 1, 1975 KM'LETED BY Mary Lee Montomery TELEPJ 10NE NO. (305 245-2910 Ext. 228
'DAILY UNIT 'OWER OUTPUT N3NIH June 197 5 AVERAGE DAILY N<e-net DAY AVHBA(Z DAILY N<e-net 20 21 36
.22 143 407 24 25 595 26.
27 '526'83 28 10 29
" '66K 30 '6'63 31 13 15 19
I ppcl',ET HO. 50-251 UNIr NAML: TURKEY POXNT NO 4 PORT HONTH JUNE 1975
~
~
DAIE JULY 1, 1975 CgsgiLI";I'IiD BY Kh,RY LEE NONTC~OMERY TELEIiHOVE 305 245-2910 Ext. 228 OPERATING S.TATUS REPORTING. PERIOD: 0001 75 06 01 TIIROUGH 2400'5 06 klOURS IN REPOI<TING PERIOD: 720:0 30'ROSS.
- 2. CURRENTLY AUBIORIZED POKR LEVEL (gfg) . 2200 MAX. DEPEND. CAPACITY (Mfe NET)
POEM LEVEL TO NIICH RESTRICTED (IF ANY): (MVe NET) None
- 4. REASONS FOR RESTRICTIONS (IF ANY):
TklIS LATIVE MORI YR- TO-DATE'UiiU TO DATE
- 5. NOSER OF HOURS 'IHE REACTOR CRITICAL ...........;.............;.;
WAS
.. 287. 9 2323.6 ll 657.4 6.. REACTOR RESERVE SMJIDO1% HOURS ........ 97.3 97.3';
. HOURS GENERATOR OiV LINE ............; 218. 8 2232.0 11 289.9 8." UNIT RESERVE SkIUTImh'N HOURS ......; .. 9. GROSS TkIE15IAL EiVERGY GEiVERATED(M)H) .. 354 306 4659 680 23 011 890
- 10. GROSS ELECTRICAL DiERGY GENERATED
'fhILtg ll1 I l)3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
(P<IL ~ ~ ~ ~
115 098 1510 476 7 284 737 ll: NET ELECTRICAL ENERGY GENERATED (Mh'H) 104 538 1429 108 6 898 164 12, RECTOR AVAILAB LITY FACTOR Ql 40.0 53.5 73. 4
- 13. 'NIT AVAILABILITYFACTOR Q2 30.4 51.4 71.1
- 14. UNIT CAPACITY FACfOR J3,.............. 21.8 49.4 66.5 f
- 15. UNIT FORCED OUTAGE RATE g4 0.9 0.1 4.8
- 16. SHtJID01NS SCHEDULED OVER. NEXT 6 MOiVVI1S (TYPE, DATE AND DURATION OF EACH):
None
- 17. IF SHUTD01% AT END OF REPORT PERIOD, ESTDIATED DATE OF STARTUP:
I-IOURS REACTOR WAS CRITICAL X 100 REACTOR AVAILABILITYFACTOR GROSS HOURS IN REPOI<TIN PERIOD HOURS GEiVERATOR-ON LINE X- 100 UNIT AVAILABILITYFACTOR GROSS HOUI~ IN I~~RT PERIOD NET ELECTRICAI POWER GENERATED X 1 0 0 FACTOR MAX. DLiPEiVDAHLE CAI'ACI'IY X GROSS HOURS IN REPORT PERIOD FORCED OtJTAGE HOURS X 100 kIOURS GENL'IKfOR ON I.IiVE +
FORCED OUTAGE l IOVIS
SUK~1ARY: Unit. No. 4 was.returned to service Docket No. 50'-, 251 on June 21, 1975 after completion of ~ ,.- GAIT YME -. Turke Point Unit No. 4 and inspections. Reactor was refueling'aintenance, returned to full power based on performance DATE- Jul:
I 1 1975 of reactor physics test'program. Unit No.'
performance was satisfactory ex'cept for mal- PREPARED BY Mar Lee Yiont orner functions of heater drain pump discharge control valve actuator linkage on June 27, 1975.
TELEPHONE (3051 245-291 t. 2 and condenser tube leak on June 28, 1975.
REPORT ~oiiH June,'975 UN IT SHUTDONNS/RE'DUCT I ONS 1 PE i~1ETHOD OF F-FORCED DURATION SHUTTING DO%if XO. S-SCHEDULED 0-AMOURS) REASON
- THE ACTOR COP<ANTS 05 75-03-29 S 496. 5 Unit No. 4 was removed from service (de3.iberate manual shutdown) for refueling, maintenance and inspection: {Nuclear and.non-Nuclear'.systems) 06 75-06-22 2.7 B ,
N/A Unit No. 4 was removed from service to perform turbine overspeed trip test. (Non-Nuclear system) 07 75-06-22 N/A Load on Unit No. 4 was reduced to 54% R;P.. to clean steam generator feedwater pump No. 4A suction strainer. {Non-Nuclear system).
08 75-06-27 2.0 A Reactor tripped by steam generator No. 4A low level in coincidence with steam flow greater =than feedwater flow during transient caused by malfunction of heater drain pump discharge contiol valve actuator linkage. (Non-Nuclear syst'm). '
09 75>>06-28 >>0 A ~
AN/A Load on Unit No. 4 was-reduced to 40$ R.P. to repair condenser tube leak (Non-Nuclear system)
'-EQJIPiiKNT FAILURE {'EXPLAIN/ 1-M4%JAL B-iWINT. OR TEST 2-h~egAL SCRui C-REFUELING ~
g A~~(<TIC'CRAM D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER (EXPLAIN)